flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use development under construction in Detroit’s central business district

Mixed-Use

Mixed-use development under construction in Detroit’s central business district

The development is being built on the former site of the Statler Hotel.


By David Malone, Associate Editor | January 16, 2018
CBD Detroit exterior rendering

Rendering courtesy of City Club Apartments

In 2005, the historic 18-floor, 800-room Statler Hotel was torn down, leaving one of the most exclusive corners in downtown Detroit vacant. Now, over a decade later, a new mixed-use development has broken ground at the corner of Washington Boulevard and Park Avenue.

City Club Apartments — Central Business District (CBD) Detroit will include approximately 288 apartments and penthouses and 13,000 sf of street level space, which will feature a pet store, a restaurant, and a gourmet market. “City Club Apartments—CBD Detroit will combine the service and amenities of a five-star hotel with engaging and connected urban apartment living,” says Jonathan Holtzman, Chairman and CEO of City Club Apartments, in a release.

The new $70 million mixed-use community will feature amenities such as movie theaters, social programming, valet parking, 24/7 concierge services, an entertainment club room with a gourmet kitchen, and wellness and exercise rooms. An indoor/outdoor pool and hot tub will connect to a private park and a dog park will also be available to residents.

 

Outdoor court yard space included in CBA DetroitRendering courtesy City Club Apartments.

 

The residential units will feature exclusively manufactured cabinetry and fixtures. Additionally, advanced and high-speed fiber technologies will be incorporated into the buildings.

20% of the apartments will be affordable. Furnished short-term rentals will also be offered. The apartments and penthouses come in four distinct finish packages and are available in studio, convertible, one-bedroom, and two-bedroom units.

The project is the first ground-up, mixed-use, conventionally financed high-rise to be built in Detroit’s central business district in 30 years. Pre-leasing will begin in summer 2018 with occupancy slated to begin in winter 2018. The Building Team includes BKV Group (architect), Damon Farber (landscape architect), and Wolverine Building Group (contractor).

Related Stories

Mixed-Use | Oct 22, 2019

The LINK PHX mixed-use development opens in Downtown Phoenix

Shepley Bulfinch designed the project.

Mixed-Use | Oct 18, 2019

BIG designs new vertical neighborhood for South America’s greenest capital

The project is Bjarke Ingels Group’s second in Ecuador.

Mixed-Use | Oct 16, 2019

River Rock mixed-use community breaks ground in Chattanooga

The Beach Company is developing the project.

Mixed-Use | Oct 15, 2019

Skybridges connect SOM’s two trapezoidal Buenos Aires towers

The project aims to become the center of activity in the city’s Catalinas Norte business district expansion.

Mixed-Use | Oct 9, 2019

OMA’s KaDeWe combines retail, a hotel, and a rooftop park in one building

The project will establish urban connections and public spaces through its own internal organization.

Mixed-Use | Oct 1, 2019

KPF breaks ground on West Lake 66 mixed-use development in Hangzhou

The project hopes to reinvigorate the city’s deteriorated surrounding blocks.

Mixed-Use | Sep 16, 2019

Heatherwick Studio designs a giant planted pergola in Tokyo’s Toranomon-Azabudai district

Japan’s tallest skyscraper, designed by Pelli Clarke Pelli, is also part of the district’s redevelopment.

Multifamily Housing | Aug 19, 2019

Affordable, senior development rises in the Bronx

RKTB Architects is designing the project.

Mixed-Use | Aug 14, 2019

Las Vegas’ $7.9 billion ‘mini-city’ will be a ‘digital revolution in motion’

All of the project’s buildings will be net-zero.

Mixed-Use | Aug 12, 2019

BIG will master plan Saudi Arabia's 'Giga-Project'

Qiddiya is currently under construction 28 miles outside of Riyadh.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021