flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Meet Acquario Ceará: The giant crustacean-shaped aquarium that's causing concerns

Meet Acquario Ceará: The giant crustacean-shaped aquarium that's causing concerns

The aquarium is planned to be the third largest in the world after Georgia Aquarium and Dubai Mall aquarium.


By BD+C Staff | July 23, 2014

If you thought it would have never been possible for a multimillion-dollar project in Brazil to help create hundreds of jobs for Americans, think again, because it’s happening now.

The Acquario Ceará is a Brazilian public aquarium designed, engineered, financed, and currently under construction by multiple U.S. firms. The crustacean-shaped structure of steel and glass will stand along the Atlantic coast of the northeastern Brazilian city Fortaleza, designed with the hopes of being a new icon for South America.

The aquarium's intricate, exoskeleton-esque metalwork facade, designed by Imagic Brasil, the Latin American division of Cincinnati-based architect Jack Rouse Associates, will be fabricated by Kansas City, Mo.-based Zahner, whose portfolio includes two Gehry structures: the Pritzker Pavilion in Chicago and the Guggenheim Canopy in New York City.

According to The Atlantic’s CityLab, International Concept Management (ICM), a small business and custom aquarium maker in Grand Junction, Colorado, is overseeing construction of the project.

The aquarium, planned to be the third largest in the world after Georgia Aquarium and Dubai Mall aquarium, is set to open in 2015. According to the Kansas City Star, the aluminum support frame and aluminum skin plates that will cover it are currently being made in Zahner’s Midwestern fabrication shops, while the state of Ceará's governmental website indicates tubes and pipes are being made in Houston under ICM's supervision. Components will be shipped south to come together for the project.

But like many projects of its scale, the aquarium is not free of controversy. Brazilian critics say the aquarium is being built without transparency, CityLab reports. Moreover, the fact that such an expensive recreational facility is being built in one of Brazil’s poorest state’s is deemed as distasteful by some. 

In the U.S., critics are aimed at the project’s financial backing, which includes a $105 million direct loan from the taxpayer-funded federal export credit agency Export-Import Bank of the United States.

More on the project at CityLab.

Related Stories

| May 21, 2012

$61,000 awarded to students in Cleveland’s ACE Mentor Program

Mayor Frank G. Jackson gives keynote address at scholarship event for 80 Cleveland Metropolitan School District students involved in the ACE Mentor Program, which provides guidance and assistance for students interested in careers in the integrated construction industry.

| May 21, 2012

Wayne, Pa.'s Radnor Middle School wins national green award

Radnor Middle School among the most sustainable schools in the U.S.

| May 21, 2012

Winchester High School receives NuRoof system

Metal Roof Consultants attended a school board meeting and presented a sloped metal retrofit roof as an alternative to tearing off the existing roof and replacing it with another flat roof.

| May 17, 2012

EMerge Alliance forms new Campus Microgrid Technical Standards Committee

Intel leading the charge to connect multiple DC microgrids throughout commercial buildings; others invited to join effort.

| May 16, 2012

AIA issues guide to IGCC

Getting the IgCC adopted in all 50 states and in jurisdictions across the country is the primary mission of the ICC, which published the code in March.

| May 16, 2012

Architecture Billings Index reverts to negative territory

Decline is possibly a brief pause from unusually strong winter activity.

| May 16, 2012

AEG releases 3D video of L.A.'s Farmers Field

The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.

| May 16, 2012

Balfour Beatty Construction taps Kiger as VP of operations

Kiger will manage current relationships and pursue other strategic clients, including select healthcare clients and strategic project pursuits in the Central Tennessee region.

| May 15, 2012

One World Trade Center goes to new height of sustainability

One of the biggest challenges in developing this concrete mixture was meeting the Port Authority of New York/New Jersey’s strict requirement for the replacement of cement.

| May 15, 2012

Suffolk selected for Rosenwald Elementary modernization project

The 314-student station elementary school will undergo extensive modernization.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021