flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Meet Acquario Ceará: The giant crustacean-shaped aquarium that's causing concerns

Meet Acquario Ceará: The giant crustacean-shaped aquarium that's causing concerns

The aquarium is planned to be the third largest in the world after Georgia Aquarium and Dubai Mall aquarium.


By BD+C Staff | July 23, 2014

If you thought it would have never been possible for a multimillion-dollar project in Brazil to help create hundreds of jobs for Americans, think again, because it’s happening now.

The Acquario Ceará is a Brazilian public aquarium designed, engineered, financed, and currently under construction by multiple U.S. firms. The crustacean-shaped structure of steel and glass will stand along the Atlantic coast of the northeastern Brazilian city Fortaleza, designed with the hopes of being a new icon for South America.

The aquarium's intricate, exoskeleton-esque metalwork facade, designed by Imagic Brasil, the Latin American division of Cincinnati-based architect Jack Rouse Associates, will be fabricated by Kansas City, Mo.-based Zahner, whose portfolio includes two Gehry structures: the Pritzker Pavilion in Chicago and the Guggenheim Canopy in New York City.

According to The Atlantic’s CityLab, International Concept Management (ICM), a small business and custom aquarium maker in Grand Junction, Colorado, is overseeing construction of the project.

The aquarium, planned to be the third largest in the world after Georgia Aquarium and Dubai Mall aquarium, is set to open in 2015. According to the Kansas City Star, the aluminum support frame and aluminum skin plates that will cover it are currently being made in Zahner’s Midwestern fabrication shops, while the state of Ceará's governmental website indicates tubes and pipes are being made in Houston under ICM's supervision. Components will be shipped south to come together for the project.

But like many projects of its scale, the aquarium is not free of controversy. Brazilian critics say the aquarium is being built without transparency, CityLab reports. Moreover, the fact that such an expensive recreational facility is being built in one of Brazil’s poorest state’s is deemed as distasteful by some. 

In the U.S., critics are aimed at the project’s financial backing, which includes a $105 million direct loan from the taxpayer-funded federal export credit agency Export-Import Bank of the United States.

More on the project at CityLab.

Related Stories

| Mar 20, 2013

Architecture Billings Index up again in February

The American Institute of Architects reported the February ABI score was 54.9, up slightly from a mark of 54.2 in January. This score reflects a strong increase in demand for design services.

| Mar 18, 2013

Toyo Ito named 2013 Pritzker Architecture Prize recipient

Toyo Ito, a 71 year old architect whose architectural practice is based in Tokyo, Japan, will be the recipient of the 2013 Pritzker Architecture Prize.

| Mar 15, 2013

AIA opposes House bill cutting Eisenhower Memorial funding

AIA opposes House bill cutting Eisenhower Memorial funding.

| Mar 15, 2013

Singapore R&D campus takes top honor in Lab of Year competition

Singapore CREATE R&D campus takes top honor in Lab of Year competition, sponsored by R&D Magazine.

| Mar 15, 2013

7 most endangered buildings in Chicago

The Chicago Preservation Society released its annual list of the buildings at high risk for demolition.

| Mar 14, 2013

How to win more work from community colleges

The nation’s thousand-plus community college districts can be a steady source of income for your Building Team—provided you appreciate the special needs of this important sector of the higher education market.

| Mar 14, 2013

Rohit Saxena joins Perkins Eastman as principal

Rohit Saxena AIA, LEED AP has joined Perkins Eastman's Mumbai office as a Principal.

boombox1
boombox2
native1

More In Category



Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021