flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Miami’s yacht-inspired UNA Residences begins construction

Multifamily Housing

Miami’s yacht-inspired UNA Residences begins construction

AS+GG designed the tower.


By David Malone, Associate Editor | October 15, 2020
Una Residences tower

Images courtesy OKO Group/Cain International

Designed by AS+GG, the 47-story Una Residences takes its design cues from Riva yachts. Now under construction in Miami’s Brickell neighborhood, the tower will be the first waterfront residential tower in over a decade.

Una Residences will comprise 135 condominiums with unobstructed views of the Atlantic Ocean, Biscayne Bay, and the Miami city skyline. Residences range from two to five bedrooms and measure between 1,100 and 4,786 sf. The building includes spacious layouts, large terraces, and private elevators for all units.

 

Una Residences bedroom

 

“Una’s subtly undulating surface and strong silhouette stands proud at the water’s edge. We drew inspiration from the elegant shape and opulent materials used in classic yacht design – particularly the beautifully lacquered wood, exposed materials, and stainless-steel connections found on the Italian-made yacht, the Riva,” said Adrian Smith FAIA, Design Partner, AS+GG, in a release. “Carefully crafted and detailed and meticulously designed, it is elegant and relaxing. Its primary goal is to relate well and add to the beauty of Miami and the wonderful lifestyle this City is so well known for.” 

 

Una Residences lounge

 

Amenities include three swimming pools, a children’s splash-pad area and playroom, a movie theater, an Atman Resort-inspired spa and steam room, a fitness center with yoga and personal training facilities, and onsite dining. Residents will also receive membership access to the Grand Bay Club on the beachfront of Miami’s Key Biscayne.

AS+GG will design both the exterior and interior of the tower. OKO Group is the project’s developer. Una Residences is slated for completion in early 2023.

Related Stories

Coronavirus | May 26, 2020

Multifamily developers report mounting delays in permitting and starts due to coronavirus pandemic

More than half (53%) of multifamily developer respondents reported construction delays in the jurisdictions where they operate, according to the third edition of the National Multifamily Housing Council (NMHC) COVID-19 Construction Survey.

Multifamily Housing | May 8, 2020

Nashville's newest residential tower will rise 416 feet

Goettsch Partners is designing the project.  

Multifamily Housing | May 8, 2020

'Lakehouse' is the first multifamily project in Colorado to receive WELL Precertification

Stantec and Muñoz + Albin are the project's architects.  

Senior Living Design | May 5, 2020

5 memory care communities with a strong sense of mission

Communities in California, Colorado, Florida, Maryland, and Virginia display excellence in memory care facility development, design, and construction.

Multifamily Housing | Apr 23, 2020

Tankless water heaters: 12 things to know about these energy savers for multifamily housing

Twelve factors to consider in using tankless water heaters in multifamily housing.

Multifamily Housing | Apr 20, 2020

Multifamily market flattens as construction proposal activity sinks

Multifamily has consistently been one of the strongest performers among 58 submarkets measured in PSMJ Resources’ quarterly survey.

Coronavirus | Apr 15, 2020

COVID-19 alert: 93% of renters in professionally managed multifamily housing paid some or all of their rent, says NMHC

In its second survey of 11.5 million units of professionally managed apartment units across the country, the National Multifamily Housing Council (NMHC) found that 84% of apartment households made a full or partial rent payment by April 12, up 15 percentage points from April 5.

Multifamily Housing | Apr 15, 2020

Related Group picks Stantec to design and engineer Manor Miramar residences in Florida

Related Group picks Stantec to design and engineer Manor Miramar residences in Florida.

Coronavirus | Apr 5, 2020

COVID-19: Most multifamily contractors experiencing delays in projects due to coronavirus pandemic

The NMHC Construction Survey is intended to gauge the magnitude of the disruption caused by the COVID-19 outbreak on multifamily construction.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021