The national GC Suffolk is urging the Occupational Safety and Health Administration (OSHA) to incorporate suicide awareness and prevention training as a “core requirement” in its OSHA 10 and OSHA 30 curricula.
In a letter dated May 2 and sent to Douglas L. Parker, Assistant Secretary of Labor overseeing OSHA, John Fish, Suffolk’s Chairman and CEO, notes that more construction workers die annually from suicide than from all other workplace-related fatalities combined. The myriad causes that lead to suicides among construction workers include high psychological stress levels, chronic pain from the physical demands of work, emotional exhaustion, and substance and alcohol abuse.
On top of that, more than 15 percent of military veterans enter the construction industry after completing their service, and vets have a 50 percent higher rate of suicide than the general population’s.
“The time is now to rally our entire industry to address this dire issue,” states the letter. During Safety Week earlier this month, Suffolk hosted Mental Health Fireside Chats with noted clinicians to educate its employees on the problem and possible solutions. The firm also hosted webinars that inform employees about Suffolk’s mental health resources.
OSHA can guide the mental health discussion
The letter to Parker was co-signed by Brig. General (retired) Jack Hammond, Executive Director of Home Base, a national nonprofit that’s the largest private-sector clinic in the U.S., having treated more than 30,000 vets and trained more than 85,000 clinicians.
Fish and Hammond believe that OSHA has a critical role to play in driving the discussion around prioritizing “a widespread culture of support and transparency regarding mental health,” through better training, awareness, and resources.
Here is a copy of the letter:
Related Stories
| Nov 10, 2011
Suffolk Construction awarded MBTA transit facility and streetscape project
The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard
| Nov 10, 2011
Thornton Tomasetti’s Joseph and Choi to co-chair the Council on Tall Buildings and Urban Habitat’s Outrigger Design Working Group
Design guide will describe in detail the application of outriggers within the lateral load resisting systems of tall buildings, effects on building behavior and recommendations for design.
| Nov 9, 2011
American Standard Brands joins the Hospitality Sustainable Purchasing Consortium
American Standard will collaborate with other organizations to build an industry-wide sustainability performance index.
| Nov 8, 2011
Transforming a landmark coastal resort
Originally built in 1973, the building had received several alterations over the years but the progressive deterioration caused by the harsh salt water environment had never been addressed.
| Nov 8, 2011
WEB EXCLUSIVE: Moisture-related failures in agglomerated floor tiles
Agglomerated tiles offer an appealing appearance similar to natural stone at a lower cost. To achieve successful installations, manufacturers should provide design data for moisture-related dimensional changes, specifiers should require in-situ moisture testing similar to those used for other flooring materials, and the industry should develop standards for fabrication and installation of agglomerated tiles.
| Nov 8, 2011
$11 million business incubator Florida Innovation Hub at the University of Florida completed by Charles Perry Partners, Inc.
The facility houses the UF Office of Technology Licensing, UF Tech Connect, other entities, and more than 30 startup technology tenants.
| Nov 8, 2011
Designer joins Holabird & Root
Clifton has been awarded numerous awards throughout her career, including two AIA Chicago Design Excellence Awards.
| Nov 4, 2011
Mortenson Construction builds its fifth wind facility In Illinois
Shady Oaks Wind Farm is under construction near Compton, Ill.
| Nov 4, 2011
McCarthy completes construction of South Region High School No. 2 in Los Angeles
Despite rain delays and scope changes, the $96.7 million high school was completed nearly two-months ahead of schedule.