flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Michigan YMCA receives Universal Design Certification

Sports and Recreational Facilities

Michigan YMCA receives Universal Design Certification

The 116,200-sf Mary Free Bed YMCA in Grand Rapids is accessable for everyone who uses the facilities.


By BD+C Staff | December 7, 2015
Michigan YMCA receives Universal Design Certification

Photos courtesy Mary Free Bed YMCA

The Mary Free Bed YMCA in Grand Rapids, Mich., received Universal Design Certification last week, becoming the first facility in the world to earn that certification from the Global Universal Design Commission. A ribbon-cutting ceremony was held at the facility last week.

Universal design is the concept to create buildings that are accessible to everyone who uses them: the elderly and people with and without disabilities.

The 116,200-sf Mary Free Bed YMCA is located on a 36-acre campus with two pools, two group fitness centers, and two and a half gyms. It also has an indoor track, climbing wall, wheelchair softball field, and baseball and soccer fields.

Outside of athletics, the facility has a greenhouse, teaching kitchen, and learning farm. The Carol Van Andel Healthy Living Center will hold programs that teach nutrition and physical activity.

The project cost $31 million. The YMCA was designed by Progressive AE, an architecture firm based in Grand Rapids.

 

Related Stories

| Sep 16, 2013

Study analyzes effectiveness of reflective ceilings

Engineers at Brinjac quantify the illuminance and energy consumption levels achieved by increasing the ceiling’s light reflectance.

| Sep 11, 2013

BUILDINGChicago eShow Daily – Day 3 coverage

Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.

| Sep 11, 2013

Sports stadium accidents suggest code updates may be necessary to prevent falls

Since 2000, at least three individuals have died as a result of falling from the upper decks of stadiums in the United States. In addition, eight non-fatal falls have occurred in stadiums and arenas over that time.

| Sep 10, 2013

BUILDINGChicago eShow Daily – Day 2 coverage

The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.

| Aug 29, 2013

First look: K-State's Bill Snyder Family Stadium expansion

The West Side Stadium Expansion Project at Kansas State's Bill Snyder Family Stadium is the largest project in K-State Athletics history. 

| Aug 26, 2013

What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets

BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets. 

| Aug 26, 2013

Chicago Bears kick off season at renovated Halas Hall

An upgraded locker room, expanded weight room, and updated dining room with an outdoor patio greeted the Chicago Bears when they arrived at Halas Hall for practice this month. The improvements are part of a major expansion and renovation of the Bears’ headquarters in Lake Forest, Ill., completed by Mortenson Construction in less than seven months.

| Aug 22, 2013

Sports Facility Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest sports facility design and construction firms, as reported in the 2013 Giants 300 Report.

| Aug 22, 2013

Energy-efficient glazing technology [AIA Course]

This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.

| Aug 20, 2013

First look: $550 million Billie Jean King National Tennis Center renovation

The United States Tennis Association has announced its plans for a sweeping transformation of the USTABillie Jean King National Tennis Center that will include the construction of two new stadiums, as well as a retractable roof over Arthur Ashe Stadium.  The transformation will be implemented in three phases to begin at the conclusion of the 2013 US Open, with the goal of overall completion by the 2018 US Open.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021