Katerra and Michael Green Architecture Inc. (MGA) recently announced a partnership today that underscores an evolution in the design and construction industries. The two companies share the same vision for the future in which quality and efficiency align with reducing costs and affordability, from initial design, through the life of the building. This new partnership will bring together technology, manufacturing, and design excellence to offer more sustainable, cost effective, and elegant architecture options to North American and global markets.
The MGA leadership team will remain unchanged and continue to provide their clients with thoughtful and sustainable solutions of all scales and typologies. With the support of Katerra’s technology expertise and production capability, MGA’s impact will grow through an increased project scope that will offer clientele a broader range of cost and construction options.
“Katerra is thrilled to welcome MGA,” said Michael Marks, chairman and co-founder of Katerra. “Michael Green and his team have built a reputation for engaging design and leadership in the use of mass timber. This goes a long way to support our mission to utilize cutting-edge technology and systems to revolutionize the construction industry.”
“MGA is excited to become a part of the Katerra ecosystem,” said Michael Green, CEO and President of MGA. “MGA and Katerra both aim to provide elegant, sustainable, high-performance, affordable buildings. Katerra’s goal to accomplish this on a large scale aligns with MGA’s long-term ambition. MGA is determined to create a meaningful and lasting legacy for our clients, the planet, and the social well-being of the people living on it."
Related Stories
| Dec 20, 2011
Third annual Gingerbread Build-off winners announced
Nine awards were handed out acknowledging the most unique and creative gingerbread structures completed.
| Dec 20, 2011
BCA’s Best Practices in New Construction available online
This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.
| Dec 20, 2011
Aragon Construction leading build-out of foursquare office
The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.
| Dec 20, 2011
HOAR Construction opens Austin, Texas office
Major projects in central Texas spur firm’s growth.
| Dec 19, 2011
HGA renovates Rowing Center at Cornell University
Renovation provides state-of-the-art waterfront facility.
| Dec 19, 2011
Chicago’s Aqua Tower wins international design award
Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.
| Dec 19, 2011
Summit Design+Build selected as GC for Chicago recon project
The 130,000 square foot building is being completely renovated.
| Dec 19, 2011
USGBC welcomes new board directors?
Board responsible for articulating and upholding the vision, values, mission of organization.
| Dec 19, 2011
Davis Construction breaks ground on new NIAID property
The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each.
| Dec 19, 2011
Survey: Job growth driving demand for office and industrial real estate in Southern California
Annual USC Lusk Center for Real Estate forecast reveals signs of slow market recovery.