flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use affordable housing project aims for zero waste

Multifamily Housing

Mixed-use affordable housing project aims for zero waste

The Peninsula in the Bronx, N.Y. has a detailed plan to reduce trash, separate recyclables, collect materials for compost.


By Peter Fabris, Contributing Editor | March 31, 2022
The Peninsula ext
The Peninsula just opened its first phase.

The Peninsula in the Bronx, N.Y., a mixed-use affordable housing campus, just opened its first phase. The development has a comprehensive plan to reduce waste, separate recyclable materials, and make it easy for residents to collect compostable materials.
 
The development, which will provide 740 residential units when completed, includes a recently completed commercial structure housing a food incubator and related businesses. This structure contains refrigerated storage and shelf capacity for surplus edible food to preserve it for donations to local partner organizations.

The Peninsula ext 2
The Peninsula includes commercial structure and a food incubator.

Food waste will be collected and put to good use. “Food waste will be separated by the food businesses, and processed into fertilizer within a dry aerobic bio-digester,” says Miflin, who with partner WXY has created a related new initiative called PutWasteToWork. The bio-digester has a capacity of 0.55 tons of food waste a day, and processes it with microbes and heat to create a fertilizer. The bio-digester reduces weight by up to 90% and eliminates pests and odors.

Zero Waste
The Peninsula aims for zero waste.

Infrastructure will be built into residential areas to encourage collection of food waste for composting. Every unit will have undercounter bins for recycling and a caddy for food waste," “They will take these to the refuse rooms on each floor, which also host collections of small items like sharps and batteries,” says Claire Weisz, FAIA, founding principal of WXY.
 
According to the project team, consultants will help train staff, and provide software for tracking all waste types and measuring progress towards zero-waste operations. This is a radically new idea for an affordable community, according to a news release.
 
Owner and/or developer: Hudson Companies, Gilbane Development Co., and MHANY Management Inc. (part of the Mutual Housing Association of New York).
Design architect: WXY architecture + urban design and Body Lawson Associates Architects and Planners
Architect of record: WXY architecture + urban design and Body Lawson Associates Architects and Planners
MEP engineer: Skyline Engineering
Structural engineer: Gedeon GRC Consulting and Christie Engineering
General contractor/construction manager: Broadway Builders and Gilbane
 

Related Stories

Building Tech | Jun 26, 2019

Modular construction can deliver projects 50% faster

Modular construction can deliver projects 20% to 50% faster than traditional methods and drastically reshape how buildings are delivered, according to a new report from McKinsey & Co.

Design Innovation Report | Jun 25, 2019

2019 Design Innovation Report: Super labs, dream cabins, office boardwalks, façades as art

9 projects that push the limits of architectural design, space planning, and material innovation.

Multifamily Housing | Jun 25, 2019

Historic New York hospital becomes multifamily development

CetraRuddy designed the project and Delshah Capital is the developer.

Multifamily Housing | Jun 25, 2019

New Joint Center housing report foresees steady rental demand over the next decade

However, supply shortages, especially on the affordable end, are likely to push rents even higher.

Multifamily Housing | Jun 3, 2019

11 trends in senior living

Style, flexibility, and fun highlight the latest design trends for the 55+ market.

Multifamily Housing | May 29, 2019

Grilled to order: The art of outdoor kitchens

Seven tips for ensuring outdoor kitchens deliver safe, memorable experiences for residents and guests.

Multifamily Housing | May 17, 2019

At last, downtown Dallas tower to get $450 million redo

The landmark tower has been vacant for a decade.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021