flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

MIT develops ‘river of 3D pixels’ to assemble objects

BIM and Information Technology

MIT develops ‘river of 3D pixels’ to assemble objects

The Kinetic Blocks can manipulate objects into shapes without human interference.


By Adilla Menayang, Asistant Digital Editor | October 29, 2015
MIT develops ‘river of 3-D pixels’ to assemble objects

The Kinetic Block by MIT's Tangible Media Group

Researchers at MIT are finding ways to make objects and buildings construct themselves, such as this rock-and-string structure MIT collaborated with ETH Zurich on display at the Chicago Biennial.

Another addition to the self-building portfolio is Kinetic Blocks. Developed by MIT’s Tangible Media Group, the shapeshifting display of computer-controlled pins can manipulate objects to take form.

According to Fast Company, Kinetic Blocks is a “flatbed ‘shape display’ with a Microsoft Kinect as an overhanging eye.” The device can stock, rotate, twist, and move blocks without any human intervention. “It can even construct preprogrammed structures,” the article says.

Related Stories

| May 18, 2011

New Tool Takes PDFs Beyond 2D

Our IT expert puts a new PDF creation package through its paces and sees value for AEC firms that want to move more aggressively into 3D documents.

| May 16, 2011

Dassault Systèmes to distribute Gehry Technologies’ digital project

Dassault Systèmes and Gehry Technologies announced that Gehry Technologies’ Digital Project products will be integrated into the Dassault Systèmes’ portfolio and distributed through Dassault Systèmes. Digital Project is a suite of 3D BIM applications created by Gehry Technologies using Dassault Systèmes’ CATIA as a core modeling engine.

| May 10, 2011

Trimble acquiring Tekla

| May 3, 2011

Scott Simpson of KlingStubbins on how to get more value from BIM

Too few AEC professionals have developed a strategic idea of how BIM can and should re-shape professional practices and drive dramatic improvements in both creativity and production, according to Scott Simpson, FAIA, senior director of KlingStubbins. While BIM enables the exploration of design ideas quickly and in new and different ways, it can lead people to think they’re making more progress than they actually are. A simple adjustment in perspective is all it takes to put things right.

| May 2, 2011

URS acquires Apptis Holdings, a federal IT service provider

SAN FRANCISCO, CA and CHANTILLY, VA– April 28, 2011 – URS Corporation  and Apptis Holdings, Inc., a leading provider of information technology and communications services to the federal government, announced that they have signed a definitive agreement under which URS will acquire Apptis.

| Apr 12, 2011

BIM Grows Up: Separating Hype from Reality in a 3D World

While BIM adoption still lags in both design and construction, some enterprising owners, architects, and contractors are unlocking the potential of this dynamic technology.

boombox1
boombox2
native1

More In Category



AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021