Williams Design|Build and Williams Construction Management of St. Charles, Ill., announced it has acquired Vasilion Architects of Batavia, Ill. The two firms will now serve as a single source for architecture, design/build, and construction management under the new name Prairie Forge Group. Prairie Forge Group will be led by Thomas M. Tristano as president, David V. Stermetz as vice president and director of construction, and Steven J. Vasilion as director of architecture.
“We have aligned four decades of experience with the expertise of new, innovative team members to further enhance the service offerings we provide to our clients,” said Tristano. “The acquisition of Vasilion Architects was a natural step in our evolution. As we build upon our past resources and success, we remain focused on the core values upon which we established our firm decades ago – quality, people, and service.”
Prairie Forge Group is headquartered in St. Charles, with an office in Kansas City, Mo. The firm provides owners and clients throughout the Midwest region with innovative, timely and economical turnkey solutions. Areas of practice include municipal, parks and recreation, healthcare, commercial, multifamily, historic preservation, and religious and education sectors.
“Regardless of complexity, Prairie Forge Group works to serve as the project advocate from beginning to end,” said Stermetz. “While each project is addressed individually and solutions are tailored to job specifics, one thing remains consistent across the board: we serve our clients efficiently and effectively.”
Prairie Forge Group's completed projects include the Lake Forest Municipal Services Facility in Lake Forest, Ill.; St. Charles Fire Station No. 1; the Schwiebert Riverfront Park in Rock Island, Ill.; and the Bob & Edna Meadows Regional Cancer Care Center at St. Joseph Provena Hospital in Elgin, Ill. The firm has also completed projects for many park districts, recreation departments and municipalities throughout the state of Illinois.
“I am eager to join forces with Tom Tristano and his team,” said Vasilion. “Their vast knowledge and construction expertise is a tremendous resource. I believe in design|build and am thrilled to join forces on this new adventure.” +
Related Stories
| Dec 17, 2010
Luxury condos built for privacy
A new luxury condominium tower in Los Angeles, The Carlyle has 24 floors with 78 units. Each of the four units on each floor has a private elevator foyer. The top three floors house six 5,000-sf penthouses that offer residents both indoor and outdoor living space. KMD Architects designed the 310,000-sf structure, and Elad Properties was project developer.
| Dec 17, 2010
Subway entrance designed to exude Hollywood charm
The Hollywood/Vine Metro portal and public plaza in Los Angeles provides an entrance to the Red Line subway and the W Hollywood Hotel. Local architect Rios Clementi Hale Studio designed the portal and plaza to flow with the landmark theaters and plazas that surround it.
| Dec 17, 2010
New engineering building goes for net-zero energy
A new $90 million, 250,000-sf classroom and laboratory facility with a 450-seat auditorium for the College of Electrical and Computer Engineering at the University of Illinois at Urbana/Champaign is aiming for LEED Platinum.
| Dec 17, 2010
Vietnam business center will combine office and residential space
The 300,000-sm VietinBank Business Center in Hanoi, Vietnam, designed by Foster + Partners, will have two commercial towers: the first, a 68-story, 362-meter office tower for the international headquarters of VietinBank; the second, a five-star hotel, spa, and serviced apartments. A seven-story podium with conference facilities, retail space, restaurants, and rooftop garden will connect the two towers. Eco-friendly features include using recycled heat from the center’s power plant to provide hot water, and installing water features and plants to improve indoor air quality. Turner Construction Co. is the general contractor.
| Dec 17, 2010
Toronto church converted for condos and shopping
Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.
| Dec 17, 2010
ARRA-funded Navy hospital aims for LEED Gold
The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.
| Dec 17, 2010
Arizona outpatient cancer center to light a ‘lantern of hope’
Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.
| Dec 17, 2010
Cladding Do’s and Don’ts
A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.
| Dec 17, 2010
5 Tips on Building with SIPs
Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.
| Dec 17, 2010
How to Win More University Projects
University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.