flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

McCarthy completes construction of South Region High School No. 2 in Los Angeles

McCarthy completes construction of South Region High School No. 2 in Los Angeles


By By BD+C Staff | November 4, 2011
The new South Region High School No. 2 is a part of LAUSDs $19.5 billion new school construction and modernization program to p

McCarthy Building Companies, Inc., one of Southern California’s foremost construction companies in educational facilities, recently completed construction of a new $96.7 million high school for Los Angeles Unified School District (LAUSD). Located at 6100 South Central Avenue in Los Angeles, the new South Region High School No. 2 opened for instruction on September 7, 2011.

Built to relieve overcrowding at nearby John C. Fremont Senior High School, the new South Region High School No. 2 is a part of LAUSD’s $19.5 billion new school construction and modernization program to provide a safe and healthy neighborhood school on a traditional, two-semester calendar for every student. 

 “McCarthy’s ability to successfully address all changes and unforeseen challenges while adhering to the schedule was key to the project’s success,” said Moty Eisenberg, senior project manager, contract professional for LAUSD. “As a result of a collaborative effort by the entire project team, our new high school opened on schedule and is now providing the community with a state-of-the-art educational facility while relieving overcrowded conditions at other nearby schools.”

McCarthy served as general contractor for the project which entailed construction of a 220,000-sf high school on a 16.1 acre site with capacity for up to 2,000 students. The new school consists of eight two-and three-level buildings with 75 classrooms, an administrative office, performing arts/multi-purpose/practice gym, cafeteria and food services area, media center/library, a gym and locker rooms. McCarthy also built an outdoor lunch shelter as well as athletic facilities including football and softball fields and a track and field venue with a new rubberized synthetic track surface.

Designed by Leo A Daly of Los Angeles, the nine buildings are strategically positioned to provide a rectangular perimeter barrier around a centrally located courtyard/student gathering area. The high school is sectioned into four small learning communities.

Paul Buckely, principle for Leo A Daly said that each learning community is self-contained with classrooms and laboratory facilities in each building. The athletic, library and performing arts facilities are shared among the four communities. Each classroom has state-of-the-art A/V equipment and the ADA compliant science labs feature built-in casework, fume hoods, chemical resistant countertops, sinks, gas, power and high speed data connections. All buildings are type II steel construction with the exterior skin comprised of plaster, CMU veneer and metal panels.

Certified by the Collaborative for High Performing Schools (CHPS), the new South Regional High School boasts numerous environmentally friendly elements. Some of the project’s sustainable features include: energy efficient direct/indirect lighting with automatic lighting controls; low flow lavatories; low VOC paint; high energy efficient air conditioning; operable windows; a white roof to reflect unwanted energy and reduce the amount of energy consumed and drought tolerant landscaping. Construction waste was also recycled.

BIM (Building Information Modeling) technology was used to assist in the building process for the new high school. Xcel Mechanical Systems, the project’s mechanical contractor, used AutoDesk NavisWorks project review software to create 3D models of the high school’s mechanical systems before construction began. The use of 3D modeling proved highly successful in helping visualize and resolve systems clashes in the areas that required extensive detailing such as the central plant, the underground utilities, small mechanical closets and restrooms.

 “LAUSD, Leo A Daly and McCarthy worked extremely well together,” said Senior Project Manager Andrew Raufi. “This close team collaboration allowed the project to stay ahead of schedule and complete nearly two months early despite several weeks of rain delays as well as scope additions for underground utilities, off-site street improvements and a new synthetic track and field toward the end of the project.”

Consultants for the new high school include civil engineer KPFF Consulting Engineers; electrical and mechanical engineer Donald F. Dickerson Associates; landscape architect Mia Lehrer & Associates and kitchen consultant Commercial Kitchen Design, Inc. BD+C

Related Stories

Building Team | Jun 14, 2022

Thinking beyond the stadium: the future of district development

Traditional sports and entertainment venues are fading as teams and entertainment entities strive to move toward more diversified entertainment districts.

Codes and Standards | Jun 14, 2022

Hospitals’ fossil fuel use trending downward, but electricity use isn’t declining as much

The 2021 Hospital Energy and Water Benchmarking Survey by Grumman|Butkus Associates found that U.S. hospitals’ use of fossil fuels is declining since the inception of the annual survey 25 years ago, but electricity use is dipping more slowly.

Healthcare Facilities | Jun 13, 2022

University of Kansas Health System cancer care floors foster community and empathy

On three floors of Cambridge Tower A at The University of Kansas Health System in Kansas City, patients being treated for blood cancers have a dedicated space that not only keeps them safe during immune system comprising treatments, but also provide feelings of comfort and compassion.

Building Team | Jun 13, 2022

Ware Malcomb promotes Matt Chaiken to vice president

Ware Malcomb, an award-winning international design firm, today announced that Matt Chaiken has been promoted to Vice President in the firm’s Denver office.

Building Team | Jun 13, 2022

Partnership rethinks emergency shelters to turn them into sustainable, resilient homes

Holcim and the Norman Foster Foundation have struck a partnership to rethink emergency shelters to turn them into sustainable and resilient homes.

Building Team | Jun 13, 2022

A mixed-used building to rise above Fort Lauderdale, with views of downtown and the ocean

ODA, a New York-based architecture and design studio, recently released renderings of Ombelle, a project including two residential towers in Fort Lauderdale, Fla. 

Office Buildings | Jun 13, 2022

San Antonio’s electric utility HQ to transform into a modern office building

In San Antonio, Tex., the former headquarters of CPS Energy, the city’s electric utility, is slated to transform into 100,000 square feet of office and retail space on San Antonio’s famed River Walk.

Cultural Facilities | Jun 10, 2022

After 10 Years, Taiwan’s new Taipei Music Center Reaches the Finish Line

RUR Architecture has finished the Taipei Music Center (TMC), turning a 22-acre (9-hectare) site into a new urban arts district.

Building Technology | Jun 9, 2022

GSA Green Proving Ground program selects six innovative building technologies for evaluation

The U.S. General Services Administration’s (GSA) Green Proving Ground program, in collaboration with the U.S. Department of Energy, has selected six innovative building technologies for evaluation in GSA’s inventory.

University Buildings | Jun 9, 2022

IDEA Factory at U. of Maryland defies gravity

The E.A. Fernandez IDEA Factory at the University of Maryland’s A. James Clark School of Engineering has a gravity-defying form: The seven-story building’s solid upper floors emerge above the lighter, mostly glass base.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021