Immediately upon entering Mattress Firm’s new 130,000-sf BEDQuarters building, the fact that the company deals in mattresses is on full display. The statement lobby has a front desk decorated with bed coils, puffy, cloud-like pendants that hang from the ceiling, and wayfinding signage inspired by the company’s Comfort by Color theme to direct visitors and team members alike.
The headquarters building, designed by tvsdesign, is meant to reflect the Mattress Firm culture. In order to accomplish this goal, tvsdesign and Mattress Firm took feedback from 300 employees about what they would like to see in the new building based on space requirements, work habits, culture, and amenities. “We began the project with a 10-week Vision phase to get to know their culture firsthand, and the final product is a clear reflection of Mattress Firm’s dedication to growth,” says tvsdesign President Janet Simpson in a release.
Photo courtesy of tvsdesign.
The feedback helped to create a workplace packed with amenities such as a ping pong table, a library, indoor swings, arcade games, free soft serve ice cream, and, obviously, because it is a mattress company, nap rooms. Other features include numerous collaboration spaces that comprise a coffee shop and a café. These spaces provide plenty of opportunities for employees to gather and work together.
Photo courtesy of tvsdesign.
Project planning began in September 2015 and Mattress Firm associates moved into the space just one year later.
Photo courtesy of tvsdesign.
Photo courtesy of tvsdesign.
Photo courtesy of tvsdesign.
Photo courtesy of tvsdesign.
Related Stories
| Apr 11, 2014
ULI report documents business case for building healthy projects
Sustainable and wellness-related design strategies embody a strong return on investment, according to a report by the Urban Land Institute.
| Apr 11, 2014
First look: KPF's designs for DreamWorks in the massive Shanghai DreamCenter
Two blocks of offices will be centerpiece of new cultural and lifestyle district in the West Bund Media Port.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 31, 2014
Removable flood prevention system installed in one of New York City's largest office buildings
EKO Flood Protection created a flood prevention solution for one of New York City's largest office buildings, 55 Water Street, that can be put up in 8 hours by a crew of 30 people.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 25, 2014
World's tallest towers: Adrian Smith, Gordon Gill discuss designing Burj Khalifa, Kingdom Tower
The design duo discusses the founding of Adrian Smith + Gordon Gill Architects and the design of the next world's tallest, Kingdom Tower, which will top the Burj Khalifa by as much as a kilometer.
| Mar 24, 2014
Frank Lloyd Wright's S.C. Johnson Research Tower to open to the public—32 years after closing
The 14-story tower, one of only two Wright-designed high-rises to be built, has been off limits to the public since its construction in 1950.
| Mar 21, 2014
Forget wood skyscrapers - Check out these stunning bamboo high-rise concepts [slideshow]
The Singapore Bamboo Skyscraper competition invited design teams to explore the possibilities of using bamboo as the dominant material in a high-rise project for the Singapore skyline.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.