flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Metros are seeking far bigger convention center spaces

Events Facilities

Metros are seeking far bigger convention center spaces

Some projects are doubling the capacities of existing buildings.


By John Caulfield, Senior Editor | May 2, 2024
Aerial view of new convention center in Ontario, Calif.
The expansion of the Ontario (Calif.) convention center will deliver 450,000 sf of indoor space. Rendering: HMC Architects

As people and businesses have become less anxious about traveling and crowds, major convention center construction, renovation, and expansion proposals and projects are in full swing across North America.

Also see: the 2023 Convention Center Giants ranking here, here, and here

The March 2024 edition of Trade Show Executive magazine reported on 14 convention centers with an aggregate 1,058,125 sf of exhibit space under construction, and another 25 proposed developments.

Austin, Cincinnati, St. Louis, Denver, Fort Lauderdale, New Orleans, Dallas, San Antonio, Indianapolis, Savannah, Los Angeles, and Mobile are among the metros where convention center construction or renovation is in various stages of approval or development. In Milwaukee, the 673,000-sf, $456 million expansion of the Baird Center, designed by EUA and TVSdesign, is scheduled to be completed this month. Northstar Meetings Group reports that the new construction will bring Baird Center’s totals to 300,275 sf of exhibit space; 73,566 sf of breakout space; 52 meeting rooms, 24 of them new; two ballrooms: the existing 37,506-sf space and a new 32,000-sf rooftop ballroom that will have an 18,223-sf wraparound rooftop terrace with views of the district. The center’s final footprint will be 1.3 million sf.

Baird Center will host the Republican National Convention in mid July. Gilbane and C.D. Smith Construction managed the building of this expansion project.

The Baird Center expansion in Milwaukee will increase the convention center's total footprint to 1.3 million sf. Image credit: AP/Wisconsin Center District

Part of a downtown redevelopment

The city of Ontario, Calif., recently selected HMC Architects to lead the design team for the Ontario Convention Center Expansion Campus that will double the size and event capacity of the current building (which HMC designed nearly 30 years ago). The challenge is integrating a forward-looking addition while respecting the existing, 1990s-era architecture.

The project, which is scheduled for completion in 2027, will deliver 450,000 sf of indoor space, a 2,000-vehicle parking structure, onsite retail, and a pedestrian bridge over an adjacent boulevard. The new construction will also expand the convention center’s outdoor and event opportunities, according to HMC. Tilden-Coil Constructors is the general contractor hired for this project, and Greater Ontario California (GOCal) operates the facility.

The addition’s aviation-themed design links this project to Ontario’s international airport. And the construction will be phased to allow for the continuous operation of most of the existing convention center during the expansion.

The city of Ontario, which owns the convention center, has stated that the expansion is part of a broader plan to reactivate its downtown. That plan includes the construction of a City Services Building, and a new fire station.

The challenge of expanding the Ontario convention center will be integrating forward-looking and 1990s-era designs. Rendering: HMC Architects 

A curved canopy marks Calgary convention center expansion

 

The striking curved canopy of the expanded BMO Centre in Cagary extends 170 ft into the facility's outdoor fair area. Renderings for BMO Centre: Calgary Municipal Land Corporation

On June 5, BMO Centre at Stampede Park within Calgary, Alberta’s, Culture + Entertainment District will debut its 585,000-sf, 500-million-Canadian-dollar expansion that was spearheaded by the community builder Calgary Municipal Land Corporation and The Calgary Stampede, a festival space famous for its annual 10-day rodeo. They worked on the BMO Centre expansion with the architectural design firms Populous, Stantec, and S2 Architecture.

The expansion increases BMO Centre’s total floor space to more than 1 million sf, and doubles the facility’s rentable area, making it the largest convention center in Western Canada. The design envisioned a minimal number of columns on the main level and fully columnless ballrooms on the top level. The expanded facility boasts three ballrooms totaling 70,000 sf, 38 meeting rooms, and more than 100,000 sf of new exhibition space. The facility’s ballrooms can now host 33,000 guests at one time.

BMO Centre's second-floor lobby features Canada's largest fireplace.

The expansion’s design is distinguished by a curved exterior canopy that spans 170 feet and touches down at the Spirit of Water, a 40,000-sf gathering place on the expanded building’s south side. The public art there was designed by UK-based artist Gerry Judah. A second-floor lobby for additional gathering space includes Canada’s largest fireplace and an 11,000-sf covered outdoor patio.

PCL Construction was the contractor on this three-story expansion. RJC Engineers and Magnusson Klemencic Associates provided structural engineering services in collaboration with the steel subcontractor Walters Group.

Related Stories

| Feb 11, 2011

Kentucky’s first green adaptive reuse project earns Platinum

(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.

| Jan 21, 2011

Music festival’s new home showcases scenic setting

Epstein Joslin Architects, Cambridge, Mass., designed the Shalin Liu Performance Center in Rockport, Mass., to showcase the Rockport Chamber Music Festival, as well at the site’s ocean views.

| Jan 20, 2011

Houston Dynamo soccer team plans new venue

Construction is scheduled to begin this month on a new 22,000-seat Major League Soccer stadium for the Houston Dynamo. The $60 million project is expected to be ready for the 2012 MLS season.

| Jan 20, 2011

Construction begins on second St. Louis community center

O’Fallon Park Recreation Complex in St. Louis, designed by local architecture/engineering firm KAI Design & Build, will feature an indoor aquatic park with interactive water play features, a lazy river, water slides, laps lanes, and an outdoor spray and multiuse pool.

| Dec 17, 2010

Sam Houston State arts programs expand into new performance center

Theater, music, and dance programs at Sam Houston State University have a new venue in the 101,945-sf, $38.5 million James and Nancy Gaertner Performing Arts Center. WHR Architects, Houston, designed the new center to connect two existing buildings at the Huntsville, Texas, campus.

| Nov 2, 2010

Cypress Siding Helps Nature Center Look its Part

The Trinity River Audubon Center, which sits within a 6,000-acre forest just outside Dallas, utilizes sustainable materials that help the $12.5 million nature center fit its wooded setting and put it on a path to earning LEED Gold.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

| Oct 13, 2010

Apartment complex will offer affordable green housing

Urban Housing Communities, KTGY Group, and the City of Big Bear Lake (Calif.) Improvement Agency are collaborating on The Crossings at Big Bear Lake, the first apartment complex in the city to offer residents affordable, eco-friendly homes. KTGY designed 28 two-bedroom, two-story townhomes and 14 three-bedroom, single-story flats, averaging 1,100 sf each.

| Oct 13, 2010

Community center under way in NYC seeks LEED Platinum

A curving, 550-foot-long glass arcade dubbed the “Wall of Light” is the standout architectural and sustainable feature of the Battery Park City Community Center, a 60,000-sf complex located in a two-tower residential Lower Manhattan complex. Hanrahan Meyers Architects designed the glass arcade to act as a passive energy system, bringing natural light into all interior spaces.

| Oct 13, 2010

Bookworms in Silver Spring getting new library

The residents of Silver Spring, Md., will soon have a new 112,000-sf library. The project is aiming for LEED Silver certification.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.


Education Facilities

Studio Gang designs agricultural education center for the New York City Housing Authority

Earlier this month, the City of New York broke ground on the new $18.2 million Marlboro Agricultural Education Center (MAEC) at the New York City Housing Authority’s Marlboro Houses in Brooklyn. In line with the mission of its nonprofit operator, The Campaign Against Hunger, MAEC aims to strengthen food autonomy and security in underserved neighborhoods. MAEC will provide Marlboro Houses with diverse, community-oriented programs.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021