flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

McHugh Construction completes 5th-tallest all-residential building in the U.S.

Multifamily Housing

McHugh Construction completes 5th-tallest all-residential building in the U.S.

Rafael Viñoly is the architect for the 896-foot-tall NEMA Chicago. Also completed: the 11-story Westerly.


By JAMES MCHUGH CONSTRUCTION CO. | January 11, 2021
NEMA CHICAGO, JAMES MCHUGH CONSTRUCTION

The 800-unit NEMA Chicago, recently completed by McHugh Construction, is the city’s tallest rental tower, at 896 feet. Photo: Courtesy Crescent Heights

CHICAGO (Jan. 11, 2021) – James McHugh Construction Co., one of the country’s largest commercial contractors with a concentration in high-end multifamily projects, has completed the ground-up construction of two apartment developments in Chicago: NEMA Chicago by Crescent Heights in the South Loop, and the 11-story Westerly by Fifield Cos. in the River West neighborhood.

At 76 stories, NEMA Chicago is the tallest all-residential building in Chicago and fifth tallest in North America.

"These two projects are indicative of the range of multifamily work McHugh excels at – whether it’s a mid-rise for a repeat client or a supertall, a product we know how to build like the back of our hand," said Michael Meagher, President of McHugh Construction. “While the pandemic added another layer of complexity, our quick pivot to adopting new social distancing protocols allowed us to stay on time and on budget for both of these high-end buildings.”

 

NEMA CHICAGO SOARS TO 896 FEET IN CHICAGO'S SOUTH LOOP

McHugh Construction recently completed the final phase of the 896-foot NEMA Chicago, the city’s tallest apartment tower. McHugh broke ground in 2016 for the 76-story building and topped off the concrete-framed structure in 2018. Residents began moving into the building in May 2019, while McHugh continued interior build-out of floors 48 through 76. Final completion, including the Skyline Collection residences and the Signature Amenity spaces at Level 48, was achieved in September 2020.

“Thoughtful design and impeccable finishes – from coffered ceilings to ornamental metalwork – were carried throughout the development, requiring us to carefully select a team that could work with the custom materials while hitting timing goals,” said Dave Steffenhagen, McHugh Construction Senior Project Manager on NEMA Chicago. “Through constant collaboration with the owner, architect, and subcontractors, the project met the intent of the designers and was delivered on budget and ahead of schedule.”

 

DEVELOPER CRESCENT HEIGHTS SWITCHES GEARS ON USE OF WHITE BOX AMENITY SPACE

Developed by Miami-based Crescent Heights and designed by world-renowned architect Rafael Viñoly, the 76-story NEMA Chicago,1210 S. Indiana Ave., offers 800 apartments. The building’s 70,000 sf of amenity space includes several indoor and outdoor lounges and terraces; two swimming pools; sauna and steam rooms; a glass-enclosed event space with an immersive sound system and catering kitchen; and a private bar lounge with 22-foot ceiling heights and floor-to-ceiling windows. The fitness center includes strength and cardio areas as well as a boxing ring, yoga studio, basketball and squash courts, and a golf simulator. 

NEMA Chicago also gave McHugh the opportunity to complete one of the few “real time” design spaces it’s seen in the multifamily sector. A large section of the building’s 48th floor was intentionally left as a “white box” amenity space until most of the building was completed and residents had already begun to move in. While the space was tentatively earmarked for a yoga studio, the pandemic and popularity of the building’s coworking spaces prompted Crescent Heights to change the design for the space into office/business suites. This meant McHugh had a condensed schedule to order materials and complete construction within the set time frame.

“Tastes, trends, and tenant preferences can change drastically between groundbreaking and first move-ins,” Steffenhagen said. “By leaving this space purposely vacant until the last possible moment in the construction schedule, we were able to work closely with the developer and architects to change course and create additional coworking space for residents.”

 

WESTERLY ADDS 188 LUXURY UNITS IN CHICAGO'S RIVER WEST

Located at 740 N. Aberdeen St., Westerly is a mixed-used development by Chicago-based Fifield Cos. offering 188 apartments and 2,400 sf of ground-floor retail space.

Designed by FitzGerald Associates Architects, the mid-rise building features a brick and glass façade and includes a mix of studio, one-, two- and three-bedroom units, ranging in size from 544 to 1,513 square feet, with interiors by Morgante Wilson Architects. McHugh broke ground on the project in July 2019 and completed the building in October 2020. Substantial completion was received on the project three weeks ahead of schedule despite the pandemic.

“Westerly marks the eighth project we have completed for Fifield Cos. in the last 12 years,” said Ray Cisco, Project Executive with McHugh Construction. "Our previous history with Fifield and FitzGerald facilitated a seamless experience, especially when something unexpected like a pandemic comes up.”

 

Westerly, Chicago, Fifield Cos.

Westerly, a 188-unit mixed-use apartment building in Chicago by McHugh Construction for Fifield Cos. Photo: Courtesy Fifield Cos.

 

With Westerly’s location along the city’s Hipster Highway bikeway, McHugh constructed ample bike storage and a bike kitchen for maintenance and repairs, in addition to a parking garage with 80 spaces. Building amenities include a fitness center, resident lounge, penthouse-level party room, coffee bar, conference center, and dedicated coworking space. Outdoor amenities include a landscaped sun terrace on Westerly’s third level, featuring a pool, shade cabanas, grilling stations, and private seating and dining areas.

 

JAMES MCHUGH CONSTRUCTION CO.: FOUNDED IN 1897

Since its founding in 1897, James McHugh Construction Co. has earned its reputation as a builder of landmark, one-of-a-kind structures in Chicago and other areas of the country. The company specializes in managing multimillion-dollar projects, from ground-up new construction to complex renovations and high-end interiors. As a multi-faceted general contractor, McHugh constructs high-rise concrete towers; steel structures; and buildings using alternative materials such as cold-formed steel, heavy timber, and cross-laminated timber.

McHugh has built and renovated iconic structures such as Chicago’s Marina City, Vista Tower, Trump Tower, Aqua Tower, Blackstone Hotel, Navy Pier (including the 200-foot-tall Centennial Wheel and most recently, the Sable Hotel at Navy Pier, Curio Collection by Hilton, and the Offshore Rooftop and Bar), as well as other noteworthy projects in regional markets such as Loring Park Tower in Minneapolis, Two Twelve Clayton and Westin Cupples Station in the St. Louis area, and multiple projects in Nashville and Miami. 

For more information on the company, visit www.mchughconstruction.com.

Related Stories

Office Buildings | Feb 12, 2023

Smyrna Ready Mix’s new office HQ mimics the patterns in the company’s onsite stone quarry

Designed by EOA Architects to showcase various concrete processes and applications, Smyrna Ready Mix's new office headquarters features vertical layering that mimics the patterns in the company’s stone quarry, located on the opposite end of the campus site. The building’s glass and concrete bands are meant to mirror the quarry’s natural contours and striations.

Multifamily Housing | Feb 10, 2023

Dallas to get a 19-story, 351-unit residential high-rise

In Dallas, work has begun on a new multifamily high-rise called The Oliver. The 19-story, 351-unit apartment building will be located within The Central, a 27-acre mixed-use development near the Knox/Henderson neighborhood north of downtown Dallas. 

Sustainability | Feb 9, 2023

New guide for planning, designing, and operating onsite water reuse systems

The Pacific Institute, a global nonpartisan water think tank, has released guidance for developers to plan, design, and operate onsite water reuse systems. The Guide for Developing Onsite Water Systems to Support Regional Water Resilience advances circular, localized approaches to managing water that reduce a site’s water footprint, improve its resilience to water shortage or other disruptions, and provide benefits for local communities and regional water systems.

Office Buildings | Feb 9, 2023

Post-Covid Manhattan office market rebound gaining momentum

Office workers in Manhattan continue to return to their workplaces in sufficient numbers for many of their employers to maintain or expand their footprint in the city, according to a survey of more than 140 major Manhattan office employers conducted in January by The Partnership for New York City.

Giants 400 | Feb 9, 2023

New Giants 400 download: Get the complete at-a-glance 2022 Giants 400 rankings in Excel

See how your architecture, engineering, or construction firm stacks up against the nation's AEC Giants. For more than 45 years, the editors of Building Design+Construction have surveyed the largest AEC firms in the U.S./Canada to create the annual Giants 400 report. This year, a record 519 firms participated in the Giants 400 report. The final report includes 137 rankings across 25 building sectors and specialty categories.   

University Buildings | Feb 8, 2023

STEM-focused Kettering University opens Stantec-designed Learning Commons

In Flint, Mich., Kettering University opened its new $63 million Learning Commons, designed by Stantec. The new facility will support collaboration, ideation, and digital technology for the STEM-focused higher learning institution.

Sustainability | Feb 8, 2023

A wind energy system—without the blades—can be placed on commercial building rooftops

Aeromine Technologies’ bladeless system captures and amplifies a building’s airflow like airfoils on a race car.

Codes and Standards | Feb 8, 2023

GSA releases draft of federal low embodied carbon material standards

The General Services Administration recently released a document that outlines standards for low embodied carbon materials and products to be used on federal construction projects.

University Buildings | Feb 7, 2023

Kansas City University's Center for Medical Education Innovation can adapt to changes in medical curriculum

The Center for Medical Education Innovation (CMEI) at Kansas City University was designed to adapt to changes in medical curriculum and pedagogy. The project program supported the mission of training leaders in osteopathic medicine with a state-of-the-art facility that leverages active-learning and simulation-based training.

Giants 400 | Feb 6, 2023

2022 Reconstruction Sector Giants: Top architecture, engineering, and construction firms in the U.S. building reconstruction and renovation sector

Gensler, Stantec, IPS, Alfa Tech, STO Building Group, and Turner Construction top BD+C's rankings of the nation's largest reconstruction sector architecture, engineering, and construction firms, as reported in the 2022 Giants 400 Report.

boombox1
boombox2
native1

More In Category


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021