flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Call for submissions: ‘Affordable Housing Projects' Cover Story

Multifamily Housing

Call for submissions: ‘Affordable Housing Projects' Cover Story

Your affordable housing community could be on the cover of MULTIFAMILY Design+Construction.


By ROBERT CASSIDY, EDITOR, MULTIFAMILY DESIGN+CONSTRUCTION | July 27, 2021
Aria, Los Angeles, developed by Affirmed Housing
Aria, Los Angeles, developed by Affirmed Housing

MULTIFAMILY Design+Construction is looking for the best new "affordable housing" communities for the Fall Issue.

Your project could be on the COVER!

We're looking for outstanding "affordable housing" communities for our Fall Issue (October/November).

NOTE: Projects do NOT have to be 100% affordable – but must be at least 20% affordable "set-aside."

Here’s what we need (by Tuesday, August 17):

1. PROJECT DESCRIPTION —project name, location, # of units, type of units (studio, 1BR, 2BR, etc.), construction cost (or total cost), Developer or Owner firm, key AEC firms involved (architect, MEP engineer, structure/civil engineer, landscape architect, builder/contractor, important specialty subcontractors – e.g., sustainability consultant,  ).

Note: Projects must have been completed in the last 12-24 months (please give Occupancy Date or Construction Completion Date). Please do not submit projects that are still under construction.

IMPORTANT: There is NO CHARGE for participation!

2. HIGH-QUALITY HIGH-RESOLUTION PHOTOS, with brief CAPTIONS (25-50 words). OK to have people in photos – preferably real people, not actors. Casual, candid, not posed.

3. PHOTO CREDITS for all images (no renderings!)

4. WHAT MAKES THE PROJECT SPECIAL? Tell why MFDC readers would be interested in it: special design aspects, interesting financing mechanism, client target group, community involvement, unusual obstacles to overcome, etc.

5. BRIEF DESCRIPTION OF THE FINANCING that made the project affordable: tax credits, grants, foundation support, HUD, state/local affordability requirements, etc. Very important.

6. SUBMITTER'S CONTACT INFO – including mobile phone (in case we have a question).

7. DEADLINE Please submit all materials by Tuesday, August 17, 2021 (contact Rob Cassidy if that’s a problem).

Send all materials to: Rob Cassidy, Editor, MFDC: rcassidy@sgcmail.com; 773-220-3555. Thanks!

Related Stories

Market Data | Dec 29, 2020

Multifamily transactions drop sharply in 2020, according to special report from Yardi Matrix

Sales completions at end of Q3 were down over 41 percent from the same period a year ago.

Multifamily Housing | Dec 16, 2020

What the Biden Administration means for multifamily construction

What can the multifamily real estate sector expect from Biden and Company? At the risk of having egg, if not a whole omelet, on my face, let me take a shot.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

Multifamily Housing | Dec 4, 2020

The Weekly show: Designing multifamily housing for COVID-19, and trends in historic preservation and adaptive reuse

This week on The Weekly show, BD+C editors spoke with leaders from Page & Turnbull and Grimm + Parker Architects about designing multifamily housing for COVID-19, and trends in historic preservation and adaptive reuse

Giants 400 | Dec 2, 2020

2020 Multifamily Sector Giants: Top architecture, engineering, and construction firms in the U.S. multifamily building sector

Clark Group, Humphreys & Partners Architects, and Kimley-Horn head BD+C's rankings of the nation's largest multifamily building sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Smart Buildings | Nov 20, 2020

The Weekly show: SPIRE smart building rating system, and pickleball court design tips

The November 19 episode of BD+C's The Weekly is available for viewing on demand.

AEC Tech | Nov 12, 2020

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.

Multifamily Housing | Nov 11, 2020

San Jose affordable housing project will feature a mass timber frame

SERA Architects and Lendlease will design and build the project.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021