flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

McHugh Construction completes 5th-tallest all-residential building in the U.S.

Multifamily Housing

McHugh Construction completes 5th-tallest all-residential building in the U.S.

Rafael Viñoly is the architect for the 896-foot-tall NEMA Chicago. Also completed: the 11-story Westerly.


By JAMES MCHUGH CONSTRUCTION CO. | January 11, 2021
NEMA CHICAGO, JAMES MCHUGH CONSTRUCTION

The 800-unit NEMA Chicago, recently completed by McHugh Construction, is the city’s tallest rental tower, at 896 feet. Photo: Courtesy Crescent Heights

CHICAGO (Jan. 11, 2021) – James McHugh Construction Co., one of the country’s largest commercial contractors with a concentration in high-end multifamily projects, has completed the ground-up construction of two apartment developments in Chicago: NEMA Chicago by Crescent Heights in the South Loop, and the 11-story Westerly by Fifield Cos. in the River West neighborhood.

At 76 stories, NEMA Chicago is the tallest all-residential building in Chicago and fifth tallest in North America.

"These two projects are indicative of the range of multifamily work McHugh excels at – whether it’s a mid-rise for a repeat client or a supertall, a product we know how to build like the back of our hand," said Michael Meagher, President of McHugh Construction. “While the pandemic added another layer of complexity, our quick pivot to adopting new social distancing protocols allowed us to stay on time and on budget for both of these high-end buildings.”

 

NEMA CHICAGO SOARS TO 896 FEET IN CHICAGO'S SOUTH LOOP

McHugh Construction recently completed the final phase of the 896-foot NEMA Chicago, the city’s tallest apartment tower. McHugh broke ground in 2016 for the 76-story building and topped off the concrete-framed structure in 2018. Residents began moving into the building in May 2019, while McHugh continued interior build-out of floors 48 through 76. Final completion, including the Skyline Collection residences and the Signature Amenity spaces at Level 48, was achieved in September 2020.

“Thoughtful design and impeccable finishes – from coffered ceilings to ornamental metalwork – were carried throughout the development, requiring us to carefully select a team that could work with the custom materials while hitting timing goals,” said Dave Steffenhagen, McHugh Construction Senior Project Manager on NEMA Chicago. “Through constant collaboration with the owner, architect, and subcontractors, the project met the intent of the designers and was delivered on budget and ahead of schedule.”

 

DEVELOPER CRESCENT HEIGHTS SWITCHES GEARS ON USE OF WHITE BOX AMENITY SPACE

Developed by Miami-based Crescent Heights and designed by world-renowned architect Rafael Viñoly, the 76-story NEMA Chicago,1210 S. Indiana Ave., offers 800 apartments. The building’s 70,000 sf of amenity space includes several indoor and outdoor lounges and terraces; two swimming pools; sauna and steam rooms; a glass-enclosed event space with an immersive sound system and catering kitchen; and a private bar lounge with 22-foot ceiling heights and floor-to-ceiling windows. The fitness center includes strength and cardio areas as well as a boxing ring, yoga studio, basketball and squash courts, and a golf simulator. 

NEMA Chicago also gave McHugh the opportunity to complete one of the few “real time” design spaces it’s seen in the multifamily sector. A large section of the building’s 48th floor was intentionally left as a “white box” amenity space until most of the building was completed and residents had already begun to move in. While the space was tentatively earmarked for a yoga studio, the pandemic and popularity of the building’s coworking spaces prompted Crescent Heights to change the design for the space into office/business suites. This meant McHugh had a condensed schedule to order materials and complete construction within the set time frame.

“Tastes, trends, and tenant preferences can change drastically between groundbreaking and first move-ins,” Steffenhagen said. “By leaving this space purposely vacant until the last possible moment in the construction schedule, we were able to work closely with the developer and architects to change course and create additional coworking space for residents.”

 

WESTERLY ADDS 188 LUXURY UNITS IN CHICAGO'S RIVER WEST

Located at 740 N. Aberdeen St., Westerly is a mixed-used development by Chicago-based Fifield Cos. offering 188 apartments and 2,400 sf of ground-floor retail space.

Designed by FitzGerald Associates Architects, the mid-rise building features a brick and glass façade and includes a mix of studio, one-, two- and three-bedroom units, ranging in size from 544 to 1,513 square feet, with interiors by Morgante Wilson Architects. McHugh broke ground on the project in July 2019 and completed the building in October 2020. Substantial completion was received on the project three weeks ahead of schedule despite the pandemic.

“Westerly marks the eighth project we have completed for Fifield Cos. in the last 12 years,” said Ray Cisco, Project Executive with McHugh Construction. "Our previous history with Fifield and FitzGerald facilitated a seamless experience, especially when something unexpected like a pandemic comes up.”

 

Westerly, Chicago, Fifield Cos.

Westerly, a 188-unit mixed-use apartment building in Chicago by McHugh Construction for Fifield Cos. Photo: Courtesy Fifield Cos.

 

With Westerly’s location along the city’s Hipster Highway bikeway, McHugh constructed ample bike storage and a bike kitchen for maintenance and repairs, in addition to a parking garage with 80 spaces. Building amenities include a fitness center, resident lounge, penthouse-level party room, coffee bar, conference center, and dedicated coworking space. Outdoor amenities include a landscaped sun terrace on Westerly’s third level, featuring a pool, shade cabanas, grilling stations, and private seating and dining areas.

 

JAMES MCHUGH CONSTRUCTION CO.: FOUNDED IN 1897

Since its founding in 1897, James McHugh Construction Co. has earned its reputation as a builder of landmark, one-of-a-kind structures in Chicago and other areas of the country. The company specializes in managing multimillion-dollar projects, from ground-up new construction to complex renovations and high-end interiors. As a multi-faceted general contractor, McHugh constructs high-rise concrete towers; steel structures; and buildings using alternative materials such as cold-formed steel, heavy timber, and cross-laminated timber.

McHugh has built and renovated iconic structures such as Chicago’s Marina City, Vista Tower, Trump Tower, Aqua Tower, Blackstone Hotel, Navy Pier (including the 200-foot-tall Centennial Wheel and most recently, the Sable Hotel at Navy Pier, Curio Collection by Hilton, and the Offshore Rooftop and Bar), as well as other noteworthy projects in regional markets such as Loring Park Tower in Minneapolis, Two Twelve Clayton and Westin Cupples Station in the St. Louis area, and multiple projects in Nashville and Miami. 

For more information on the company, visit www.mchughconstruction.com.

Related Stories

| Nov 11, 2010

Saint-Gobain to make $80 million investment in SAGE Electrochromics

Saint-Gobain, one of the world’s largest glass and construction material manufacturers, is making a strategic equity investment in SAGE Electrochromics to make electronically tintable “dynamic glass” an affordable, mass-market product, ushering in a new era of energy-saving buildings.

| Nov 11, 2010

Saint-Gobain to make $80 million investment in SAGE Electrochromics

Saint-Gobain, one of the world’s largest glass and construction material manufacturers, is making a strategic equity investment in SAGE Electrochromics to make electronically tintable “dynamic glass” an affordable, mass-market product, ushering in a new era of energy-saving buildings.

| Nov 11, 2010

USGBC certifies more than 1 billion square feet of commercial space

This month, the total footprint of commercial projects certified under the U.S. Green Building Council’s LEED Green Building Rating System surpassed one billion square feet. Another six billion square feet of projects are registered and currently working toward LEED certification around the world. Since 2000, more than 36,000 commercial projects and 38,000 single-family homes have participated in LEED.

| Nov 10, 2010

$700 million plan to restore the National Mall

The National Mall—known as America’s front yard—is being targeted for a massive rehab and restoration that could cost as much as $700 million (it’s estimated that the Mall has $400 million in deferred maintenance alone). A few of the proposed projects: refurbishing the Grant Memorial, replacing the Capitol Reflecting Pool with a smaller pool or fountain, reconstructing the Constitution Gardens lake and constructing a multipurpose visitor center, and replacing the Sylvan Theater near the Washington Monument with a new multipurpose facility.

| Nov 9, 2010

Just how green is that college campus?

The College Sustainability Report Card 2011 evaluated colleges and universities in the U.S. and Canada with the 300 largest endowments—plus 22 others that asked to be included in the GreenReportCard.org study—on nine categories, including climate change, energy use, green building, and investment priorities. More than half (56%) earned a B or better, but 6% got a D. Can you guess which is the greenest of these: UC San Diego, Dickinson College, University of Calgary, and Dartmouth? Hint: The Red Devil has turned green.

| Nov 9, 2010

12 incredible objects being made with 3D printers today

BD+C has reported on how 3D printers are attracting the attention of AEC firms. Now you can see how other creative types are utilizing this fascinating printing technology. Among the printed items: King Tut’s remains, designer shoes, and the world’s smallest Rubik’s Cube.

| Nov 9, 2010

U.S. Army steps up requirements for greening building

Cool roofs, solar water heating, and advanced metering are among energy-efficiency elements that will have to be used in new permanent Army buildings in the U.S. and abroad starting in FY 2013. Designs for new construction and major renovations will incorporate sustainable design and development principles contained in ASHRAE 189.1.

| Nov 9, 2010

Designing a library? Don’t focus on books

How do you design a library when print books are no longer its core business? Turn them into massive study halls. That’s what designers did at the University of Amsterdam, where they transformed the existing 27,000-sf library into a study center—without any visible books. About 2,000 students visit the facility daily and encounter workspaces instead of stacks.

| Nov 9, 2010

Turner Construction report: Green buildings still on the agenda

Green buildings continue to be on the agenda for real estate owners, developers, and corporate owner-occupants, according to the Turner 2010 Green Building Market Barometer. Key findings: Almost 90% of respondents said it was extremely or very likely they would incorporate energy-efficiency improvements in their new construction or renovation project, and 60% expected to incorporate improvements to water efficiency, indoor environmental quality, and green materials.

| Nov 5, 2010

New Millennium’s Gary Heasley on BIM, LEED, and the nonresidential market

Gary Heasley, president of New Millennium Building Systems, Fort Wayne, Ind., and EVP of its parent company, Steel Dynamics, Inc., tells BD+C’s Robert Cassidy about the Steel Joist Manufacturer’s westward expansion, its push to create BIM tools for its products, LEED, and the outlook for the nonresidential construction market.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021