flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use, mixed-income development under construction in Salt Lake City

Mixed-Use

Mixed-use, mixed-income development under construction in Salt Lake City

KTGY Architecture + Planning is designing the project.


By David Malone, Associate Editor | March 22, 2021
225 South Slate Street ground level

Renderings courtesy KTGY Architecture + Planning

Construction has commenced at 225 South Slate Street in downtown Salt Lake City, a 190-unit, mid-rise and high-rise, mixed-use community. The transit-oriented development will add affordable housing, commercial tenants, non-profit arts organizations, a food hall, an event space, and live-work units to enhance the city’s downtown business district.

The development comprises two towers, one rising eight stories and one rising 12. The 190 residential units are split between the towers with 168 units designated affordable for renters earning between 20% and 80% of the area median income. The units will include a mix of studio, one-, two-, three-, and four-bedroom apartments. Two at-grade artist live-work spaces are also included and will allow the development to appeal to young professional singles and families alike.

 

225 South Slate Street in Salt Lake City

 

The two mixed-use buildings are connected by an open-air paseo that connects them to the new development to the adjacent commercial uses, including a coffee shop, a record store, and neighborhood creative office space. “Commercial tenants, event space, food hall and live-work units will line the paseo on the ground floors, while the residential units are located on the upper levels. The food hall, which is unique to the community, will draw lunch-time workers during the day and urban dwellers at night,” said Keith McCloskey, LEED AP, Associate Principal, KTGY, in a release.

The eight-story tower will utilize standard construction techniques and materials while the 12-story tower will leverage a steel structural system by Infinity Structures aimed at shortening the overall construction timeline and achieving more affordable construction costs. Construction for the entire project is estimated to take 24 months.

 

225 South Slate Street paseo

 

225 South Slate Street aerial

Tags

Related Stories

Mixed-Use | Jan 18, 2017

Frank Gehry’s Grand Avenue Project in Los Angeles may finally be ready to break ground

The oft-delayed project was set to begin in 2007 but was halted due to the recession.

Mixed-Use | Dec 1, 2016

Amsterdam’s new sustainable mixed-use building embraces the idea of living on the water

The Sluishuis employs a unique shape that makes it appear different from every vantage point.

Mixed-Use | Dec 1, 2016

Initial work on mixed-use development, The Parks at Walter Reed, is underway

The D.C. development is the product of a partnership between Hines, Urban Atlantic, and Triden Development Group.

Multifamily Housing | Dec 1, 2016

One of Canada’s largest media companies dives into real estate development

Rogers moves forward on M City, a multi-building, multi-year project in a Toronto suburb.

Office Buildings | Nov 15, 2016

Under Armour unveils phase one of 50-acre Baltimore headquarters

The campus will be located in Baltimore’s $5.5 billion Port Covington redevelopment project.

Mixed-Use | Nov 10, 2016

Terraced mixed-use development planned for Shanghai’s urban city ring

The development will be highly accessible and provide ‘humanism’ to the area.

High-rise Construction | Nov 1, 2016

Winthrop Square will give rise to Boston’s second tallest building

The building will become the tallest residential tower in the city.

Mixed-Use | Oct 31, 2016

New Frank Gehry project on Sunset Boulevard moves forward with a few compromises

Among the compromises, the 8150 Sunset Blvd. project will see its tallest residential tower reduced by 56 feet.

Mixed-Use | Sep 27, 2016

10 Design wins competition to design huge mixed-use development in China

China Resources Land, New Fenghong Real Estate Development, and China Resources Trust have designated 50 billion yuan for the construction of the development.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021