flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Michael Green Architecture joins Katerra

Architects

Michael Green Architecture joins Katerra

Michael green architecture is a globally recognized leader in mass timber architecture.


By Katerra | June 5, 2018

Katerra and Michael Green Architecture Inc. (MGA) recently announced a partnership today that underscores an evolution in the design and construction industries. The two companies share the same vision for the future in which quality and efficiency align with reducing costs and affordability, from initial design, through the life of the building. This new partnership will bring together technology, manufacturing, and design excellence to offer more sustainable, cost effective, and elegant architecture options to North American and global markets.

The MGA leadership team will remain unchanged and continue to provide their clients with thoughtful and sustainable solutions of all scales and typologies. With the support of Katerra’s technology expertise and production capability, MGA’s impact will grow through an increased project scope that will offer clientele a broader range of cost and construction options.

“Katerra is thrilled to welcome MGA,” said Michael Marks, chairman and co-founder of Katerra. “Michael Green and his team have built a reputation for engaging design and leadership in the use of mass timber. This goes a long way to support our mission to utilize cutting-edge technology and systems to revolutionize the construction industry.”

“MGA is excited to become a part of the Katerra ecosystem,” said Michael Green, CEO and President of MGA. “MGA and Katerra both aim to provide elegant, sustainable, high-performance, affordable buildings. Katerra’s goal to accomplish this on a large scale aligns with MGA’s long-term ambition. MGA is determined to create a meaningful and lasting legacy for our clients, the planet, and the social well-being of the people living on it."

Tags

Related Stories

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021