flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

McCarthy completes construction of South Region High School No. 2 in Los Angeles

McCarthy completes construction of South Region High School No. 2 in Los Angeles


By By BD+C Staff | November 4, 2011
The new South Region High School No. 2 is a part of LAUSDs $19.5 billion new school construction and modernization program to p

McCarthy Building Companies, Inc., one of Southern California’s foremost construction companies in educational facilities, recently completed construction of a new $96.7 million high school for Los Angeles Unified School District (LAUSD). Located at 6100 South Central Avenue in Los Angeles, the new South Region High School No. 2 opened for instruction on September 7, 2011.

Built to relieve overcrowding at nearby John C. Fremont Senior High School, the new South Region High School No. 2 is a part of LAUSD’s $19.5 billion new school construction and modernization program to provide a safe and healthy neighborhood school on a traditional, two-semester calendar for every student. 

 “McCarthy’s ability to successfully address all changes and unforeseen challenges while adhering to the schedule was key to the project’s success,” said Moty Eisenberg, senior project manager, contract professional for LAUSD. “As a result of a collaborative effort by the entire project team, our new high school opened on schedule and is now providing the community with a state-of-the-art educational facility while relieving overcrowded conditions at other nearby schools.”

McCarthy served as general contractor for the project which entailed construction of a 220,000-sf high school on a 16.1 acre site with capacity for up to 2,000 students. The new school consists of eight two-and three-level buildings with 75 classrooms, an administrative office, performing arts/multi-purpose/practice gym, cafeteria and food services area, media center/library, a gym and locker rooms. McCarthy also built an outdoor lunch shelter as well as athletic facilities including football and softball fields and a track and field venue with a new rubberized synthetic track surface.

Designed by Leo A Daly of Los Angeles, the nine buildings are strategically positioned to provide a rectangular perimeter barrier around a centrally located courtyard/student gathering area. The high school is sectioned into four small learning communities.

Paul Buckely, principle for Leo A Daly said that each learning community is self-contained with classrooms and laboratory facilities in each building. The athletic, library and performing arts facilities are shared among the four communities. Each classroom has state-of-the-art A/V equipment and the ADA compliant science labs feature built-in casework, fume hoods, chemical resistant countertops, sinks, gas, power and high speed data connections. All buildings are type II steel construction with the exterior skin comprised of plaster, CMU veneer and metal panels.

Certified by the Collaborative for High Performing Schools (CHPS), the new South Regional High School boasts numerous environmentally friendly elements. Some of the project’s sustainable features include: energy efficient direct/indirect lighting with automatic lighting controls; low flow lavatories; low VOC paint; high energy efficient air conditioning; operable windows; a white roof to reflect unwanted energy and reduce the amount of energy consumed and drought tolerant landscaping. Construction waste was also recycled.

BIM (Building Information Modeling) technology was used to assist in the building process for the new high school. Xcel Mechanical Systems, the project’s mechanical contractor, used AutoDesk NavisWorks project review software to create 3D models of the high school’s mechanical systems before construction began. The use of 3D modeling proved highly successful in helping visualize and resolve systems clashes in the areas that required extensive detailing such as the central plant, the underground utilities, small mechanical closets and restrooms.

 “LAUSD, Leo A Daly and McCarthy worked extremely well together,” said Senior Project Manager Andrew Raufi. “This close team collaboration allowed the project to stay ahead of schedule and complete nearly two months early despite several weeks of rain delays as well as scope additions for underground utilities, off-site street improvements and a new synthetic track and field toward the end of the project.”

Consultants for the new high school include civil engineer KPFF Consulting Engineers; electrical and mechanical engineer Donald F. Dickerson Associates; landscape architect Mia Lehrer & Associates and kitchen consultant Commercial Kitchen Design, Inc. BD+C

Related Stories

| Jul 19, 2013

Top BIM Construction Firms [2013 Giants 300 Report]

Turner, Clark Group, DPR top Building Design+Construction's 2013 ranking of the contractors and construction management firms with the most revenue from BIM-driven projects.

| Jul 19, 2013

Top BIM Engineering Firms [2013 Giants 300 Report]

Jacobs, URS, SAIC top Building Design+Construction's 2013 ranking of the engineering and engineering/architecture firms with the most revenue from BIM-driven projects.

| Jul 19, 2013

Top BIM Architecture Firms [2013 Giants 300 Report]

Gensler, HOK, HDR top Building Design+Construction's 2013 ranking of the architecture and architecture/engineering firms with the most revenue from BIM-driven projects.

| Jul 19, 2013

BIM 2.0: AEC firms share their vision for the great leap forward in BIM/VDC implementation [2013 Giants 300 Report]

We reached out to dozens of AEC firms that made our annual BIM Giants lists and asked one simple question: What does BIM 2.0 look like to you? Here’s what they had to offer.

| Jul 19, 2013

Reconstruction Sector Construction Firms [2013 Giants 300 Report]

Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 19, 2013

Best in brick: 7 stunning building façades made with brick [slideshow]

The Brick Industry Association named the winners of its 2013 Brick in Architecture Awards. Here are seven winning projects that caught our eye. 

| Jul 19, 2013

Construction lags other sectors, but momentum is building: JLL report

Although the construction recovery continues to lag other sectors as well as the overall U.S. economy, the industry is finally seeing a rebound. Commercial real estate giant Jones Lang LaSalle recently released its Summer 2013 Construction Highlights report, which found that there are some sectors (such as energy and high-tech) driving demand for construction, while a few major cities are starting to record increased levels of speculative office building developments.

| Jul 19, 2013

Must see: 220 years of development on Capitol Hill in one snazzy 3D flyover video

The Architect of the Capitol this week released a dramatic video timeline of 220 years of building development on Capitol Hill.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021