American Airlines Arena, home to the Miami Heat basketball franchise, officially got into the restaurant and event business on Jan. 25, when it held a private party to debut 601, an 11,500-sf multipurpose space that offers fans and patrons a la carte dining, tapas, specialty drinks, and a variety of craft beers.
601 (the number of the arena’s address, 601 Biscayne Boulevard) fills a space that had been vacant since June 2014, when Gloria and Emilio Estaban closed Bongos Cuban Café. The couple had leased that space for 15 years.
The Heat Group, which manages the arena, took a couple of years to decide what it wanted to do with this space, says Michael McCullough, its Executive Vice President and Chief Marketing Officer. The Heat Group considered leasing the space to a franchise, but chose instead to turn it into an event space—“not unlike a hotel ballroom,” says McCullough—that can host weddings, office parties, bar mitzvahs, and other gatherings.
A sprawling 5,000-sf private dining space on the lower level can handle large corporate and social events.
In converting this space to 601, The Heat Group worked with DLR Group, the same architectural firm it used last year to retrofit the arena’s 23,000-sf East Plaza into a solar pavilion. “They are very forward thinking,” says McCullough about the firm. Brodson Construction, based in South Florida, was the contractor of record.
American Airlines Arena already had several food and entertainment venues, including the upscale restaurant/lounge Dewar’s VIP Lounge, and a number of franchises included Pincho factory and Pubbelly’s.
But 601 is different, says McCullouch, because of its flexibility and menu. It can offer a quick-service menu, a chef’s table, or whatever dining a client might want from its state of the art kitchens. “The main thing that we tried to do here was bring the landscape of Miami, reflect it in the offerings,” Rufino Rengifo, 601’s executive chef, told News 7 Miami.
A 5,000-sf “ballroom-like” area within 601 can handle different sized groups, and offer casual or fine dining. Image: Courtesy The Heat Group
The upstairs area includes a self-serve craft beer wall, for which customers can buy a card and draw their own drafts. The space also has a Tumbler bar with a range of mixed drinks and wine, and phone-charging stations at every table. And it's right on Biscayne Bay.
601 is open to all ticketholders 90 minutes before and up to two hours after every Heat game, as well as select Arena events like concerts.
Now that it’s been open a month, McCullough says no booking patterns have emerged. But 601 doesn’t seem to be cutting into the business of the Arena’s other dining spaces, or its skyboxes. (The Heat ranks among the NBA’s leaders in attendance.) McCullough notes, though, that when the Heat is playing, 601 seems to be drawing smaller groups.
Related Stories
| Sep 11, 2013
Sports stadium accidents suggest code updates may be necessary to prevent falls
Since 2000, at least three individuals have died as a result of falling from the upper decks of stadiums in the United States. In addition, eight non-fatal falls have occurred in stadiums and arenas over that time.
| Sep 10, 2013
BUILDINGChicago eShow Daily – Day 2 coverage
The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.
| Aug 29, 2013
First look: K-State's Bill Snyder Family Stadium expansion
The West Side Stadium Expansion Project at Kansas State's Bill Snyder Family Stadium is the largest project in K-State Athletics history.
| Aug 26, 2013
What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets
BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets.
| Aug 26, 2013
Chicago Bears kick off season at renovated Halas Hall
An upgraded locker room, expanded weight room, and updated dining room with an outdoor patio greeted the Chicago Bears when they arrived at Halas Hall for practice this month. The improvements are part of a major expansion and renovation of the Bears’ headquarters in Lake Forest, Ill., completed by Mortenson Construction in less than seven months.
| Aug 22, 2013
Sports Facility Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest sports facility design and construction firms, as reported in the 2013 Giants 300 Report.
| Aug 22, 2013
Energy-efficient glazing technology [AIA Course]
This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.
| Aug 20, 2013
First look: $550 million Billie Jean King National Tennis Center renovation
The United States Tennis Association has announced its plans for a sweeping transformation of the USTABillie Jean King National Tennis Center that will include the construction of two new stadiums, as well as a retractable roof over Arthur Ashe Stadium. The transformation will be implemented in three phases to begin at the conclusion of the 2013 US Open, with the goal of overall completion by the 2018 US Open.
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Aug 13, 2013
USGBC joins forces with Green Sports Alliance to promote sustainable venues
The U.S. Green Building Council (USGBC) has announced a collaboration with the Green Sports Alliance, a prominent nonprofit organization supporting the development and promotion of green building initiatives in professional and collegiate sports.