flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Miami review board recommends approval for Arquitectonica’s top-heavy condo tower

Multifamily Housing

Miami review board recommends approval for Arquitectonica’s top-heavy condo tower

The 57-story Elysee Miami will offer residents impeccable views and plenty of amenities.


By Mike Chamernik, Associate Editor | February 10, 2016
Miami review board recommends approval for luxury condo tower

Courtesy David Siddons Group.

A 57-story luxury condo tower in Miami is one step closer to being built.

This week, Miami Today reported that the city's Urban Development Review Board recommended the approval of Elysee Miami, which will hug the waterfront in the Edgewater neighborhood. 

Architect Bernardo Fort-Brescia, of the Miami firm Arquitectonica, designed its three-tier shape that gets wider as it gets taller. It will have only two units per floor (100 condos total) with 3-, 4-, and 5-bedroom layouts. Floor-to-ceiling glass windows and sliding balcony doors will provide unobstructed views of the city and the ocean. Condo prices start at $1.67 million.

The building has plenty of perks, with services including valet parking, white glove concierge service, and even robotic parking. It has two full floors of amenities: The seventh floor will have a 75-foot pool, a yoga studio, fitness center, and guest suites, and the 30th floor has a 30-guest dining room, chef’s kitchen, business center, and resident wine storage. 

Unlike many newer projects, the Elysee Miami will not have retail or restaurant space at its ground level.

Two Roads Development is the developer of the Elysee Miami, and Jean-Louis Deniot is the interior designer. It is expected to be completed in 2018.

Related Stories

Multifamily Housing | Jul 25, 2018

Multifamily market trends 2018: Demographic shifts reshape the residential landscape

Changing generational preferences are prompting multifamily developers to re-strategize.

Multifamily Housing | Jul 19, 2018

Multifamily market stays hot in first half of 2018

The average rent grew by $12 in June, to an all-time high of $1,405, according to a survey of 127 markets by Yardi Matrix.

Multifamily Housing | Jul 18, 2018

First apartment building funded by Massachusetts’ workforce housing subsidy program opens

The transit-oriented Gateway North Residences is centrally located in Lynn, Mass.

Codes and Standards | Jul 17, 2018

NIMBYism, generational divide threaten plan for net-zero village in St. Paul, Minn.

The ambitious redevelopment proposal for a former Ford automotive plant creates tension.

Codes and Standards | Jul 17, 2018

In many markets, green features are more of a requirement for apartment renters

Renters in many U.S. cities have come to expect green features in apartments that they rent, with an eye toward energy efficiency and healthy indoor air.

Multifamily Housing | Jul 13, 2018

Student housing vs. multifamily housing—what are the differences?

While student and multi-family housing share a common building form, it’s the student resident that drives the innovation of new spaces.

Multifamily Housing | Jul 11, 2018

Meet the ‘CoHaus’: N.Y. developer unveils large-scale flats concept for boomers, Gen Xers

With its new CoHaus development, Ward Capital Management is betting on baby boomers downsizing and Gen Xers upsizing. 

Multifamily Housing | Jun 27, 2018

To take on climate change, go passive

If you haven’t looked seriously at “passive house” design and construction, you should.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021