flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Method of estimating amount of CO2 by building occupants may be inaccurate

Codes and Standards

Method of estimating amount of CO2 by building occupants may be inaccurate

New research suggests current estimates may be off by as much as 25%.


By Peter Fabris, Contributing Editor | May 9, 2017

Pixabay Public Domain

A method to estimate the amount of CO2 generated by building occupants since the early 1980s may be off by as much as 25%.

Researchers at the National Institute of Standards and Technology (NIST) and George Mason University say the old formula relies on old data and a method lacking scientific documentation. To help address the problem, the researchers developed a new computation method that uses well-established concepts from the study of human metabolism and exercise physiology.

The new method relates CO2 generation rates to body size and composition, diet, and level of physical activity. Researchers say this results in more accurate estimates of the CO2 generated by individuals, and by extension, an improved estimate of the concentration produced by a building’s entire occupant population.

Measurements of indoor carbon dioxide (CO2) concentrations are used to evaluate indoor air quality. CO2 metrics are strongly linked to the levels of contaminants, such as gases and particles, circulating in the air. This information can be used to control ventilation, which helps clean the air, and can reduce the need for heating and cooling.

Related Stories

Market Data | Apr 8, 2019

Engineering, construction spending to rise 3% in 2019: FMI outlook

Top-performing segments forecast in 2019 include transportation, public safety, and education.

Codes and Standards | Apr 5, 2019

Manhattan expected to adopt congestion pricing plan for automobiles

New York would be first U.S. city to charge drivers extra for downtown motoring.

Codes and Standards | Apr 4, 2019

Chicago makes major building code overhaul

Previous comprehensive changes were done 70 years ago.

Codes and Standards | Apr 3, 2019

Construction advanced materials makers can enhance industry efficiency with technology

Integration of new IT approaches in construction with new materials has potential to enhance sustainability, alleviate worker shortage.

Codes and Standards | Apr 2, 2019

Open offices reduce collaboration among employees

Counterintuitive finding makes value of wide open workspaces questionable.

Codes and Standards | Mar 29, 2019

New timber traceability LEED credit released

Pilot credit aims to reduce use of illegal wood in buildings.

Codes and Standards | Mar 28, 2019

Swinerton forms new mass timber business group

Will pursue new projects being developed with mass timber.

Codes and Standards | Mar 27, 2019

Shortage of skilled construction workers resulting in missed deadlines

Some 40% of contractors have turned down project offers.

Codes and Standards | Mar 25, 2019

ICC release 2019 guidelines for safe use of repurposed shipping containers

Provides in-depth, technical overview on how to design, review, and approve shipping containers as building elements.

Codes and Standards | Mar 22, 2019

Tool helps cities develop framework for life-cycle energy policies and track progress

Identifies policies, funding sources to address building energy use.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021