flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mexican Museum tower caught in turmoil to break ground this summer in San Francisco

High-rise Construction

Mexican Museum tower caught in turmoil to break ground this summer in San Francisco

Millennium Partners said it will break ground on the 53-story residential and museum tower while the lawsuits go through the appeals process.


By BD+C Staff | March 16, 2015
Mexican Museum tower caught in turmoil to break ground this summer

Millennium Partners said it will break ground on the Mexican Museum this summer. Renderings courtesy Handel Architects

After several lawsuits and appeals to stop the 53-story Mexican Museum tower (also known as 706 Mission) from being built, the project will finally break ground this summer in San Francisco, according to Curbed San Francisco.

Designed by Handel Architects for developer Millennium Partners, the tower will house 190 luxury condo units, with the Mexican Museum in levels one through four. According to CurbedSF, the condos will be spacious by San Francisco standards: three- and four-bedroom units averaging 2,700 sf.

The museum will occupy the lower levels of both the new tower and the 1903 Aronson building next door, which is being restored as part of the project. The 10-story Aronson building will house space for the museum on levels two through four, with 16 residential units on floors above.

The project's biggest opponents are residents of the Four Seasons tower, a 430-foot-tall building in the Yerba Buena district. Their reasoning for arguing against the structure: they want the museum tower to be shorter.

Millennium Partners said it will break ground on 706 Mission while the lawsuits go through appeals after being thrown out by the courts. It's scheduled to be completed in September 2018, with sales beginning in 2017.

 

Related Stories

High-rise Construction | Jun 15, 2015

Cornell Tech breaks ground on world's first Passive House residential high-rise

To achieve Passive House standards, Cornell Tech Residential will incorporate a number of sustainability-focused design elements. The façade, constructed of a prefabricated metal panel system, acts as a thermally insulated blanket wrapping the building structure. 

High-rise Construction | Jun 15, 2015

‘Stacked box’ skyscraper proposed for Vancouver

The scheme by German architect Ole Scheeren involves 48 stories with multiple volumes of rectangles protruding out of several floors toward different directions of the city.

Office Buildings | Jun 9, 2015

Bjarke Ingels unveils stepped design for final WTC tower

The towering "staircase" will rise from St. Paul’s chapel to the skyline, leaning against One World Trade Center.

Office Buildings | Jun 9, 2015

Hines planning $300 million office tower for Denver skyline

Designed by Pickard Chilton, the 640,000-sf tower is geared for large-scale tenants, with features like floor-to-ceiling glass, a 5,000-sf fitness center, a tenant lounge, and a series of outdoor terraces. 

High-rise Construction | Jun 5, 2015

Japanese policymakers discuss mandate for toilets in elevators

This quirky-sounding building code is a safety measure for the earthquake-prone nation.

Wood | Jun 2, 2015

Michael Green Architecture designs world's tallest wood building for Paris competition

“Just as Gustave Eiffel shattered our conception of what was possible a century and a half ago, this project can push the envelope of wood innovation with France in the forefront," said architect Michael Green of the project.  

High-rise Construction | May 6, 2015

Two new designs submitted for New York City Riverside Center

Both designs reference the cantilevers and other elements featured in architect Christian de Portzamparc’s original masterplan for the complex, which has now been scrapped.

High-rise Construction | May 6, 2015

Parks in the sky? Subterranean bike paths? Meet the livable city, designed in 3D

Today’s great cities must be resilient—and open—to many things, including the influx of humanity, writes Gensler co-CEO Andy Cohen. 

Building Owners | May 6, 2015

Hackathons and RFCs: Why one developer killed the RFP

In lieu of an RFP process, Skanska Commercial Development hosted a three-week "hackathon" to find an architect for its 2&U tower in Seattle.

High-rise Construction | Apr 30, 2015

World Trade Center developer looks to Bjarke Ingels for new tower design

Norman Foster’s design for 2 World Trade Center may be ousted, as developers are currently negotiating with Danish firm BIG to redesign the original scheme.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021