Maryland's Prince George's County must comply with a federal "pollution diet" to clean up the Chesapeake Bay. Over the next 10 years, the county must convert 15,000 acres of watertight surfaces—almost 5% of the county's total area—into surfaces that absorb or treat rainwater.
That will require adding some 46,000 stormwater devices. The county is turning to a novel approach to get the rain gardens, cisterns, permeable pavements, and other devices for filtering and absorbing stormwater built.
These features are geared to slow the rapid runoff from roads and rooftops in order to reduce pollution that flows into sewers and which then makes its way into the bay.
Its partnership with Corvias Solutions, which is in charge of designing, building, and maintaining the improvements, has been hired to convert 2,000 acres by 2017. If the company performs well, that amount could double.
The county will also have its own team of workers to work on another 2,000 acres. Officials will be able compare the performance of the two teams and then decide how to proceed.
Related Stories
Codes and Standards | May 20, 2020
St. Louis is first Midwest city to pass building energy performance standard
Allows owners broad flexibility on how to achieve goals.
Codes and Standards | May 20, 2020
Supreme Court says Georgia cannot copyright its entire official code
Ruling may have implications for other states claiming copyright for building codes.
Codes and Standards | May 18, 2020
Strategies to reduce personal contact in multifamily properties
Design can improve health amid COVID-19 pandemic.
Codes and Standards | May 18, 2020
Canada Green Building Council says building industry lacks zero-carbon skills, knowledge
Net-zero target requires shift in thinking and practices.
Codes and Standards | May 18, 2020
California’s grid can support all-electric buildings
Load-shifting will help reduce peak demand.
Codes and Standards | May 15, 2020
European cities to revamp transportation after pandemic reopening
Road closures, new rules for public transit will be imposed.
Codes and Standards | May 14, 2020
Washington State construction industry restart plan has three phases
In state with earliest COVID-19 cases, advisory group developing priorities based on risk.
Codes and Standards | May 14, 2020
More mass timber beam and column options available in the U.S.
Freres Lumber unveils new line of structural elements suitable for high-rise buildings.
Codes and Standards | May 13, 2020
Researchers flag insufficient training for construction workers on healthcare projects
May contribute to fungal disease outbreaks that endanger patients
Codes and Standards | May 8, 2020
New NIBS report evaluates natural disaster mitigation strategies
Document examines strengthening buildings for flood, wind, wildfires, and earthquakes.