flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Maryland’s Prince George County turns to P3s to build green infrastructure

Codes and Standards

Maryland’s Prince George County turns to P3s to build green infrastructure

County must convert 15,000 acres of impermeable surface area to capture stormwater runoff.


By Peter Fabris, Contributing Editor | June 24, 2015
Maryland’s Prince George County turns to P3s to build green infrastructure

A new order was issued that requires Maryland's Prince George's County to clean up Chesapeak Bay. Image: Pixabay

Maryland's Prince George's County must comply with a federal "pollution diet" to clean up the Chesapeake Bay. Over the next 10 years, the county must convert 15,000 acres of watertight surfaces—almost 5% of the county's total area—into surfaces that absorb or treat rainwater. 

That will require adding some 46,000 stormwater devices. The county is turning to a novel approach to get the rain gardens, cisterns, permeable pavements, and other devices for filtering and absorbing stormwater built.

These features are geared to slow the rapid runoff from roads and rooftops in order to reduce pollution that flows into sewers and which then makes its way into the bay.

Its partnership with Corvias Solutions, which is in charge of designing, building, and maintaining the improvements, has been hired to convert 2,000 acres by 2017. If the company performs well, that amount could double. 

The county will also have its own team of workers to work on another 2,000 acres. Officials will be able compare the performance of the two teams and then decide how to proceed.

Related Stories

Codes and Standards | Jul 7, 2021

Surfside condo collapse could spur new legislation

Natl. Institute of Standards and Technology is investigating.

Codes and Standards | Jul 7, 2021

Intl. Code Council appoints committees to lead energy code development

One-third of appointees are government regulators.

Codes and Standards | Jul 1, 2021

COVID-19 made payment delays to contractors much worse

Only one in ten companies is always getting paid in full.

Codes and Standards | Jun 30, 2021

New resource for public sector organizations to develop energy data management program

Dept. of Energy document contains more than 30 examples of successful implementations.

Codes and Standards | Jun 29, 2021

Biden China policy may spur more increased U.S. PV manufacturing capacity

Senate bill proposes advanced solar manufacturing production credit.

Codes and Standards | Jun 28, 2021

Local and state building energy performance standards aim to curb climate change

Owners must up the ante on operations and retrofits.

Codes and Standards | Jun 24, 2021

Biden Administration will restore ‘Waters of the U.S.’ protections ended by Trump

Early revision more likely to hold up in court, says legal expert.

Codes and Standards | Jun 23, 2021

Denver unveils renewable heating and cooling plan

City releases roadmap to decarbonizing existing homes and buildings.

Codes and Standards | Jun 22, 2021

Actually, few companies plan to significantly reduce their office footprint

CBRE survey shows that many firms will continue with hybrid work.

Codes and Standards | Jun 21, 2021

Vancouver, B.C., may delay new zero emissions building standards

Building permit delays may postpone new standards by a year.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021