Groundbreaking recently took place for a new event center at The Concours Club, Miami’s members-only motorsport facility. “The facility blends high-performance driving, impeccable service and luxury amenities within a spectacular resort setting,” according to Coastal Construction Group, the project’s general contractor.
Designed by renowned Italian design firm Pininfarina and with Revuelta as architect, The Event Campus at The Concours Club will be the first and only motorsport-based event campus located within minutes of a major metro area.
Featuring multiple unique elements to support many types of events, the campus will be bifurcated from The Concours Club’s exclusive member-only areas with a separate entrance, paddock, and pit lane. It will consist of a member’s lounge, reception area, multi-use room, staging room, back-of-house offices, lockers and storage room, along with an expansive event room, pre-function area, terrace, prep-kitchen, conference room, staff lockers and restrooms.
The event center facility will provide immersive experiences and branding opportunities for any corporation or individual. Completion is slated for 2024.
Located within the Miami-Opa Locka Executive Airport, the Concours Club provides a driving course of more than two miles with multiple configurations and elevations. It includes a 2,100-foot straightaway and a 46-foot-wide driving surface. The club offers a fleet of circuit-ready BMWs, which includes the latest M2CS Racing models, for members and guests.
The club offers advanced technology including digitally marshaled flagging, virtual coaching, and a review system that allows telemetry overlaying and lap time comparison, making it one of the most technologically advanced driving circuits in the world. The Club currently offers multiple options for private events, corporate team-building, vehicle unveilings, product showcases, testing and performances of all kinds. The new event center will allow the facility to accommodate even more events of different sizes.
On the building team:
Owner and/or developer: Trilogy Real Estate Group
Design architect: Pininfarina
Architect of record: Revuelta Architecture International
MEP engineer: JGP Engineering Group
Structural engineer: DeSimone Consulting Engineers
General contractor/construction manager: Coastal Construction Group
Related Stories
| Sep 11, 2013
Sports stadium accidents suggest code updates may be necessary to prevent falls
Since 2000, at least three individuals have died as a result of falling from the upper decks of stadiums in the United States. In addition, eight non-fatal falls have occurred in stadiums and arenas over that time.
| Sep 10, 2013
BUILDINGChicago eShow Daily – Day 2 coverage
The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.
| Aug 29, 2013
First look: K-State's Bill Snyder Family Stadium expansion
The West Side Stadium Expansion Project at Kansas State's Bill Snyder Family Stadium is the largest project in K-State Athletics history.
| Aug 26, 2013
What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets
BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets.
| Aug 26, 2013
Chicago Bears kick off season at renovated Halas Hall
An upgraded locker room, expanded weight room, and updated dining room with an outdoor patio greeted the Chicago Bears when they arrived at Halas Hall for practice this month. The improvements are part of a major expansion and renovation of the Bears’ headquarters in Lake Forest, Ill., completed by Mortenson Construction in less than seven months.
| Aug 22, 2013
Sports Facility Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest sports facility design and construction firms, as reported in the 2013 Giants 300 Report.
| Aug 22, 2013
Energy-efficient glazing technology [AIA Course]
This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.
| Aug 20, 2013
First look: $550 million Billie Jean King National Tennis Center renovation
The United States Tennis Association has announced its plans for a sweeping transformation of the USTABillie Jean King National Tennis Center that will include the construction of two new stadiums, as well as a retractable roof over Arthur Ashe Stadium. The transformation will be implemented in three phases to begin at the conclusion of the 2013 US Open, with the goal of overall completion by the 2018 US Open.
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Aug 13, 2013
USGBC joins forces with Green Sports Alliance to promote sustainable venues
The U.S. Green Building Council (USGBC) has announced a collaboration with the Green Sports Alliance, a prominent nonprofit organization supporting the development and promotion of green building initiatives in professional and collegiate sports.