flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use Dubai tower will have the world’s tallest ceramic facade

Mixed-Use

Mixed-use Dubai tower will have the world’s tallest ceramic facade

The 63-story tower will house a Mandarin Oriental hotel, residences, and restaurants.


By David Malone, Associate Editor | October 19, 2017
Wasl Tower with the Burj Khalifa in the background

Courtesy UNStudio

Dubai’s skyline will claim another architectural world title in 2020 when construction completes on the world’s tallest building with a ceramic facade. The twisted mixed-use Wasl Tower will rise 300 meters and comprise a five-star Mandarin Oriental hotel, private residences, and a variety of restaurants. The Mandarin Oriental Hotel Group will manage both the hotel and residences.

257 guestrooms, suites, and serviced apartments will be located on floors 16 to 38 and provide views of the nearby Burj Khalifa. 144 residential units will be located on the tower’s top floors. They will have their own private access and dedicated facilities, such as a Resident’s Lounge. Residents will also benefit from the Mandarin Oriental’s service and direct access to the hotel.

 

Wasl Tower at nightCourtesy UNStudio.

 

A variety of restaurants and bars will be featured in the building such as a rooftop skybar, an all-day dining venue, a poolside bar and restaurant, a lobby lounge, a club lounge, a cigar room, and a Mandarin Oriental Cake Shop. A double level sky lobby on floors 35 and 36 will include the club lounge, the all-day dining venue, a lifestyle lounge, and a tea lounge. Banqueting and meeting spaces will accommodate social and business events.

The Spa at Mandarin Oriental, a two-story facility, will feature 12 private treatment rooms, a fitness center, vitality pools, heat and water therapies, and an outdoor swimming pool set within a landscaped garden terrace.

 

One of Wasl Tower's roomsCourtesy UNStudio.

 

At night, solar-powered lights will be programmed to make it appear as if the ceramic-clad building is breathing (see video below). The tower’s structural system consists of a central concrete core plus outriggers on four levels.

UNStudio designed the building in collaboration with German engineering firm Werner Sobek.

 

Related Stories

| Aug 11, 2010

Gold Award: Westin Book Cadillac Hotel & Condominiums Detroit, Mich.

“From eyesore to icon.” That's how Reconstruction Awards judge K. Nam Shiu so concisely described the restoration effort that turned the decimated Book Cadillac Hotel into a modern hotel and condo development. The tallest hotel in the world when it opened in 1924, the 32-story Renaissance Revival structure was revered as a jewel in the then-bustling Motor City.

| Aug 11, 2010

Silver Award: Palmer House Hilton Hotel & Shops Chicago, Ill.

Chicago's Palmer House Hilton holds the record for the longest continuously operated hotel in North America. It was originally built in 1871 by Potter Palmer, one of America's first millionaire developers. When it was rebuilt after the Great Chicago Fire it became the first hotel in the U.S. to put a telephone in every room.

| Aug 11, 2010

Gulf Coast Hotel's Stormy Road to Recovery

After his initial tour of the dilapidated 1850s-era Battle House Hotel, Ron Blount, construction manager with Retirement Systems of Alabama, said to his boss: “You need a priest more than you need a contractor.” Those words were more prescient to RSA's restoration of the historic Mobile landmark than he could have known at the time.

| Aug 11, 2010

Lifestyle Hotel Trends Around the World

When the Rocco Forte Collection opens the Verdura Golf & Spa Resort in Sicily in early 2009, the 200-room luxury property will be one of the world's newest lifestyle hotels. Lifestyle hotels cater to guests seeking a heightened travel experience, which they deliver by offering distinctive—some would say avant-garde, or even outrageous—architecture, room design, amenities, and en...

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021