flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Milwaukee Bucks reveal more renderings of new downtown arena project

Sports and Recreational Facilities

Milwaukee Bucks reveal more renderings of new downtown arena project

The plan, led by Populous, includes a 714,000-sf arena and a 30-acre mixed-use development.


By Mike Chamernik, Associate Editor | March 18, 2016

All renderings courtesy Populous. Click photos to enlarge.

The NBA’s Milwaukee Bucks have many mottos attached to them — like “Green and Growing,” “Bucks in Six,” and “Fear the Deer” — but the team pushes one above all else. 

Own the Future.

They certainly are trying to do that. Along with a young, exuberant group of players, the Bucks continue to move towards a new downtown Milwaukee arena that will keep them in the city.

This week, the Bucks released new renderings and project specifications for their arena and surrounding mixed-use entertainment district, a plan led by Populous along with Eppstein Uhen and HNTB. 

The 714,000-sf arena is intended primarily for basketball but can also host hockey, concerts, and other events. Upper and lower levels will load from the top down for a more efficient seating pattern, and fans will be able to watch the action from the concourses. 

The building will have a hand-crafted zinc and glass exterior. A massive glass curtain wall will bring light and views into the atrium. The arced long-span roof will be clad in pre-patina zinc shingles, with six vertical glass “ripples” that allow light in. 

Perhaps intentionally, the building’s shape seems to honor Milwaukee’s heritage.

The 30-acre mixed-use development will have restaurants, bars and other entertainment based uses, including a plaza with a translucent canopy above it. 

The NBA mandated that the Bucks needed a new arena secured or else they would be sold to the league and potentially relocated. The team’s current home, the BMO Bradley Center, was built in 1988. The new arena project was announced last April and the Wisconsin state assembly approved the plan last July.

The entire plan will cost about $1 billion, half for the arena and half for the development. The arena is expected to be ready for the 2018-19 season, and the district, which will also add hotels, offices, and condos, will be built over the next 10 years.

The Bucks are also building a new training facility.

 

Related Stories

Sports and Recreational Facilities | Jun 9, 2016

Swimming may be returning to Melbourne’s polluted Yarra River… kind of

The addition of a pool to the Yarra may help improve people’s perception of the river and act as the impetus to an increase in support for improving its water quality.

Building Team Awards | May 23, 2016

'Greenest ballpark' proves a winner for St. Paul Saints

Solar arrays, a public art courtyard, and a picnic-friendly “park within a park" make the 7,210-seat CHS Field the first ballpark to meet Minnesota sustainable building standards.

Sports and Recreational Facilities | May 20, 2016

Texas Rangers announce plans for $1 billion retractable roof ballpark

The new stadium will replace Globe Life Park, which is only 22 years old.  

Sports and Recreational Facilities | May 19, 2016

Audacy brings wireless lighting controls to Wrigley Field’s new clubhouse

The Audacy system uses a combination of motion sensors, luminaire controllers, light sensors, and switches that are all connected and coordinated by Gateways.

Sports and Recreational Facilities | May 6, 2016

NBA’s Atlanta Hawks to build new practice center with attached medical facilities

The team will have easy access to an MRI machine, 3D motion capture equipment, and in-ground hydrotherapy. 

BIM and Information Technology | May 2, 2016

How HDR used computational design tools to create Omaha's UNO Baxter Arena

Three years after writing a white paper about designing an arena for the University of Nebraska Omaha, HDR's Matt Goldsberry says it's time to cherry-pick the best problem-solving workflows.

Mixed-Use | May 1, 2016

A man-made lagoon with a Bellagio-like fountain will be the highlight of a mixed-use project outside Dallas

Construction will soon begin on housing, retail, and office spaces.

Sports and Recreational Facilities | Apr 17, 2016

An expanded and renovated complex brings together U. of Colorado’s sports programs

This two-year project enhances the experiences of athletes and fans alike.

Sports and Recreational Facilities | Apr 13, 2016

Cubs take a measured approach when planning HD video boards

Along with the mammoth and super-sharp video boards, Wrigley Field's 1060 Project includes renovated bleachers, upgraded player amenities, and more concourses, decks, and concessions.

Sports and Recreational Facilities | Apr 13, 2016

More than a game: 4 ways sports teams are adapting to changing fan preferences

As the cost of tickets, parking, and concessions skyrockets, while home theater technology becomes more affordable, fans wonder: Why even bother going to the game? Here’s how progressive sports owners and Building Teams are packing stadium seats.

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021