flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Micro-apartment concept can’t get traction in Boston suburb

Micro-apartment concept can’t get traction in Boston suburb

Some big cities warm to tiny living spaces, but suburbia may not be so receptive.


By BD+C Staff | September 2, 2014
Rendering: courtesy Panoramic Interests
Rendering: courtesy Panoramic Interests

Micro-apartments are gaining acceptance in nearby Boston and in places such as San Francisco and New York, but Weymouth, Mass., officials and neighbors were not receptive to a proposal for tiny dwellings this summer.

“This is Weymouth, not Boston,” said the owner of a hair salon near the proposed apartment project. She opposed the Weymouth micro-unit plan, as did the East Weymouth Neighborhood Association and two town councilors.

Most neighbors viewed the proposal as a rooming house because of the planned 19 units of about 300 sf, and were worried about added traffic in an already congested area.

“Generally the comments from the public were not positive,” Weymouth town planner Abby McCabe told the Boston Globe. The town’s Board of Zoning Appeals was concerned that the overall project was too large for the site, but took no position on the micro-unit aspect of it, McCabe said.

The developer has decided to scrap the concept for 15 more conventionally sized, but still small, units—most ranging from 430 sf to 460 sf. This is an indication that tiny apartments might find an inhospitable reception outside of the large urban hubs that have embraced them as affordable options for young professionals.

(http://www.bostonglobe.com/metro/regionals/south/2014/08/13/proposal-for-micro-apartments-gets-cold-shoulder-weymouth/sXDfZvkyYmNPG4TY8ynNeO/story.html)

Related Stories

Codes and Standards | Aug 11, 2021

Decentralized approach to codes means emissions reduction responsibility falls on local officials

Efficiency advocates focusing more on local code amendments.

Digital Twin | Aug 9, 2021

Digital Twin Maturity white paper offers guidance on digital twin adoption

Provides lifecycle map and an approach for incorporating digital twins.

Codes and Standards | Aug 5, 2021

Contractors can be liable for building failures many years after project completion

Personal injury suits could be brought decades after substantial completion.

Codes and Standards | Aug 4, 2021

Mass timber is a natural choice for building recycling through deconstruction

Designing wood buildings to optimize recovery of materials for disassembly aids carbon sequestration.

Codes and Standards | Aug 3, 2021

Dept. of Energy releases initial version of the Spawn of EnergyPlus software

Targets new use cases in advanced controls, district systems, and grid integration.

Codes and Standards | Aug 2, 2021

Several U.S. cities among most expensive places to build in the world

San Francisco, New York, and Boston head the domestic list.

Codes and Standards | Jul 28, 2021

American Concrete Institute creates new director of innovative concrete technology post

Aim is to attract emerging technologies for development.

Codes and Standards | Jul 28, 2021

Higher ed faces infrastructure backlog of $112.3 billion

Study recommends integrated strategic planning for best results.

Codes and Standards | Jul 27, 2021

Add a wobbly moon to flooding risk factors

Earth satellite’s orbit variations will lead to sunny-day flooding in the mid-2030s.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021