flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Milwaukee Bucks reveal more renderings of new downtown arena project

Sports and Recreational Facilities

Milwaukee Bucks reveal more renderings of new downtown arena project

The plan, led by Populous, includes a 714,000-sf arena and a 30-acre mixed-use development.


By Mike Chamernik, Associate Editor | March 18, 2016

All renderings courtesy Populous. Click photos to enlarge.

The NBA’s Milwaukee Bucks have many mottos attached to them — like “Green and Growing,” “Bucks in Six,” and “Fear the Deer” — but the team pushes one above all else. 

Own the Future.

They certainly are trying to do that. Along with a young, exuberant group of players, the Bucks continue to move towards a new downtown Milwaukee arena that will keep them in the city.

This week, the Bucks released new renderings and project specifications for their arena and surrounding mixed-use entertainment district, a plan led by Populous along with Eppstein Uhen and HNTB. 

The 714,000-sf arena is intended primarily for basketball but can also host hockey, concerts, and other events. Upper and lower levels will load from the top down for a more efficient seating pattern, and fans will be able to watch the action from the concourses. 

The building will have a hand-crafted zinc and glass exterior. A massive glass curtain wall will bring light and views into the atrium. The arced long-span roof will be clad in pre-patina zinc shingles, with six vertical glass “ripples” that allow light in. 

Perhaps intentionally, the building’s shape seems to honor Milwaukee’s heritage.

The 30-acre mixed-use development will have restaurants, bars and other entertainment based uses, including a plaza with a translucent canopy above it. 

The NBA mandated that the Bucks needed a new arena secured or else they would be sold to the league and potentially relocated. The team’s current home, the BMO Bradley Center, was built in 1988. The new arena project was announced last April and the Wisconsin state assembly approved the plan last July.

The entire plan will cost about $1 billion, half for the arena and half for the development. The arena is expected to be ready for the 2018-19 season, and the district, which will also add hotels, offices, and condos, will be built over the next 10 years.

The Bucks are also building a new training facility.

 

Related Stories

| Oct 12, 2014

AIA 2030 commitment: Five years on, are we any closer to net-zero?

This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030. 

| Sep 24, 2014

Architecture billings see continued strength, led by institutional sector

On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.

| Sep 22, 2014

4 keys to effective post-occupancy evaluations

Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.

| Sep 22, 2014

Sound selections: 12 great choices for ceilings and acoustical walls

From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products. 

| Sep 17, 2014

Atlanta Braves break ground on mixed-use ballpark development

SunTrust Park will be constructed by American Builders 2017, a joint venture between Brasfield & Gorrie, Mortenson Construction, Barton Malow Company, and New South Construction.

| Sep 9, 2014

Using Facebook to transform workplace design

As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.

| Sep 3, 2014

New designation launched to streamline LEED review process

The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.

| Sep 2, 2014

Ranked: Top green building sector AEC firms [2014 Giants 300 Report]

AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms. 

| Aug 29, 2014

The new College Football Hall of Fame opens in Atlanta

Adjacent to the Georgia World Congress Center and Centennial Olympic Park, the three-story, 94,250-sf attraction is designed to celebrate the traditions of college football. 

| Aug 27, 2014

Ranked: Top sports facility sector AEC firms [2014 Giants 300 Report]

Populous, AECOM, and Turner head BD+C's rankings of the nation's largest sports facility design and construction firms, as reported in the 2014 Giants 300 Report.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021