flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Measuring whole building energy use among big changes in LEED v4

Measuring whole building energy use among big changes in LEED v4

The prerequisite also requires energy use data to be shared with USGBC.


By BD+C Staff | January 2, 2014

A new prerequisite in LEED v4 calls for each project to measure whole building energy use, and then share that data with USGBC. Other key changes in the latest version of LEED include:

• Two new prerequisites for building-level water metering and outdoor water use reduction.
• Demand response credit requires that the demand response system must be capable of being fully automated, but can be operated in a semi-automated way.
• Renewable energy production credit increases the number of points available for renewable energy.
• Advanced energy metering prerequisite requires a permanent metering system that records intervals of one hour or less, and the meter must transmit that data to a remote location.
• Under the new Building Product Disclosure and Optimization credit, LEED v4 awards points for construction projects that use at least 20 building products that have issued Environmental Product Declarations or Health Product Declarations.

 (http://www.greentechmedia.com/articles/read/5-energy-changes-to-leed-v.4)

Related Stories

Sponsored | Energy Efficiency | Sep 28, 2015

Nation’s first zero energy retail store features metal roof, composite panels

The building, a Walgreens made with metal and composite material from Petersen Aluminum Corp., includes enough sustainable features to attempt to earn LEED Platinum status.

Energy Efficiency | Sep 25, 2015

Federal renewable energy mandate prompts retrofits

Agencies must get 30% of electricity from renewables by 2025

Energy Efficiency | Aug 28, 2015

North American Passive House Network e-book explains Passivhaus, net-zero techniques

Free guide includes spotlight on individual projects

Energy Efficiency | Aug 24, 2015

Google develops Google Maps for solar energy

The tool offers high-resolution aerial maps, like the one used in Google Earth, to estimate the total sunlight a rooftop receives throughout the year.

Sponsored | Metals | Jul 20, 2015

Life cycle assessment, and why you should care

LCA is a way of quantifying the environmental impact generated by the manufacture and delivery of a product.

Sponsored | Energy Efficiency | Jun 30, 2015

Which Is More Efficient: Wood Walls or Steel and Masonry With Continuous Insulation?

By nature, wood has nearly four times the thermal resistance of steel or masonry

boombox1
boombox2
native1

More In Category



Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.


Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021