Single-skin metal panels, metal composite panels, and insulated metal panels can add both aesthetic and functional value to your projects, if you use them correctly.


By By Peter Fabris, Contributing Editor | April 12, 2011
This article first appeared in the April 2011 issue of BD+C.

In all climate zones, the various forms of metal cladding—single-skin panels, metal composite materials (MCM) panels, and insulated metal panels (IMPs)—are proving to be reliable, durable elements on more and more office buildings, hospitals, multifamily housing, industrial structures, and other commercial and institutional projects. Single-skin metal panels and metal composite panels, whether in the form of aluminum, steel, zinc, or copper, enable designers to create clean, smooth, crisp lines on exterior walls that can lend a sleek, contemporary look to any structure. Similarly, IMP products offer multiple metals, finishes, and profiles with an extensive color palette, providing designers a wide variety of aesthetic options as well as enhanced thermal performance.

Building Design+Construction spoke with building enclosure specialists and technical experts at manufacturing companies to get their insights into how Building Teams can best use metal cladding panel systems. In recent years, building enclosure experts have gained more confidence in the ability of metal cladding products to stand up to the elements and protect the building envelope. Like any cladding material, however, each type of metal panel system comes with specific attributes, requirements, and limitations that Building Teams must be aware of.

The potential difficult areas include:

• Preventing moisture penetration

• Ensuring that joints are designed correctly

• Addressing hurricane resistance codes along coastal areas

• Paying special attention to how metal cladding interfaces with windows, doors, and other cladding material

But first, let’s get down to the fundamentals.

THE BASICS OF METAL CLADDING

Metal cladding comes in many different dimensions and thicknesses, and can be custom fabricated for individual projects:

• Single-skin metal panels are available in both concealed fastener and exposed fastener varieties.

• Metal composite materials panels consist of two sheets—most often aluminum or steel—bonded to a polyethylene core. These panels are fabricated into panels using perimeter extrusions to create attachment and joinery systems.

• Insulated metal panels consist of a layer of rigid foam core insulation sandwiched between two pieces of sheet metal. These metal panels are manufactured either as a foamed-in-place system or laminated with board stock foam and can be up to six inches in thickness. Insulation values for IMP panels are available from R-10 to R-45, and in some cases as much as R-48.

Typically, most architectural applications for commercial and institutional buildings are applied to metal stud framing or structural tube supports, depending on the manufacturer’s recommendation. Concealed fastener and insulated metal panels typically attach to each other via a tongue-in-groove joint. For industrial applications, such as warehouses or industrial plants, metal panels are fastened to steel Z girts and include thermal breaks.

BARRIER WALLS AND RAINSCREEN WALLS

There are two basic types of fabricated metal panel systems: barrier walls and rainscreen walls. Barrier walls attempt to keep all rainwater from penetrating the outer face of the exterior walls. All panel joints are sealed by butyl, gaskets, or silicone sealant, applied either within the joints or to the face of the joint. The joinery seals expand and contract as needed to accommodate temperature variations and building movement. These seals, along with the factory-built panels that include air and moisture barriers, provide a high-performance exterior envelope with a low air infiltration rate; in some cases the air exchange per hour is as low as 0.043, depending on the building and climate zone. This allows IMPs to meet the “continuous insulation,” or “ci,” requirements of ASHRAE 90.1.

In contrast to a barrier wall, an effective rainscreen system allows some water to penetrate through the panel joinery. Inside the wall cavity, a weather barrier provides a drainage plane for the water to drain out of the cavity. A variation of this design is the pressure-equalized rainscreen system, which provides air vents for each panel to equalize pressure between the outside and inside of the systems. This design aims to prevent water droplets from being driven through the panel joints because wind pressure acting on the outer face of the panel is equalized in the cavity.

When properly installed, there should be no significant pressure differential to drive rain through joints. During extreme weather, a small amount of water may penetrate the outer cladding; it should run down the back of the cladding sheets as droplets and be dissipated through evaporation and drainage.

EXTRA: 8 Helpful Tips from Metal Cladding Manufacturers

Joinery systems between panels must be properly designed to accommodate thermal expansion and differential movements between panels. Narrower joints can have more difficult tolerances to meet in the field because smaller variations in the placement of panel joints may be more noticeable to the eye than the same amount of variation in a wider joint, according to Rob Kistler, AIA, a principal with The Facade Group LLC, Portland, Ore. That’s because an eighth-inch variation in a quarter-inch joint looks bigger in proportion to an eighth-inch variation in a half-inch joint.

If an open-joint rainscreen system is improperly designed or installed, it might let in more rain than it is designed to accommodate. “The wind-driven rain could go right through and strike the weather barrier,” Kistler says. “You want to make sure that you block the horizontal rain. If there’s any kind of a hole in the membrane, with water shedding down it, the water is going to find the hole.” That could result in water infiltration into the building.

A key part of a successful open-joint rainscreen panel design is the drainage plane behind the cladding, says Linda McGowan, PE, AIA, president and principal with Building Consultants & Engineers, Littleton, Colo. “You have to make sure that the moisture that gets behind the cladding is able to drain—that it has a reasonable means of getting out from behind the metal panel system,” she says. The width of the air gap between the cladding and the structural frame is a key factor for proper drainage, providing adequate pressure equalization, and enabling the weather barrier to dry after exposure to moisture.

“There is always going to be something that is going to interrupt the drainage plane,” McGowan adds. “You need to understand that and provide reasonable accommodation.” Areas of particular concern: behind heads of windows, heads of doors, and the points where the panels are attached to the structure. Water that encounters those points needs to have a drainage pathway.

The bottom line is that with proper design and a qualified, experienced installer, the chances of significant water intrusion occurring in an open-joint rainscreen system can be greatly reduced.

HOW TO IMPROVE WATER TIGHTNESS

Water tightness is a relative standard depending on the application. On a single-story industrial building, for example, some water intrusion may be acceptable. If a small amount of water penetrates the cladding and ends up on the edges of a concrete shop floor where it can quickly dry, it may be an acceptable outcome.

In regions of the country where the possibility of water intrusion is a major concern, designers should create a mockup of a section of cladding and test it for water penetration, says building enclosure consultant Richard Keleher, AIA, CSI, LEED AP, of Concord, Mass. The American Architectural Manufacturing Association 508-07 test for pressure-equalized rainscreen systems includes a cyclic check for rapid pressure equalization, a static water test, and a dynamic water test that employs an aircraft engine to blow water at a section of panel constructed to emulate the finished product. The AAMA 508-07 test allows water (usually mist) to contact up to 5% of the air/water barrier, with no damming or streaming, to earn a pass rating. To get accurate results, you have to ensure that the mockup test is designed to the 508 test specifications, making sure the corners of the test section are airtight and watertight, Keleher adds.

EXTRA: Checklist of Best Practices for Metal Panel Projects

Another test manufacturers can use for rainscreens is AAMA 509-09, which provides ratings for water intrusion (W) and ventilation (V), according to Rick Brow, marketing director for Centria Architectural Systems, Moon Township, Pa. “The desired effect is to have minimal water and high ventilation to dry the cavity,” says Brow, author of the manual Advanced Thermal and Moisture Protection. A rating of W1 (equivalent to one ounce or less of water penetration in 15 minutes) and V4 (6-8 cfm/sf in 15 minutes) would be “a highly effective result.” The W1 rating is basically the same as the rating achieved with AAMA 508, says Brow.

For barrier walls, the appropriate weather tightness tests are ASTM E 331 (water infiltration), ASTM E 283 (air leakage), and AAMA 501.1 (dynamic water pressure), according to Doug Pickens, VP of sales and marketing, Metl-Span, Lewisville, Texas.

WATCH YOUR WINDOWS TO AVOID PROBLEMS WITH THERMAL BRIDGING

All building cladding systems have some degree of thermal bridging. Thermal bridging can occur at fastener locations, joints, and intersections with other materials. Reducing the number of fasteners, joints, and penetrations, combined with careful detailing, can minimize the effects of thermal bridging in metal panel wall assemblies. Providing insulation outside the support framing system is also recommended to help minimize thermal bridging.

The concept of a continuous thermal barrier was originally recommended in the 2001 Massachusetts Energy Code. This more stringent continuous insulation, or “ci,” code requirement is likely to become more common in other states, given the trend toward more energy-efficient structures.

Thermal gain and loss from fenestration systems should be of much greater concern to Building Teams than thermal bridging. In the case of structures with many windows, it is important to invest in high-efficiency windows as well as the appropriate metal cladding material in order to make the building envelope as energy efficient as possible.

The metal panel industry is continuing to study how its products can contribute more to the greening of the built environment. One of metal cladding’s green characteristics is the ability to be recycled after its lifespan expires. The technology has already won over building enclosure specialists, and as building science advances, metal panel systems, insulation, and air and vapor barrier solutions will continue to be improved. Odds are that metal panel systems—with their many advantages—will become an even more popular cladding choice in the years to come.

Related Stories

| Oct 30, 2014

CannonDesign releases guide for specifying flooring in healthcare settings

The new report, "Flooring Applications in Healthcare Settings," compares and contrasts different flooring types in the context of parameters such as health and safety impact, design and operational issues, environmental considerations, economics, and product options.

| Oct 30, 2014

Perkins Eastman and Lee, Burkhart, Liu to merge practices

The merger will significantly build upon the established practices—particularly healthcare—of both firms and diversify their combined expertise, particularly on the West Coast. 

| Oct 29, 2014

Better guidance for appraising green buildings is steadily emerging

The Appraisal Foundation is striving to improve appraisers’ understanding of green valuation.

| Oct 29, 2014

Increasing number of design projects meeting carbon reduction targets, says AIA report

Of the 2,464 projects accounted for in AIA's 2030 Commitment 2013 Progress Report, 401 are meeting the 60% carbon reduction target—a 200% increase from 2012.  

Sponsored | | Oct 29, 2014

What’s the difference between your building’s coating chalking and fading?

While the reasons for chalk and fade are different, both occurrences are something to watch for. SPONSORED CONTENT

Sponsored | | Oct 29, 2014

Historic Washington elementary school incorporates modular design

More and more architects and designers are leveraging modern modular building techniques for expansion projects planned on historical sites. SPONSORED CONTENT

| Oct 29, 2014

Diller Scofidio + Renfro selected to design Olympic Museum in Colorado Springs

The museum is slated for an early 2018 completion, and will include a hall of fame, theater, retail space, and a 20,000-sf hall that will showcase the history of the Olympics and Paralympics.

Smart Buildings | Oct 29, 2014

SCAPE’s 'living breakwaters' resiliency development wins 2014 Buckminster Fuller Challenge

New York-based landscape architecture firm SCAPE won the Buckminster Fuller Institute’s 2014 Fuller Challenge, billed as socially responsible design’s highest award.

| Oct 28, 2014

4 keys to mastering 'design thinking' and the iteration process

When using design thinking and iteration, we’ll sometimes spend multiple days iterating idea after idea, heads down, only to realize we still don’t have it right, writes HDR's Amy Lussetto. She offers tips for success with these idea-nurturing tools.

| Oct 28, 2014

Miami accepts more modest plan to renovate its convention center

The city of Miami has awarded an $11 million contract for its on-again, off-again convention center renovation to Denver-based Fentress Architects, which will serve as the design criteria professional on this project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021