flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mexican Museum tower caught in turmoil to break ground this summer in San Francisco

High-rise Construction

Mexican Museum tower caught in turmoil to break ground this summer in San Francisco

Millennium Partners said it will break ground on the 53-story residential and museum tower while the lawsuits go through the appeals process.


By BD+C Staff | March 16, 2015
Mexican Museum tower caught in turmoil to break ground this summer

Millennium Partners said it will break ground on the Mexican Museum this summer. Renderings courtesy Handel Architects

After several lawsuits and appeals to stop the 53-story Mexican Museum tower (also known as 706 Mission) from being built, the project will finally break ground this summer in San Francisco, according to Curbed San Francisco.

Designed by Handel Architects for developer Millennium Partners, the tower will house 190 luxury condo units, with the Mexican Museum in levels one through four. According to CurbedSF, the condos will be spacious by San Francisco standards: three- and four-bedroom units averaging 2,700 sf.

The museum will occupy the lower levels of both the new tower and the 1903 Aronson building next door, which is being restored as part of the project. The 10-story Aronson building will house space for the museum on levels two through four, with 16 residential units on floors above.

The project's biggest opponents are residents of the Four Seasons tower, a 430-foot-tall building in the Yerba Buena district. Their reasoning for arguing against the structure: they want the museum tower to be shorter.

Millennium Partners said it will break ground on 706 Mission while the lawsuits go through appeals after being thrown out by the courts. It's scheduled to be completed in September 2018, with sales beginning in 2017.

 

Related Stories

| Feb 21, 2013

Holl videos discuss design features of Chengdu ' Porosity Block' project

Architect Steven Holl has released two short films describing the development of Sliced Porosity Block in Chengdu, China.

| Feb 21, 2013

Construction team chosen for world's tallest building in Jeddah, Saudi Arabia

Construction team chosen for world's tallest building in Jeddah, Saudi Arabia.

| Feb 17, 2013

Pakistan to get world's tallest tower in $45 billion deal

Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.

| Feb 13, 2013

'Vegetative tower' apartments to revive NYC site

A Manhattan site formerly slated for development with a "tower of cubes"—a now-defunct project by Santiago Calatrava—will be revived with a 998-foot, 300,000-sf apartment building by Morali Architects.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jul 2, 2012

San Francisco lays claim to the greenest building in North America

The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.

| Jun 13, 2012

Thornton Tomasetti founding principals receive CTBUH Fazlur R. Khan Lifetime Achievement Medal

This is the first time the CTBUH Board of Trustees has awarded the prize to two individuals jointly.

| Jun 6, 2012

KPF designs tower for Yongsan IBD

The master plan, created by Studio Daniel Libeskind, is a dynamic urban environment containing contributions from 19 different architects practicing in diverse locations around the globe.

| Jun 6, 2012

SOM urges Chicago tenants to partner with landlords to cut energy use

Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021