flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Massive ‘healthcare village’ in Nevada touted as world’s largest healthcare project

Massive ‘healthcare village’ in Nevada touted as world’s largest healthcare project

The $1.2 billion Union Village project is expected to create 12,000 permanent jobs when completed by 2024.  


By John Caulfield, Senior Editor | October 8, 2014
Rendering courtesy Union Village, HKS
Rendering courtesy Union Village, HKS

Touted as the world’s largest healthcare project, the 170-unit, $1.2 billion Union Village finally broke ground on October 8 in this Las Vegas suburb. 

The village, which has been in the works since 2010, is set to start construction early next year, with the first building being an acute-care hospital on 38 acres, according to the Las Vegas Journal-Review. The Valley Health System purchased this land for this facility, which will be its sixth hospital in the state.

The complex is slated to include a 315-bed hospital, and 200-bed nursing facility with long-term acute care, Alzheimer’s care, and assisted living, Healthcare Finance News reports. The hospital and medical center are scheduled to open in late 2016, according to the Journal-Review.

The goal of this village, according to its website, is to create a live-work-play environment that integrates world-class healthcare with retail, entertainment, cultural and residential centers. Nevada Gov. Brian Sandoval, who attended the groundbreaking, calls the village “a Gateway between the city of Henderson and all of Nevada.” And its medical facilities will provide all levels of healthcare whatever the age of the patient.

In April 2011, the city of Henderson approved an agreement to sell a 151 acres of city-owned property for this project for $11.6 million, according to the Las Vegas Sun’s website. At the time it quoted David Mathis, president and CEO of the Nevada Health Care Alliance, who said Union Village would provide a much-needed boost to medical infrastructure in Southern Nevada. 

 

 

Craig Johnson, a senior living veteran of 20 years and the founder of Union Village, said the village would consist of four parts: the medical facilities in Union Centre; retail, offices, and residential apartments in Union Plaza; a senior community in Union Place; and a civic and cultural center in Union Park.

The buildout is expected to take a decade, reports Healthcare Finance News. The project will create 5,000 construction jobs and 12,000 healthcare and retail jobs, as well as contribute $5 billion to local and state coffers through income and property taxes over its anticipated 80-year lifespan.

Housing for 1,000 seniors will be built, along with at least 350 market-rate condominiums, Johnson told the Journal-Review. The village complex is also expected to include a movie theater, health club and hotel. 

The Building Team includes: Hammes Company, Haskell, HKS, Juliet Cos., and Penta Building Group.

Related Stories

| Jan 20, 2011

Worship center design offers warm and welcoming atmosphere

The Worship Place Studio of local firm Ziegler Cooper Architects designed a new 46,000-sf church complex for the Pare de Sufrir parish in Houston.

| Jan 20, 2011

Construction begins on second St. Louis community center

O’Fallon Park Recreation Complex in St. Louis, designed by local architecture/engineering firm KAI Design & Build, will feature an indoor aquatic park with interactive water play features, a lazy river, water slides, laps lanes, and an outdoor spray and multiuse pool.

| Jan 20, 2011

Community college to prepare next-gen Homeland Security personnel

The College of DuPage, Glen Ellyn, Ill., began work on the Homeland Security Education Center, which will prepare future emergency personnel to tackle terrorist attacks and disasters. The $25 million, 61,100-sf building’s centerpiece will be an immersive interior street lab for urban response simulations.

| Jan 19, 2011

Industrial history museum gets new home in steel plant

The National Museum of Industrial History recently renovated the exterior of a 1913 steel plant in Bethlehem, Pa., to house its new 40,000-sf exhibition space. The museum chose VOA Associates, which is headquartered in Chicago, to complete the design for the exhibit’s interior. The exhibit, which has views of five historic blast furnaces, will feature artifacts from the Smithsonian Institution to illustrate early industrial America.

| Jan 19, 2011

Baltimore mixed-use development combines working, living, and shopping

The Shoppes at McHenry Row, a $117 million mixed-use complex developed by 28 Walker Associates for downtown Baltimore, will include 65,000 sf of office space, 250 apartments, and two parking garages. The 48,000 sf of main street retail space currently is 65% occupied, with space for small shops and a restaurant remaining.

| Jan 19, 2011

Biomedical research center in Texas to foster scientific collaboration

The new Health and Biomedical Sciences Center at the University of Houston will facilitate interaction between scientists in a 167,000-sf, six-story research facility. The center will bring together researchers from many of the school’s departments to collaborate on interdisciplinary projects. The facility also will feature an ambulatory surgery center for the College of Optometry, the first of its kind for an optometry school. Boston-based firms Shepley Bulfinch and Bailey Architects designed the project.

| Jan 19, 2011

San Diego casino renovations upgrade gaming and entertainment

The Sycuan Casino in San Diego will get an update with a $27 million, 245,000-sf renovation. Hnedak Bobo Group, Memphis, Tenn., and Cleo Design, Las Vegas, drew design inspiration from the historic culture of the Sycuan tribe and the desert landscape, creating a more open space with better circulation. Renovation highlights include a new “waterless” water entry feature and new sports bar and grill, plus updates to gaming, poker, off-track-betting, retail, and bingo areas. The local office of San Francisco-based Swinerton Builders will provide construction services.

| Jan 19, 2011

Extended stay hotel aims to provide comfort of home

Housing development company Campus Apartments broke ground on a new extended stay hotel that will serve the medical and academic facilities in Philadelphia’s University City, including the University of Pennsylvania and the Children’s Hospital of Philadelphia. The 11,000-sf hotel will operate under Hilton’s Homewood Suites brand, with 136 suites with full kitchens and dining and work areas. A part of the city’s EnergyWorks loan program, the project aims for LEED with a green roof, low-flow fixtures, and onsite stormwater management. Local firms Alesker & Dundon Architects and GC L.F. Driscoll Co. complete the Building Team.

| Jan 19, 2011

New Fort Hood hospital will replace aging medical center

The Army Corps of Engineers selected London-based Balfour Beatty and St. Louis-based McCarthy to provide design-build services for the Fort Hood Replacement Hospital in Texas, a $503 million, 944,000-sf complex partially funded by the American Recovery and Reinvestment Act. The firm plans to use BIM for the project, which will include outpatient clinics, an ambulance garage, a central utility plant, and three parking structures. Texas firms HKS Architects and Wingler & Sharp will participate as design partners. The project seeks LEED Gold.

| Jan 19, 2011

Museum design integrates Greek history and architecture

Construction is under way in Chicago on the National Hellenic Museum, the nation’s first museum devoted to Greek history and culture. RTKL designed the 40,000-sf limestone and glass building to include such historic references as the covered walkway of classical architecture and the natural wood accents of Byzantine monasteries. The museum will include a research library and oral history center, plus a 3,600-sf rooftop terrace featuring three gardens. The project seeks LEED Silver.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021