HED, a national AE firm based in Southfield, Mich., last week disclosed that it has merged with Puchlik Design Associates (PDA), an architectural firm based in Pasadena, Calif., that specializes in healthcare facility design.
HED and PDA had previously worked together on a number of projects, and the merger expands HED’s presence in southern California. “Bringing in PDA was a natural step towards deepening our commitment to southern California and to our expansive set of healthcare clients to provide greater, nationwide service,” says Peter Devereaux, FAIA, HED’s chief executive.
PDA’s leadership and staff join HED’s team in its expanded Los Angeles office. HED has eight offices nationwide, and the merger increases its total staff to over 470 people.
The merger increases HED's worker count to more than 470.
The merger bolsters HED’s position in the fast-growing healthcare sector. “PDA's decades of knowledge in California, a geography that leads the nation in healthcare trends and standards, combined with our existing depth of talent and national reach will bring tangible benefits to our healthcare clients,” says Devereaux.
Aside from healthcare, PDA’s design services have extended to education, senior living, infrastructure and seismic upgrades.
Related Stories
| Jun 12, 2013
5 building projects that put the 'team' in teamwork
The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team.
| Jun 12, 2013
Sacred synergy achieves goals for religious education [2013 Building Team Award winner]
A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.
| Jun 12, 2013
‘Talking’ Braille maps help the visual impaired
Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.
| Jun 11, 2013
Music/dance building supports sweet harmony [2013 Building Team Award winner]
A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.
| Jun 11, 2013
Vertical urban campus fills a tall order [2013 Building Team Award winner]
Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.
| Jun 11, 2013
Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]
Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.
| Jun 11, 2013
Finnish elevator technology could facilitate supertall building design
KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.
| Jun 10, 2013
Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule
When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.
| Jun 7, 2013
Must see: Building façade made of massive concrete drain pipes
Looking to create a unique atmosphere using natural materials for the Prahran Hotel pub near Melbourne, local architect Techné Architects cleverly incorporated a series of concrete sewer pipes into the building's main façade.
| Jun 7, 2013
40 Under 40 retrospective: Where are they now?
Every month we’ll be catching up with past 40 Under 40 honorees to see what they’ve been up to since winning the award. This month we focus on a construction manager and a healthcare designer.