flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Metal Building Helps Family Business

Sponsored Content Metals

Metal Building Helps Family Business

The two buildings were architecturally distinct projects, both benefiting from Star Building’s compatibility with a wide range of architectural styles


By Star Building Systems | August 7, 2015
Metal Buildings, Buick/GMC dealership

The Buick/GMC building was started first, and took 12 weeks to build.

Sometimes it can be tricky to expand your place of business and stay in business at the same time. It helps to have a little extra land, and to choose a fast, efficient metal building system from Star Buildings.

The Norris car dealership is a family-owned business with a nearly half-century tradition serving the city of Titusville, FL. It’s a city that has bounced back from the brink. The local workforce was deeply involved in NASA’s Space Shuttle program, and the city was hard-hit economically when the program ended in 2011, in addition to suffering from the overall economic recession. But things are getting better, and the Norris family thought it was time to re-invest in Titusville.

“Part of the advantage of a family business is that we’re focused on 30 years down the road. That’s part of the reason I wanted to build these buildings,” explains third-generation owner Josh Norris. “This was a ground-up renovation that we thought was important for the future of our three-generation family business. We’re looking forward to 30 or 40 more years of having a facility to serve our community, and how could you predict that times will ever be better to build than right now? Interest rates are low, the economy is going up, and signs are that it will keep going up. It just makes sense.”

Their dealership is a type that is not uncommon in smaller markets: it’s two dealerships – Honda and Buick/GMC in this case – that were sharing a single lot and a service center. The triangular, 6-acre parcel of land actually included multiple buildings, several smaller concrete block structures, and a large metal building that housed the combined showroom. Seventeen service bays were spread out in different structures. 

Norris decided to build two metal buildings on the grounds, on the advice of general contractor Rush Construction, and the job went to Star Buildings’ builder, Allegiance Contracting, Inc., located in nearby Melbourne, FL. 

Allegiance owner, Jane Lindsey, describes it as a very exciting project for her, because she was directly involved with the architects and the general contractor from the design stage onward.

Lindsey’s involvement was key to getting the project built correctly. “There were issues they were trying to deal with that would be important during construction that I could assist with,” said Lindsey. For example, the large expanse of glass across the front restricted the depth of the steel columns, which put more steel overhead.

The two buildings, with a combined footprint of almost 35,000 sf, were built largely simultaneously. The plan was to build the smaller structure, move Buick/GMC operations into it, and continue to sell Honda out of the old building while the new Honda dealership was under construction. 

Lindsey realized she could gain efficiency by overlapping the construction schedules. “If one job was waiting for something, we could jump over and work on the other building,” she said. The Buick/GMC building was started first, and took 12 weeks to build.  The Honda building began soon afterwards, and took 16 weeks. 

Despite the fact that each building had a different architect, “with Rush Construction, I was under one contract for both buildings,” explains Lindsey. 

She was onsite every day there was activity with the metal building systems.

Being able to alternate work between the two buildings gave Lindsey flexibility to pick up the slack during delays, and to handle the formidable task of coordinating the various construction entities on the job.

“There was a lot of coordination with other trades,” recalls Lindsey. “For example, we had to work closely with the mechanical contractor because of where his curbs would be located, and the bracing for the curbs. The Honda building has 11 different RTU’s (roof top units), and the Buick building has nine. We had a number of meetings on site with him to make sure that when he ran his ductwork, the bracing for the units was exactly where it needed to be.” 

The two buildings were architecturally distinct projects, both benefitting from Star Building’s compatibility with a wide range of architectural styles. Norris was able to upgrade their business for a much more modern look to match their improved operational abilities. The Honda dealership features the Honda Generation III design, and the Buick/GMC dealership sports Buick’s latest design image package.

The rears of the buildings, where the service areas are located, feature PBR panel walls. The roof is a Double-Lock standing seam roofing system.

“One of the reasons I was awarded the project,” states Lindsey, “is that I was able to offer the owner the twenty-year, single source, no dollar limit weather tightness warranty. The roof system, the HVAC curbs, it was all single source; they all came through NCI, parent company of Star Buildings. They warranty the roof system to be weather tight.

“Our old metal building lasted us almost 50 years,” reflects Josh Norris. “But now we have much more modern high ceilings. In the old one, we had a trailer enclosed in the building as our office. The new Buick store has an air-conditioned second floor for IT, records, and office space. Honda has a second floor for parts storage.”

Norris has also noticed the increased energy efficiency of his new dealerships. “I’ve been very impressed with our utility bills, they’ve gone down significantly. We have a 50,000-sf store across town. The new stores’ utility bills typically run about half of the one across town.”

The new dealerships have made a difference to the community as a whole. “There were articles in the local paper about how good the projects were for the community,” recalls Lindsey. “It’s put new life into the city of Titusville.”

 “In Titusville, we’re slow to spend money if you don’t have to. But right now, we are definitely enjoying the benefits of our area. It’s growing. Now was the time to make this change,” concurs Josh Norris about the effect of the project. “The community has definitely shown appreciation for our development downtown. One of the first customers we had was the mayor, who was appreciative of our helping develop the downtown area.”

Ron Norris Honda:
Erector: Pre-Engineered Steel, Inc
Architect: Craig Suman
Structural Engineer: CEG Structural, Tom Adams

Ron Norris Buick-GMC:
Erector: Pre-Engineered Steel, Inc
Architect: Michael A. Penny
Structural Engineer: CEG Structural, Tom Adams

Tags

Related Stories

| Aug 11, 2010

AAMA leads development of BIM standard for fenestration products

The American Architectural Manufacturers Association’s newly formed BIM Task Group met during the AAMA National Fall Conference to discuss the need for an BIM standard for nonresidential fenestration products.

| Aug 11, 2010

9 rooftop photovoltaic installation tips

The popularity of rooftop photovoltaic (PV) panels has exploded during the past decade as Building Teams look to maximize building energy efficiency, implement renewable energy measures, and achieve green building certification for their projects. However, installing rooftop PV systems—rack-mounted, roof-bearing, or fully integrated systems—requires careful consideration to avoid damaging the roof system.

| Aug 11, 2010

Pella introduces BIM models for windows and doors

Pella Corporation now offers three-dimensional (3D) window and door models for use in Building Information Modeling (BIM) projects by architects, designers, and others looking for aesthetically correct, easy-to-use, data-rich 3D drawings.

| Aug 11, 2010

AAMA developing product-based green certification program for fenestration

The American Architectural Manufacturers Association is working on a product-based green certification program for residential and commercial fenestration, the organization announced today. AAMA will use the results of a recent green building survey to help shape the program. Among the survey's findings: 77% of respondents reported a green certification program for fenestration would benefit the product selection process for their company.

| Aug 11, 2010

Seven tips for specifying and designing with insulated metal wall panels

Insulated metal panels, or IMPs, have been a popular exterior wall cladding choice for more than 30 years. These sandwich panels are composed of liquid insulating foam, such as polyurethane, injected between two aluminum or steel metal face panels to form a solid, monolithic unit. The result is a lightweight, highly insulated (R-14 to R-30, depending on the thickness of the panel) exterior clad...

| Aug 11, 2010

AIA Course: Enclosure strategies for better buildings

Sustainability and energy efficiency depend not only on the overall design but also on the building's enclosure system. Whether it's via better air-infiltration control, thermal insulation, and moisture control, or more advanced strategies such as active façades with automated shading and venting or novel enclosure types such as double walls, Building Teams are delivering more efficient, better performing, and healthier building enclosures.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021