flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

McHugh Construction completes 5th-tallest all-residential building in the U.S.

Multifamily Housing

McHugh Construction completes 5th-tallest all-residential building in the U.S.

Rafael Viñoly is the architect for the 896-foot-tall NEMA Chicago. Also completed: the 11-story Westerly.


By JAMES MCHUGH CONSTRUCTION CO. | January 11, 2021
NEMA CHICAGO, JAMES MCHUGH CONSTRUCTION

The 800-unit NEMA Chicago, recently completed by McHugh Construction, is the city’s tallest rental tower, at 896 feet. Photo: Courtesy Crescent Heights

CHICAGO (Jan. 11, 2021) – James McHugh Construction Co., one of the country’s largest commercial contractors with a concentration in high-end multifamily projects, has completed the ground-up construction of two apartment developments in Chicago: NEMA Chicago by Crescent Heights in the South Loop, and the 11-story Westerly by Fifield Cos. in the River West neighborhood.

At 76 stories, NEMA Chicago is the tallest all-residential building in Chicago and fifth tallest in North America.

"These two projects are indicative of the range of multifamily work McHugh excels at – whether it’s a mid-rise for a repeat client or a supertall, a product we know how to build like the back of our hand," said Michael Meagher, President of McHugh Construction. “While the pandemic added another layer of complexity, our quick pivot to adopting new social distancing protocols allowed us to stay on time and on budget for both of these high-end buildings.”

 

NEMA CHICAGO SOARS TO 896 FEET IN CHICAGO'S SOUTH LOOP

McHugh Construction recently completed the final phase of the 896-foot NEMA Chicago, the city’s tallest apartment tower. McHugh broke ground in 2016 for the 76-story building and topped off the concrete-framed structure in 2018. Residents began moving into the building in May 2019, while McHugh continued interior build-out of floors 48 through 76. Final completion, including the Skyline Collection residences and the Signature Amenity spaces at Level 48, was achieved in September 2020.

“Thoughtful design and impeccable finishes – from coffered ceilings to ornamental metalwork – were carried throughout the development, requiring us to carefully select a team that could work with the custom materials while hitting timing goals,” said Dave Steffenhagen, McHugh Construction Senior Project Manager on NEMA Chicago. “Through constant collaboration with the owner, architect, and subcontractors, the project met the intent of the designers and was delivered on budget and ahead of schedule.”

 

DEVELOPER CRESCENT HEIGHTS SWITCHES GEARS ON USE OF WHITE BOX AMENITY SPACE

Developed by Miami-based Crescent Heights and designed by world-renowned architect Rafael Viñoly, the 76-story NEMA Chicago,1210 S. Indiana Ave., offers 800 apartments. The building’s 70,000 sf of amenity space includes several indoor and outdoor lounges and terraces; two swimming pools; sauna and steam rooms; a glass-enclosed event space with an immersive sound system and catering kitchen; and a private bar lounge with 22-foot ceiling heights and floor-to-ceiling windows. The fitness center includes strength and cardio areas as well as a boxing ring, yoga studio, basketball and squash courts, and a golf simulator. 

NEMA Chicago also gave McHugh the opportunity to complete one of the few “real time” design spaces it’s seen in the multifamily sector. A large section of the building’s 48th floor was intentionally left as a “white box” amenity space until most of the building was completed and residents had already begun to move in. While the space was tentatively earmarked for a yoga studio, the pandemic and popularity of the building’s coworking spaces prompted Crescent Heights to change the design for the space into office/business suites. This meant McHugh had a condensed schedule to order materials and complete construction within the set time frame.

“Tastes, trends, and tenant preferences can change drastically between groundbreaking and first move-ins,” Steffenhagen said. “By leaving this space purposely vacant until the last possible moment in the construction schedule, we were able to work closely with the developer and architects to change course and create additional coworking space for residents.”

 

WESTERLY ADDS 188 LUXURY UNITS IN CHICAGO'S RIVER WEST

Located at 740 N. Aberdeen St., Westerly is a mixed-used development by Chicago-based Fifield Cos. offering 188 apartments and 2,400 sf of ground-floor retail space.

Designed by FitzGerald Associates Architects, the mid-rise building features a brick and glass façade and includes a mix of studio, one-, two- and three-bedroom units, ranging in size from 544 to 1,513 square feet, with interiors by Morgante Wilson Architects. McHugh broke ground on the project in July 2019 and completed the building in October 2020. Substantial completion was received on the project three weeks ahead of schedule despite the pandemic.

“Westerly marks the eighth project we have completed for Fifield Cos. in the last 12 years,” said Ray Cisco, Project Executive with McHugh Construction. "Our previous history with Fifield and FitzGerald facilitated a seamless experience, especially when something unexpected like a pandemic comes up.”

 

Westerly, Chicago, Fifield Cos.

Westerly, a 188-unit mixed-use apartment building in Chicago by McHugh Construction for Fifield Cos. Photo: Courtesy Fifield Cos.

 

With Westerly’s location along the city’s Hipster Highway bikeway, McHugh constructed ample bike storage and a bike kitchen for maintenance and repairs, in addition to a parking garage with 80 spaces. Building amenities include a fitness center, resident lounge, penthouse-level party room, coffee bar, conference center, and dedicated coworking space. Outdoor amenities include a landscaped sun terrace on Westerly’s third level, featuring a pool, shade cabanas, grilling stations, and private seating and dining areas.

 

JAMES MCHUGH CONSTRUCTION CO.: FOUNDED IN 1897

Since its founding in 1897, James McHugh Construction Co. has earned its reputation as a builder of landmark, one-of-a-kind structures in Chicago and other areas of the country. The company specializes in managing multimillion-dollar projects, from ground-up new construction to complex renovations and high-end interiors. As a multi-faceted general contractor, McHugh constructs high-rise concrete towers; steel structures; and buildings using alternative materials such as cold-formed steel, heavy timber, and cross-laminated timber.

McHugh has built and renovated iconic structures such as Chicago’s Marina City, Vista Tower, Trump Tower, Aqua Tower, Blackstone Hotel, Navy Pier (including the 200-foot-tall Centennial Wheel and most recently, the Sable Hotel at Navy Pier, Curio Collection by Hilton, and the Offshore Rooftop and Bar), as well as other noteworthy projects in regional markets such as Loring Park Tower in Minneapolis, Two Twelve Clayton and Westin Cupples Station in the St. Louis area, and multiple projects in Nashville and Miami. 

For more information on the company, visit www.mchughconstruction.com.

Related Stories

Multifamily Housing | Mar 4, 2022

221,000 renters identify what they want in multifamily housing, post-Covid-19

Fresh data from the 2022 NMHC/Grace Hill Renter Preferences Survey shows how remote work is impacting renters' wants and needs in apartment developments.

Projects | Mar 2, 2022

Manufacturing plant gets second life as a mixed-use development

Wire Park, a mixed-use development being built near Athens, Ga., will feature 130 residential units plus 225,000 square feet of commercial, office, and retail space. About an hour east of downtown Atlanta, the 66-acre development also will boast expansive public greenspace. 

Multifamily Housing | Feb 25, 2022

First set of multifamily properties achieve BREEAM certification in the U.S.

WashREIT says it has achieved certification on eight multifamily assets under BREEAM’s In-Use certification standard.

Multifamily Housing | Feb 24, 2022

First new, mixed-use high-rise in Detroit’s central business district in nearly 30 years opens

City Club Apartments completed two multifamily projects in 2021 in downtown Detroit including the first new, mixed-use high-rise in Detroit’s central business district in nearly 30 years.

Codes and Standards | Feb 21, 2022

More bad news on sea level rise for U.S. coastal areas

A new government report predicts sea levels in the U.S. of 10 to 12 inches higher by 2050, with some major cities on the East and Gulf coasts experiencing damaging floods even on sunny days.

Urban Planning | Feb 14, 2022

5 steps to remake suburbs into green communities where people want to live, work, and play

Stantec's John Bachmann offers proven tactic for retrofitting communities for success in the post-COVID era.

Senior Living Design | Feb 11, 2022

Design for senior living: A chat with Rocky Berg, AIA

Rob Cassidy, Editor of MULTIFAMILY Design + Construction, chats with Rocky Berg, AIA, Principal with Dallas architecture firm three, about how to design senior living communities to meet the needs of the owner, seniors, their families, and staff.

Multifamily Housing | Feb 8, 2022

Suffolk to build Alba Palm Beach

The project will feature 55 residences.

| Feb 4, 2022

New apartment complex Dixon Place honors the history of Salt Lake City

Salt Lake City’s Sugar House neighborhood has been experiencing somewhat of a renaissance as of late, and the opening of new apartment community Dixon Place continues that trend. MVE + Partners took leadership in the design of the 59-unit, Class A development.  

Sponsored | Steel Buildings | Jan 25, 2022

Multifamily + Hospitality: Benefits of building in long-span composite floor systems

Long-span composite floor systems provide unique advantages in the construction of multi-family and hospitality facilities. This introductory course explains what composite deck is, how it works, what typical composite deck profiles look like and provides guidelines for using composite floor systems. This is a nano unit course.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021