HED, a national AE firm based in Southfield, Mich., last week disclosed that it has merged with Puchlik Design Associates (PDA), an architectural firm based in Pasadena, Calif., that specializes in healthcare facility design.
HED and PDA had previously worked together on a number of projects, and the merger expands HED’s presence in southern California. “Bringing in PDA was a natural step towards deepening our commitment to southern California and to our expansive set of healthcare clients to provide greater, nationwide service,” says Peter Devereaux, FAIA, HED’s chief executive.
PDA’s leadership and staff join HED’s team in its expanded Los Angeles office. HED has eight offices nationwide, and the merger increases its total staff to over 470 people.
The merger increases HED's worker count to more than 470.
The merger bolsters HED’s position in the fast-growing healthcare sector. “PDA's decades of knowledge in California, a geography that leads the nation in healthcare trends and standards, combined with our existing depth of talent and national reach will bring tangible benefits to our healthcare clients,” says Devereaux.
Aside from healthcare, PDA’s design services have extended to education, senior living, infrastructure and seismic upgrades.
Related Stories
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.