flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Miami’s AmericanAirlines Arena debuts a multipurpose event space

Sports and Recreational Facilities

Miami’s AmericanAirlines Arena debuts a multipurpose event space

601 offers variety and flexibility not found in the arena’s other food and entertainment locations.


By John Caulfield, Senior Editor | February 27, 2017

601, an 11,500-sf multipurpose space within American Airlines Arena in Miami, is big enough to host three or four parties and events at once. Image: Courtesy The Heat Group

American Airlines Arena, home to the Miami Heat basketball franchise, officially got into the restaurant and event business on Jan. 25, when it held a private party to debut 601, an 11,500-sf multipurpose space that offers fans and patrons a la carte dining, tapas, specialty drinks, and a variety of craft beers.

601 (the number of the arena’s address, 601 Biscayne Boulevard) fills a space that had been vacant since June 2014, when Gloria and Emilio Estaban closed Bongos Cuban Café. The couple had leased that space for 15 years.

The Heat Group, which manages the arena, took a couple of years to decide what it wanted to do with this space, says Michael McCullough, its Executive Vice President and Chief Marketing Officer. The Heat Group considered leasing the space to a franchise, but chose instead to turn it into an event space—“not unlike a hotel ballroom,” says McCullough—that can host weddings, office parties, bar mitzvahs, and other gatherings.

A sprawling 5,000-sf private dining space on the lower level can handle large corporate and social events.

In converting this space to 601, The Heat Group worked with DLR Group, the same architectural firm it used last year to retrofit the arena’s 23,000-sf East Plaza into a solar pavilion. “They are very forward thinking,” says McCullough about the firm. Brodson Construction, based in South Florida, was the contractor of record.

American Airlines Arena already had several food and entertainment venues, including the upscale restaurant/lounge Dewar’s VIP Lounge, and a number of franchises included Pincho factory and Pubbelly’s.

But 601 is different, says McCullouch, because of its flexibility and menu. It can offer a quick-service menu, a chef’s table, or whatever dining a client might want from its state of the art kitchens. “The main thing that we tried to do here was bring the landscape of Miami, reflect it in the offerings,” Rufino Rengifo, 601’s executive chef, told News 7 Miami.

 

 

A 5,000-sf “ballroom-like” area within 601 can handle different sized groups, and offer casual or fine dining. Image: Courtesy The Heat Group

 

The upstairs area includes a self-serve craft beer wall, for which customers can buy a card and draw their own drafts. The space also has a Tumbler bar with a range of mixed drinks and wine, and phone-charging stations at every table. And it's right on Biscayne Bay.

601 is open to all ticketholders 90 minutes before and up to two hours after every Heat game, as well as select Arena events like concerts.

Now that it’s been open a month, McCullough says no booking patterns have emerged. But 601 doesn’t seem to be cutting into the business of the Arena’s other dining spaces, or its skyboxes. (The Heat ranks among the NBA’s leaders in attendance.) McCullough notes, though, that when the Heat is playing, 601 seems to be drawing smaller groups.

Related Stories

| May 16, 2012

AEG releases 3D video of L.A.'s Farmers Field

The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.

| May 7, 2012

2012 BUILDING TEAM AWARDS: TD Ameritrade Park

The new stadium for the College World Series in Omaha combines big-league amenities within a traditional minor league atmosphere.

| Apr 6, 2012

Perkins Eastman unveils Qatar mixed-use sports complex

Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 1, 2012

Bomel completes design-build parking complex at U.C. San Diego

The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level. 

| Feb 24, 2012

Skanska hires Tingle as senior VP and national director for its Sports Center of Excellence

Tingle has worked in the architecture and construction industries for more than 30 years, and for the last 23 years, he has focused primarily on large-scale sports construction projects

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Jan 31, 2012

Fusion Facilities: 8 reasons to consolidate multiple functions under one roof

‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series  on the design and construction of university facilities.

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021