flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mesquite, Texas to receive 60-acre ‘wellness village’

Healthcare Facilities

Mesquite, Texas to receive 60-acre ‘wellness village’

Construction is anticipated to begin on the initial phase in mid-2019.


By David Malone, Associate Editor | June 26, 2018
Verde Center at Peachtree

Rendering courtesy of Ryan Companies

The Verde at Peachtree is a new 60-acre master-planned wellness campus in Mesquite, Texas that will serve the health and well-being of the 700,000 people who live within 30 minutes of the development’s planned location.

At full build-out the development will comprise a $250+ million patient centered medical campus. The project is designed to function as a walkable village with a 25+ acre amenity center that follows the banks of a creek. The amenity center will include a series of healing gardens, walking trails, a hotel and conference center, a fitness center, and a senior living community.

 

Rendering courtesy of Ryan Companies.

See Also: French 'Alzheimer’s Village' designed to resemble a medieval bastide

 

The first phase of the project will include the creation of over 15 acres and up to 600,000 sf of medical inpatient, outpatient, and physician office facilities. Currently, final planning is underway to begin site work, mass grading, and infrastructure improvements necessary to tie Peachtree Road with an internal traffic circulation grid.

Verde Center at Peachtree is being developed through a partnership between Ryan Companies US, Inc., Medical Campus Group, Lang and Company, and the Peachtree Foundation, with development financing being supplemented by financial incentives provided by the State of Texas and the City of Mesquite.

Related Stories

| Feb 14, 2013

Peter Bardwell named 2013 president of the American College of Healthcare Architects

The Board of Regents of the American College of Healthcare Architects (ACHA) has named Peter L. Bardwell, FAIA, FACHA of Columbus, Ohio as 2013 national President.

| Feb 6, 2013

George W. Bush Presidential Center among award-winning roofing projects honored by Sika Sarnafil

Winners of the 2012 Contractor Project of the Year Competition were announced this week by Sika Sarnafil. The annual competition highlights excellence in roofing installation. Roofing contractors are judged based on project complexity, design uniqueness, craftsmanship, and creative problem solving.

| Feb 6, 2013

RSMeans cost comparisons: office buildings and medical offices

RSMeans' February 2013 Cost Comparison Report breaks down the average construction costs per square foot for four types of office buildings across 25 metro markets.

| Dec 9, 2012

AEC professionals cautiously optimistic about commercial construction in ’13

Most economists say the U.S. is slowly emerging from the Great Recession, a view that was confirmed to some extent by an exclusive survey of 498 BD+C subscribers whose views we sought on the commercial construction industry’s outlook on business prospects for 2013.

| Nov 11, 2012

Greenbuild 2012 Report: Healthcare

Green medical facilities extend beyond hospital walls

| Oct 24, 2012

Loma Linda University Medical Center lets light in with metal wall systems

Designers for the building aimed to create a positive environment for patients and visitors, and wanted to let in as much natural daylight as possible.

| Oct 11, 2012

Hank Adams Named to Lead HDR’s Healthcare Program

With more than 25 years of experience, HDR vice president is tapped to lead firm's healthcare projects.

| Oct 10, 2012

Skanska to Construct Children’s Hospital of Richmond at Virginia Commonwealth University Pavilion

Skanska USA announced that it has been awarded an $80 million contract to construct a new Children’s Pavilion at Children’s Hospital of Richmond at VCU.

| Oct 2, 2012

Bernards working on project at L.A. White Memorial Medical Center

The new facility is a $15-million, 41,000-sf concrete structure which includes three stories of medical office space atop a three-level parking garage.

| Sep 28, 2012

Seattle is home to first LEED-certified modular radiation center

By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021