flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Meet Acquario Ceará: The giant crustacean-shaped aquarium that's causing concerns

Meet Acquario Ceará: The giant crustacean-shaped aquarium that's causing concerns

The aquarium is planned to be the third largest in the world after Georgia Aquarium and Dubai Mall aquarium.


By BD+C Staff | July 23, 2014

If you thought it would have never been possible for a multimillion-dollar project in Brazil to help create hundreds of jobs for Americans, think again, because it’s happening now.

The Acquario Ceará is a Brazilian public aquarium designed, engineered, financed, and currently under construction by multiple U.S. firms. The crustacean-shaped structure of steel and glass will stand along the Atlantic coast of the northeastern Brazilian city Fortaleza, designed with the hopes of being a new icon for South America.

The aquarium's intricate, exoskeleton-esque metalwork facade, designed by Imagic Brasil, the Latin American division of Cincinnati-based architect Jack Rouse Associates, will be fabricated by Kansas City, Mo.-based Zahner, whose portfolio includes two Gehry structures: the Pritzker Pavilion in Chicago and the Guggenheim Canopy in New York City.

According to The Atlantic’s CityLab, International Concept Management (ICM), a small business and custom aquarium maker in Grand Junction, Colorado, is overseeing construction of the project.

The aquarium, planned to be the third largest in the world after Georgia Aquarium and Dubai Mall aquarium, is set to open in 2015. According to the Kansas City Star, the aluminum support frame and aluminum skin plates that will cover it are currently being made in Zahner’s Midwestern fabrication shops, while the state of Ceará's governmental website indicates tubes and pipes are being made in Houston under ICM's supervision. Components will be shipped south to come together for the project.

But like many projects of its scale, the aquarium is not free of controversy. Brazilian critics say the aquarium is being built without transparency, CityLab reports. Moreover, the fact that such an expensive recreational facility is being built in one of Brazil’s poorest state’s is deemed as distasteful by some. 

In the U.S., critics are aimed at the project’s financial backing, which includes a $105 million direct loan from the taxpayer-funded federal export credit agency Export-Import Bank of the United States.

More on the project at CityLab.

Related Stories

| Aug 27, 2014

Ranked: Top sports facility sector AEC firms [2014 Giants 300 Report]

Populous, AECOM, and Turner head BD+C's rankings of the nation's largest sports facility design and construction firms, as reported in the 2014 Giants 300 Report.

| Aug 27, 2014

Frank Lloyd Wright’s Taliesin school of architecture faces accreditation loss

The Frank Lloyd School of Architecture may be stripped of its ability to confer Master of Architects students based on a revised by-law of the Higher Learning Commission.

| Aug 27, 2014

Survey of NCAA athletic directors reveals strong demand for new facilities, fan amenities

More than 80% of college athletic directors plan to make significant investments in facilities over the next five years to target potential recruits and spectators, according to a new survey by AECOM and Ohio University.

| Aug 27, 2014

Study looks at lessons from involving children in K-12 school design

A study examining what architects can learn from children, especially during the design process, is being carried out through the University of Sheffield's school of architecture. 

| Aug 27, 2014

Designs for community-based workspace in Carlsbad unveiled

Cruzan announced make, a 175,000-square-foot office redevelopment project on the coast of Carlsbad, Calif. Cruzan will usher this next generation of community-based, integrated workspace into existence in fall 2014.

| Aug 26, 2014

6 lessons from a true IPD project: George Washington University Hospital

In its latest blog post, Skanska shares tips and takeaways from the firm's second true integrated project delivery project.

| Aug 26, 2014

Ranked: Top industrial sector AEC firms [2014 Giants 300 Report]

Stantec, Jacobs, and Turner top BD+C's rankings of the nation's largest industrial sector design and construction firms, as reported in the 2014 Giants 300 Report.

| Aug 26, 2014

High-rise concept uses 'sky street' to link towers [slideshow]

The design for a new complex in Shenzhen’s bay area consists of highly reflective glass towers, expansive garden space, and a horizontal glass structure that connects the buildings.

| Aug 25, 2014

Restoration of quake-ravaged Atascadero City Hall affirms city’s strength [2014 Reconstruction Awards]

The landmark city hall was severely damaged by the San Simeon earthquake in 2003. Reconstruction renewed the building’s stability, restored its exterior, and improved the functionality of the interior. 

| Aug 25, 2014

Ranked: Top cultural facility sector AEC firms [2014 Giants 300 Report]

Arup, Gensler, and Turner head BD+C's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2014 Giants 300 Report.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021