flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mass timber is a natural choice for building recycling through deconstruction

Codes and Standards

Mass timber is a natural choice for building recycling through deconstruction

Designing wood buildings to optimize recovery of materials for disassembly aids carbon sequestration.


By Peter Fabris, Contributing Editor | August 4, 2021

Courtesy Pixabay

Mass timber is an ideal material for structures designed for deconstruction and offers continued carbon storage after the expiration of the building’s lifespan, as well as removing material from the waste stream.

Advocates for this strategy point out that the wood not only sequesters carbon while the building is in use, but also continues to do so after it is disassembled and the wood is reused. A broader concept, Design for Disassembly and Adaptability, aims to extend the life cycle of buildings and their components, allowing the building to be updated, maintained, and modified more easily. And at the end of its useful life, disassembly allows for more efficient collection and reuse of materials and components.

Designing for disassembly requires professionals to rethink the way buildings are put together so that the materials can be disassembled and reused. This can be a complex undertaking that bucks existing common practices.

Demolitions are usually carried out quickly, making it difficult to reuse a large part of the materials. To counteract that impulse, the project should seek methods, solutions, and products that lend themselves to easier disassembly. In addition, specifying good quality materials that do not contain harmful and polluting chemicals make the parts more attractive for reuse.

Related Stories

Codes and Standards | May 1, 2015

Department of Energy asks for feedback on cost-effectiveness of building energy codes

DOE’s RFI wants input on how to improve methodology on cost assessment.

Codes and Standards | Apr 22, 2015

New York State renews design-build authority

Five state agencies are allowed to use design-build on certain projects.

Codes and Standards | Apr 22, 2015

OSHA’s estimated cost of silica rule said to underestimate impact by $4.5 billion annually

The coalition says that OSHA’s flawed cost estimates point to flaws in the rule, and has urged the federal agency to reconsider its approach. 

Codes and Standards | Apr 22, 2015

GBCI renamed Green Business Certification Inc.

The name change reflects the organization’s expanded certification and credentialing services.

Multifamily Housing | Apr 16, 2015

Seattle’s size restriction on micro apartments blamed for rise in rents

Seattle’s city planner recently said that the council’s new rules have made small apartments more expensive to build and charged the board with “overreaching” and not giving micro-housing “a fair shake.”

Green | Apr 16, 2015

New version of Building Energy Data Exchange Specification launched

BEDES is a dictionary that facilitates consistent exchange of building characteristics and energy use data between tools and databases in the building energy efficiency sector.

Codes and Standards | Apr 16, 2015

New York tops U.S. cities in walkability

Revitalization pushes Detroit and New Orleans up the rankings

Green | Apr 14, 2015

USGBC will recognize energy and water standards for the Living Building Challenge

This move means that projects achieving the energy and water requirements in Living Building Challenge will be considered as technically equivalent to LEED.

Codes and Standards | Apr 14, 2015

New York City preparing new codes for evacuation elevators

New York City’s Fire, Buildings, and City Planning Departments in New York are writing rules to govern occupant-evacuation elevators, reflecting a change in philosophy of how to evacuate people from skyscrapers in an emergency.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021