flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mergers and acquisitions transform engineering sector [2013 Giants 300 Report]

Mergers and acquisitions transform engineering sector [2013 Giants 300 Report]

Merger and acquisition deals by MEP, commissioning, structural, and specialty engineering firms were up 14% nationwide in 2012 compared with 2011.


By Julie Higginbotham, Senior Editor | July 15, 2013
Planning for extreme weather events is an increasingly important aspect of engineering work. In a large-scale example, structural engineer Walter P Moore collaborated with architect Populous, wind engineer RWDI, and Hunt Construction to create a retractable-roof park for the Miami Marlins. During storms, roof panels can be positioned in a not-quite-closed manner to reduce the sail effect. The 36,000-seat facility meets the Miami-Dade building code, which required wind resistance of up to 146 mph. Photo: Christy Radecic
Merger and acquisition deals by MEP, commissioning, structural, and specialty engineering firms were up 14% nationwide in 2012 compared with 2011, according to consulting firm Morrissey Goodale (morrisseygoodale.com). Since the beginning of 2013, the consultant has reported more than 60 M&A transactions involving North American engineering firms, including interstate, intrastate, and international deals.
 
As economic recovery generates new business, engineering and engineering/architecture firms continue to seek M&A targets that offer an expanded employee base, a geographic springboard, or simply a broader mix of skills. A typical example: the November acquisition of Energy Ace, a Georgia-based commissioning and sustainability specialist, to beef up the green expertise of global engineering, architecture, design-build, surveying, and geospatial solutions firm Merrick & Company.
 
During the recession, multiple architecture and architecture/engineering firms also sought to broaden their client appeal by going on an engineering talent hunt. A third of AIA member firms now identify as “multidisciplinary,” including engineering services, compared with about 25% a decade ago, according to Morrissey Goodale.
 
SSOE Group is among the companies capitalizing on the volatile business climate. “We closed on three M&A transactions in 2012, so our emphasis in 2013 is on integration and realizing the synergies from the combined companies,” says CEO Tony Damon, AIA, LEED AP. “Our merger with Evergreen EDC in December should be transformative, allowing us to diversify our business and leverage our combined resources for new clients, in new markets and geographic locations.”
 

TOP ENGINEERING FIRMS

 
2012 Total Revenue ($)
1 Fluor $221,231,200
2 Arup $149,738,587
3 Affiliated Engineers $105,503,000
4 WSP USA $105,362,352
5 KPFF Consulting Engineers $91,000,000
6 Syska Hennessy Group $82,097,502
7 Henderson Engineers $63,485,775
8 Smith Seckman Reid $52,919,312
9 KJWW Engineering Consultants $51,092,154
10 Vanderweil Engineers $50,552,200

TOP ENGINEERING/ARCHITECTURE FIRMS

 
2012 Total Revenue ($)
1 Jacobs Engineering Group $2,715,210,000
2 AECOM Technology Corp. $1,610,390,000
3 Parsons Brinckerhoff $337,900,000
4 URS Corp. $314,266,757
5 Buro Happold Consulting Engineers $194,220,000
6 Burns & McDonnell $160,645,000
7 Thornton Tomasetti $124,575,393
8 Science Applications International Corp. $120,249,686
9 Merrick & Co. $103,998,000
10 SSOE Group $103,708,918
Damon credits a rebound in business from manufacturing and automotive clients, especially in the Southeast, for some of SSOE’s bullish attitude. Other hot prospects identified by Damon include the semiconductor industry in the West, and international markets, especially China, India, Mexico, and Brazil.
 
Steven Strauss, President of Glumac, reports good business from domestic micorelectronics companies and from Chinese clients, some of whom are developing entire new cities. Strauss has also seen an uptick in medical office buildings, mission critical, hospitality, and mixed-use commercial. “Projects that have been on the back burner are now re-emerging, and developer clients are more able to get financing through banks and institutional investors.”
 
For Bergmann Associates, the retail sector has been a bright spot. “The growth has been primarily with corporate retailers—big boxes, grocery stores, banks, restaurants—in New England and the Mid-Atlantic region,” says CEO Thomas C. Mitchell, PE. Property development companies in the East and Midwest have also been hiring the firm, and Bergmann has won new clients in science and technology, replacing some who have stopped building. The company recently added personnel in Michigan, Ohio, and the Carolinas.
 
In the West, Spectrum Engineers is getting a steady flow of work from retail, mission critical, and private commercial development, as well as some government clients. However, K-12 is “slow,” according to President and Principal Electrical Engineer Dave Wesemann, PE, LEED AP, ATD.
 
Considerable hustle is still required, even as the market improves. “Business continues to be challenging overall in the Southeast,” says Mark A. Gelfo, PE, LEED AP BD+C, LEED AP O+M, CxA, EMP, Director of Business Development and Sustainability at TLC Engineering for Architecture. “Competition remains high, and clients want more and more for less and less. During the past few years we have made significant initiatives in energy services, federal—though that market’s definitely on a downward track—mission critical, and hospitality, while maintaining our historically major markets such as healthcare, commercial office, and higher education.”
 
Like many engineering pros, Gelfo expects energy services—from commissioning, auditing, and retro-Cx to high-performance MEP design—to generate significant revenues for the foreseeable future. Spectrum’s Wesemann says advances in green technology, including LED lighting and variable-refrigerant flow HVAC, are persuading some clients to seek a more integrated delivery model to take advantage of all the potential savings.
 
According to Kenneth G. Diehl, Jr., PE, Senior Vice President at Smith Seckman Reid, building owners increasingly understand the high long-term ROI of green upgrades—a trend that can only be good news for engineers. “The biggest mover in this area is currently existing buildings that are using retrocommissioning to significantly lower utility costs,” he says. “The market is continuing to move toward a model that supports high-performance building operations.”
 

Read BD+C's full Giants 300 Report

Related Stories

| Feb 11, 2011

Justice center on Fall River harbor serves up daylight, sustainable elements, including eucalyptus millwork

Located on historic South Main Street in Fall River, Mass., the Fall River Justice Center opened last fall to serve as the city’s Superior and District Courts building. The $85 million facility was designed by Boston-based Finegold Alexander + Associates Inc., with Dimeo Construction as CM and Arup as MEP. The 154,000-sf courthouse contains nine courtrooms, a law library, and a detention area. Most of the floors have the same ceiling height, which will makes them easier to reconfigure in the future as space needs change. Designed to achieve LEED Silver, the facility’s elliptical design offers abundant natural daylight and views of the harbor. Renewable eucalyptus millwork is one of the sustainable features.

| Feb 11, 2011

Research facility separates but also connects lab spaces

California State University, Northridge, consolidated its graduate and undergraduate biology and mathematics programs into one 90,000-sf research facility. Architect of record Cannon Design worked on the new Chaparral Hall, creating a four-story facility with two distinct spaces that separate research and teaching areas; these are linked by faculty offices to create collaborative spaces. The building houses wet research, teaching, and computational research labs, a 5,000-sf vivarium, classrooms, and administrative offices. A four-story outdoor lobby and plaza and an outdoor staircase provide orientation. A covered walkway links the new facility with the existing science complex. Saiful/Bouquet served as structural engineer, Bard, Rao + Athanas Consulting Engineers served as MEP, and Research Facilities Design was laboratory consultant.

| Feb 11, 2011

A feast of dining options at University of Colorado community center, but hold the buffalo stew

The University of Colorado, Boulder, cooked up something different with its new $84.4 million Center for Community building, whose 900-seat foodservice area consists of 12 micro-restaurants, each with its own food options and décor. Centerbrook Architects of Connecticut collaborated with Denver’s Davis Partnership Architects and foodservice designer Baker Group of Grand Rapids, Mich., on the 323,000-sf facility, which also includes space for a career center, international education, and counseling and psychological services. Exterior walls of rough-hewn, variegated sandstone and a terra cotta roof help the new facility blend with existing campus buildings. Target: LEED Gold.

| Feb 11, 2011

Chicago high-rise mixes condos with classrooms for Art Institute students

The Legacy at Millennium Park is a 72-story, mixed-use complex that rises high above Chicago’s Michigan Avenue. The glass tower, designed by Solomon Cordwell Buenz, is mostly residential, but also includes 41,000 sf of classroom space for the School of the Art Institute of Chicago and another 7,400 sf of retail space. The building’s 355 one-, two-, three-, and four-bedroom condominiums range from 875 sf to 9,300 sf, and there are seven levels of parking. Sky patios on the 15th, 42nd, and 60th floors give owners outdoor access and views of Lake Michigan.

| Feb 11, 2011

Iowa surgery center addresses both inpatient and outpatient care

The 12,000-person community of Carroll, Iowa, has a new $28 million surgery center to provide both inpatient and outpatient care. Minneapolis-based healthcare design firm Horty Elving headed up the four-story, 120,000-sf project for St. Anthony’s Regional Hospital. The center’s layout is based on a circular process flow, and includes four 800-sf operating rooms with poured rubber floors to reduce leg fatigue for surgeons and support staff, two substerile rooms between each pair of operating rooms, and two endoscopy rooms adjacent to the outpatient prep and recovery rooms. Recovery rooms are clustered in groups of four. The large family lounge (left) has expansive windows with views of the countryside, and television monitors that display coded information on patient status so loved ones can follow a patient’s progress.

| Feb 11, 2011

Grocery store anchors shopping center in Miami arts/entertainment district

18Biscayne is a 57,200-sf urban retail center being developed in downtown Miami by commercial real estate firm Stiles. Construction on the three-story center is being fast-tracked for completion in early 2012. The project is anchored by a 49,200-sf Publix market with bakery, pharmacy, and café with outdoor seating. An additional 8,000 sf of retail space will front Biscayne Boulevard. The complex is in close proximity to the Adrienne Arsht Center for the Performing Arts, the downtown Miami entertainment district, and the Omni neighborhood, one of the city’s fast-growing residential areas.

| Feb 11, 2011

Chicago architecture firm planning one of China’s tallest towers

Chicago-based Goettsch Partners was commissioned by developer Guangzhou R&F Properties Co. Ltd. to design a new 294,570-sm mixed-use tower in Tianjin, China. The Tianjin R&F Guangdong Tower will be located within the city’s newly planned business district, and at 439 meters it will be one of China’s tallest buildings. The massive complex will feature 134,900 sm of Class A office space, a 400-key, five-star hotel, 55 condominiums, and 8,550 sm of retail space. The architects are designing the tower with multi-story atriums and a high-performance curtain wall to bring daylight deep into the building, thereby creating deeper lease spans. The project is currently finishing design.

| Feb 11, 2011

Two projects seek to reinvigorate Los Angeles County medical center

HMC Architects designed two new buildings for the Los Angeles County Martin Luther King, Jr., Medical Center as part of a $360 million plan to reinvigorate the campus. The buildings include a 120-bed hospital, which involves renovation of an existing tower and several support buildings, and the construction of a new multi-service ambulatory care center. The new facilities will have large expanses of glass at all waiting and public areas for unobstructed views of downtown Los Angeles. A curved glass entrance canopy will unite the two buildings. When both projects are completed—the hospital in 2012 and the ambulatory care center in 2013—the campus will have added more than 460,000 sf of space. The hospital will seek LEED certification, while the ambulatory care center is targeting LEED Silver.

| Feb 11, 2011

Sustainable community center to serve Angelinos in need

Harbor Interfaith Services, a nonprofit serving the homeless and working poor in the Harbor Area and South Bay communities of Los Angeles, engaged Withee Malcolm Architects to design a new 15,000-sf family resource center. The architects, who are working pro bono for the initial phase, created a family-centered design that consolidates all programs into a single building. The new three-story space will house a resource center, food pantry, nursery and pre-school, and administrative offices, plus indoor and outdoor play spaces and underground parking. The building’s scale and setbacks will help it blend with its residential neighbors, while its low-flow fixtures, low-VOC and recycled materials, and energy-efficient mechanical equipment and appliances will help it earn LEED certification.

| Feb 11, 2011

Texas megachurch inspired by yesteryear’s materials, today’s design vocabulary

The third phase of The First Baptist Church of Pasadena, Texas, involves construction of a new 115,000-sf worship center addition. Currently in design by Zeigler Cooper, the project will include a 2,500-seat worship center (with circular layout and space for a 50-person orchestra and 200-person choir), a 500-seat chapel (for weddings, funerals, and special events), and a prayer room. The addition will connect to the existing church and create a Christian Commons for education, administration, music, and fellowship. The church asked for a modern design that uses traditional materials, such as stone, brick, and stained glass. Construction is scheduled to begin this summer.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021