flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

McCarthy completes construction of South Region High School No. 2 in Los Angeles

McCarthy completes construction of South Region High School No. 2 in Los Angeles


By By BD+C Staff | November 4, 2011
The new South Region High School No. 2 is a part of LAUSDs $19.5 billion new school construction and modernization program to p

McCarthy Building Companies, Inc., one of Southern California’s foremost construction companies in educational facilities, recently completed construction of a new $96.7 million high school for Los Angeles Unified School District (LAUSD). Located at 6100 South Central Avenue in Los Angeles, the new South Region High School No. 2 opened for instruction on September 7, 2011.

Built to relieve overcrowding at nearby John C. Fremont Senior High School, the new South Region High School No. 2 is a part of LAUSD’s $19.5 billion new school construction and modernization program to provide a safe and healthy neighborhood school on a traditional, two-semester calendar for every student. 

 “McCarthy’s ability to successfully address all changes and unforeseen challenges while adhering to the schedule was key to the project’s success,” said Moty Eisenberg, senior project manager, contract professional for LAUSD. “As a result of a collaborative effort by the entire project team, our new high school opened on schedule and is now providing the community with a state-of-the-art educational facility while relieving overcrowded conditions at other nearby schools.”

McCarthy served as general contractor for the project which entailed construction of a 220,000-sf high school on a 16.1 acre site with capacity for up to 2,000 students. The new school consists of eight two-and three-level buildings with 75 classrooms, an administrative office, performing arts/multi-purpose/practice gym, cafeteria and food services area, media center/library, a gym and locker rooms. McCarthy also built an outdoor lunch shelter as well as athletic facilities including football and softball fields and a track and field venue with a new rubberized synthetic track surface.

Designed by Leo A Daly of Los Angeles, the nine buildings are strategically positioned to provide a rectangular perimeter barrier around a centrally located courtyard/student gathering area. The high school is sectioned into four small learning communities.

Paul Buckely, principle for Leo A Daly said that each learning community is self-contained with classrooms and laboratory facilities in each building. The athletic, library and performing arts facilities are shared among the four communities. Each classroom has state-of-the-art A/V equipment and the ADA compliant science labs feature built-in casework, fume hoods, chemical resistant countertops, sinks, gas, power and high speed data connections. All buildings are type II steel construction with the exterior skin comprised of plaster, CMU veneer and metal panels.

Certified by the Collaborative for High Performing Schools (CHPS), the new South Regional High School boasts numerous environmentally friendly elements. Some of the project’s sustainable features include: energy efficient direct/indirect lighting with automatic lighting controls; low flow lavatories; low VOC paint; high energy efficient air conditioning; operable windows; a white roof to reflect unwanted energy and reduce the amount of energy consumed and drought tolerant landscaping. Construction waste was also recycled.

BIM (Building Information Modeling) technology was used to assist in the building process for the new high school. Xcel Mechanical Systems, the project’s mechanical contractor, used AutoDesk NavisWorks project review software to create 3D models of the high school’s mechanical systems before construction began. The use of 3D modeling proved highly successful in helping visualize and resolve systems clashes in the areas that required extensive detailing such as the central plant, the underground utilities, small mechanical closets and restrooms.

 “LAUSD, Leo A Daly and McCarthy worked extremely well together,” said Senior Project Manager Andrew Raufi. “This close team collaboration allowed the project to stay ahead of schedule and complete nearly two months early despite several weeks of rain delays as well as scope additions for underground utilities, off-site street improvements and a new synthetic track and field toward the end of the project.”

Consultants for the new high school include civil engineer KPFF Consulting Engineers; electrical and mechanical engineer Donald F. Dickerson Associates; landscape architect Mia Lehrer & Associates and kitchen consultant Commercial Kitchen Design, Inc. BD+C

Related Stories

Architects | Jan 29, 2020

Frank Lloyd Wright’s architecture school is closing

The school was established in 1932.

Libraries | Jan 23, 2020

Information or community center: The next generation of libraries must be both

Are libraries still relevant in a digital world?

Green | Jan 10, 2020

How the new EC3 tool raises the bar on collective action

Nearly 50 AEC industry organizations partnered to develop the groundbreaking Embodied Carbon in Construction Calculator.

Architects | Jan 9, 2020

AIA selects recipients for the 2020 Regional & Urban Design Awards

The 2020 Regional & Urban Design program recognizes the best in urban design, regional and city planning and community development.

Building Technology | Jan 7, 2020

Tariff whiplash for bifacial solar modules

Bifacial solar systems offer many advantages over traditional systems.

Sponsored | HVAC | Jan 6, 2020

Maximize Energy Efficiency in Class A Office Buildings With Modern Building Systems

Energy-efficient building design starts with the building envelope, but the building systems have a tremendous impact on energy use as well.

Life of an Architect Podcast | Jan 6, 2020

5 most popular Life of an Architect podcast episodes of 2019

Architects Bob Borson, FAIA, and Andrew Hawkins, AIA, LEED AP, produced 25 episodes of the Life of an Architect podcast in 2019. Here are the five most popular episodes of Life of an Architect based on the number of downloads.  

Architects | Jan 6, 2020

Merger expands HED’s presence in SoCal

Puchlik Design Associates, its new addition, specializes in healthcare design.

Steel Buildings | Jan 3, 2020

5 reasons to enter the $20,000 Forge Prize

Calling all emerging architects. Don’t miss out on your chance to enter the $20,000 Forge Prize. Submissions for Stage 1 judging are due January 15.

GIANTS 19 PREMIUM | Dec 23, 2019

Top 90 Sports Facilities Architecture Firms for 2019

Populous, HKS, HOK, Gensler, and HNTB top the rankings of the nation's largest sports facilities sector architecture and architecture engineering (AE) firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021