flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use Arsenal Yards completes in Watertown’s East End

Mixed-Use

Mixed-use Arsenal Yards completes in Watertown’s East End

PCA master-planned the seven-building, one million sf destination and designed the urban village, residences, and open spaces.


By David Malone, Managing Editor | January 10, 2022
Arsenal Yards Watertown
Photos: Anton Grassi Photography

Arsenal Yards, a new mixed-use neighborhood in the heart of Watertown’s East End located at the site of the former Arsenal Mall, is a new neighborhood that brings together a mix of live, work, and play environments. The neighborhood includes more then 50 retailers and restaurants, 108,000 sf of lab and office space, 300 apartment residences, and 146-room hotel.

Two original Arsenal brick buildings anchor the neighborhood and were restored to their original character and size as part of the project. Retail stores and restaurants spill out into the outdoor areas and green spaces, blurring the lines between inside and outside experiences. Walkways wind through Arsenal Yards and connect residents and visitors to the River Green, Watertown’s Arsenal Park, and the bike and pedestrian path along the Charles River.

Arsenal Yards Central Park

PCA provided full design services, including the interiors and tenant amenity spaces, for Arsenal Yards’ residential buildings and the planning and design of structured parking for 1,200 cars. The PCA-designed Arsenal Yards residences, Blvd & Bond Apartments, is comprised of a mix of studio, one-, two-, and three-bedroom apartments. Roof decks, integrated as part of the residential buildings, provide an outdoor respite and a place to entertain. Additional amenity spaces include a fitness center, a work from home area, a game room and adjoining lounge spaces, and a communal kitchen that connects to the rooftop.

Boylston Properties and The Wilder Companies are the project’s development partners.

Arsenal Yards at night

Tags

Related Stories

Mixed-Use | Jan 18, 2017

Frank Gehry’s Grand Avenue Project in Los Angeles may finally be ready to break ground

The oft-delayed project was set to begin in 2007 but was halted due to the recession.

Mixed-Use | Dec 1, 2016

Amsterdam’s new sustainable mixed-use building embraces the idea of living on the water

The Sluishuis employs a unique shape that makes it appear different from every vantage point.

Mixed-Use | Dec 1, 2016

Initial work on mixed-use development, The Parks at Walter Reed, is underway

The D.C. development is the product of a partnership between Hines, Urban Atlantic, and Triden Development Group.

Multifamily Housing | Dec 1, 2016

One of Canada’s largest media companies dives into real estate development

Rogers moves forward on M City, a multi-building, multi-year project in a Toronto suburb.

Office Buildings | Nov 15, 2016

Under Armour unveils phase one of 50-acre Baltimore headquarters

The campus will be located in Baltimore’s $5.5 billion Port Covington redevelopment project.

Mixed-Use | Nov 10, 2016

Terraced mixed-use development planned for Shanghai’s urban city ring

The development will be highly accessible and provide ‘humanism’ to the area.

High-rise Construction | Nov 1, 2016

Winthrop Square will give rise to Boston’s second tallest building

The building will become the tallest residential tower in the city.

Mixed-Use | Oct 31, 2016

New Frank Gehry project on Sunset Boulevard moves forward with a few compromises

Among the compromises, the 8150 Sunset Blvd. project will see its tallest residential tower reduced by 56 feet.

Mixed-Use | Sep 27, 2016

10 Design wins competition to design huge mixed-use development in China

China Resources Land, New Fenghong Real Estate Development, and China Resources Trust have designated 50 billion yuan for the construction of the development.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021