flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use affordable housing project aims for zero waste

Multifamily Housing

Mixed-use affordable housing project aims for zero waste

The Peninsula in the Bronx, N.Y. has a detailed plan to reduce trash, separate recyclables, collect materials for compost.


By Peter Fabris, Contributing Editor | March 31, 2022
The Peninsula ext
The Peninsula just opened its first phase.

The Peninsula in the Bronx, N.Y., a mixed-use affordable housing campus, just opened its first phase. The development has a comprehensive plan to reduce waste, separate recyclable materials, and make it easy for residents to collect compostable materials.
 
The development, which will provide 740 residential units when completed, includes a recently completed commercial structure housing a food incubator and related businesses. This structure contains refrigerated storage and shelf capacity for surplus edible food to preserve it for donations to local partner organizations.

The Peninsula ext 2
The Peninsula includes commercial structure and a food incubator.

Food waste will be collected and put to good use. “Food waste will be separated by the food businesses, and processed into fertilizer within a dry aerobic bio-digester,” says Miflin, who with partner WXY has created a related new initiative called PutWasteToWork. The bio-digester has a capacity of 0.55 tons of food waste a day, and processes it with microbes and heat to create a fertilizer. The bio-digester reduces weight by up to 90% and eliminates pests and odors.

Zero Waste
The Peninsula aims for zero waste.

Infrastructure will be built into residential areas to encourage collection of food waste for composting. Every unit will have undercounter bins for recycling and a caddy for food waste," “They will take these to the refuse rooms on each floor, which also host collections of small items like sharps and batteries,” says Claire Weisz, FAIA, founding principal of WXY.
 
According to the project team, consultants will help train staff, and provide software for tracking all waste types and measuring progress towards zero-waste operations. This is a radically new idea for an affordable community, according to a news release.
 
Owner and/or developer: Hudson Companies, Gilbane Development Co., and MHANY Management Inc. (part of the Mutual Housing Association of New York).
Design architect: WXY architecture + urban design and Body Lawson Associates Architects and Planners
Architect of record: WXY architecture + urban design and Body Lawson Associates Architects and Planners
MEP engineer: Skyline Engineering
Structural engineer: Gedeon GRC Consulting and Christie Engineering
General contractor/construction manager: Broadway Builders and Gilbane
 

Related Stories

University Buildings | Jan 9, 2017

Massive student housing project in Texas will be ready this Fall

Developers hope the early opening of some units sets the tone for the community and future rentals.

Multifamily Housing | Dec 22, 2016

Multifamily green financing programs grew rapidly in 2016

Multifamily green financing programs boomed in 2016, and are likely to continue to grow in 2017, according to the president of Partner Energy.

Market Data | Dec 21, 2016

Will housing adjust to an aging population?

New Joint Center report projects 66% increase in senior heads of households by 2035.

Multifamily Housing | Dec 15, 2016

Multifamily tower in St. Louis uses stacked design to make every apartment a corner unit

Designed by Studio Gang, the building’s stacked tiers will each comprise four floors and fan outwards as they rise up.

Multifamily Housing | Dec 12, 2016

BIG’s first residential condominium in the U.S. completed in Miami

Two 20-story twisting towers comprise 98 units on a three-acre site near Biscayne Bay.

Multifamily Housing | Dec 1, 2016

One of Canada’s largest media companies dives into real estate development

Rogers moves forward on M City, a multi-building, multi-year project in a Toronto suburb.

Multifamily Housing | Nov 28, 2016

Axiometrics predicts apartment deliveries will peak by mid 2017

New York is projected to lead the nation next year, thanks to construction delays in 2016

Sponsored | Multifamily Housing | Nov 11, 2016

Value engineering brings Santa Barbara apartments back on track

When framing estimates for a new apartment complex in Rialto, California, came in too high, a savvy developer decided to have the project value engineered. A switch to glulam and wood-framed shear walls got the project back in the black. 

Adaptive Reuse | Nov 9, 2016

Middle school transformed into affordable housing for seniors

The project received $3.8 million in public financing in exchange for constructing units for residents earning less than 60 percent of the area’s median income.

Multifamily Housing | Oct 28, 2016

Aston Martin is making a foray into real estate in Miami

The British automaker will partner with G and G Business Developments on the waterfront project.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021