flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mass timber is a natural choice for building recycling through deconstruction

Codes and Standards

Mass timber is a natural choice for building recycling through deconstruction

Designing wood buildings to optimize recovery of materials for disassembly aids carbon sequestration.


By Peter Fabris, Contributing Editor | August 4, 2021

Courtesy Pixabay

Mass timber is an ideal material for structures designed for deconstruction and offers continued carbon storage after the expiration of the building’s lifespan, as well as removing material from the waste stream.

Advocates for this strategy point out that the wood not only sequesters carbon while the building is in use, but also continues to do so after it is disassembled and the wood is reused. A broader concept, Design for Disassembly and Adaptability, aims to extend the life cycle of buildings and their components, allowing the building to be updated, maintained, and modified more easily. And at the end of its useful life, disassembly allows for more efficient collection and reuse of materials and components.

Designing for disassembly requires professionals to rethink the way buildings are put together so that the materials can be disassembled and reused. This can be a complex undertaking that bucks existing common practices.

Demolitions are usually carried out quickly, making it difficult to reuse a large part of the materials. To counteract that impulse, the project should seek methods, solutions, and products that lend themselves to easier disassembly. In addition, specifying good quality materials that do not contain harmful and polluting chemicals make the parts more attractive for reuse.

Related Stories

Codes and Standards | Mar 1, 2019

$1 billion Boston hospital project to include extensive disaster resiliency features

Mass. General expansion will be designed for four days of shelter in place.

Codes and Standards | Mar 1, 2019

U.S. cities have become more dangerous for bicyclists and pedestrians

Reduced speed limits, traffic calming, better education seen as keys to improvement.

Codes and Standards | Feb 28, 2019

High-income renters now the fastest-growing housing market segment

Growth is fastest in mid-sized cities with strong economies.

Codes and Standards | Feb 27, 2019

Katerra launches software platform for ‘entire lifecycle of the building process’

Firm is accepting industry applicants to test the product.

Codes and Standards | Feb 26, 2019

AAMA updates two specifications for test methods related to seismic drift

For evaluating window wall, curtain wall and storefront systems.

Codes and Standards | Feb 21, 2019

Researchers develop software that can calculate potential solar energy yield at any location

Accounts for dynamic shading from trees, buildings and other structures.

Codes and Standards | Feb 20, 2019

Hospitals not making much progress in reducing their carbon footprint

Energy benchmarking survey shows flat emissions pattern over past 20 years.

Codes and Standards | Feb 15, 2019

Super Bowl stadium helps alleviate Atlanta’s flood problems

Capacity to store more than 2 million gallons of storm water on site.

Codes and Standards | Feb 14, 2019

ISO publishes first global BIM standards

Based on British standard and a publicly available standard.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021