flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Milwaukee Bucks reveal more renderings of new downtown arena project

Sports and Recreational Facilities

Milwaukee Bucks reveal more renderings of new downtown arena project

The plan, led by Populous, includes a 714,000-sf arena and a 30-acre mixed-use development.


By Mike Chamernik, Associate Editor | March 18, 2016

All renderings courtesy Populous. Click photos to enlarge.

The NBA’s Milwaukee Bucks have many mottos attached to them — like “Green and Growing,” “Bucks in Six,” and “Fear the Deer” — but the team pushes one above all else. 

Own the Future.

They certainly are trying to do that. Along with a young, exuberant group of players, the Bucks continue to move towards a new downtown Milwaukee arena that will keep them in the city.

This week, the Bucks released new renderings and project specifications for their arena and surrounding mixed-use entertainment district, a plan led by Populous along with Eppstein Uhen and HNTB. 

The 714,000-sf arena is intended primarily for basketball but can also host hockey, concerts, and other events. Upper and lower levels will load from the top down for a more efficient seating pattern, and fans will be able to watch the action from the concourses. 

The building will have a hand-crafted zinc and glass exterior. A massive glass curtain wall will bring light and views into the atrium. The arced long-span roof will be clad in pre-patina zinc shingles, with six vertical glass “ripples” that allow light in. 

Perhaps intentionally, the building’s shape seems to honor Milwaukee’s heritage.

The 30-acre mixed-use development will have restaurants, bars and other entertainment based uses, including a plaza with a translucent canopy above it. 

The NBA mandated that the Bucks needed a new arena secured or else they would be sold to the league and potentially relocated. The team’s current home, the BMO Bradley Center, was built in 1988. The new arena project was announced last April and the Wisconsin state assembly approved the plan last July.

The entire plan will cost about $1 billion, half for the arena and half for the development. The arena is expected to be ready for the 2018-19 season, and the district, which will also add hotels, offices, and condos, will be built over the next 10 years.

The Bucks are also building a new training facility.

 

Related Stories

| Oct 8, 2013

Toronto Maple Leafs arena converted to university recreation facility

Using steel reinforcement and massive box trusses, a Building Team methodically inserts four new floors in the landmark arena while preserving and restoring its historic exterior.

| Oct 1, 2013

13 structural steel buildings that dazzle

The Barclays Center arena in Brooklyn and the NASCAR Hall of Fame in Charlotte, N.C., are among projects named 2013 IDEAS2 winners by the American Institute of Steel Construction.

| Sep 26, 2013

6 ways to maximize home-field advantage in sports venue design

Home-field advantage can play a significant role in game outcomes. Here are ways AEC firms can help create the conditions that draw big crowds, energize the home team to perform better, and disrupt visiting players.

| Sep 24, 2013

8 grand green roofs (and walls)

A dramatic interior green wall at Drexel University and a massive, 4.4-acre vegetated roof at the Kauffman Performing Arts Center in Kansas City are among the projects honored in the 2013 Green Roof and Wall Awards of Excellence. 

| Sep 19, 2013

What we can learn from the world’s greenest buildings

Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.

| Sep 19, 2013

6 emerging energy-management glazing technologies

Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level. 

| Sep 19, 2013

Roof renovation tips: Making the choice between overlayment and tear-off

When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.

| Sep 17, 2013

Healthcare project will merge outpatient clinic with YMCA to promote wellness and prevention

Penrose-St. Francis Health Services and the YMCA of the Pikes Peak Region announce collaboration, along with developer The Boldt Company, to create next-generation wellness facility.  

| Sep 16, 2013

Study analyzes effectiveness of reflective ceilings

Engineers at Brinjac quantify the illuminance and energy consumption levels achieved by increasing the ceiling’s light reflectance.

| Sep 11, 2013

BUILDINGChicago eShow Daily – Day 3 coverage

Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021