flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Maryland’s Prince George County turns to P3s to build green infrastructure

Codes and Standards

Maryland’s Prince George County turns to P3s to build green infrastructure

County must convert 15,000 acres of impermeable surface area to capture stormwater runoff.


By Peter Fabris, Contributing Editor | June 24, 2015
Maryland’s Prince George County turns to P3s to build green infrastructure

A new order was issued that requires Maryland's Prince George's County to clean up Chesapeak Bay. Image: Pixabay

Maryland's Prince George's County must comply with a federal "pollution diet" to clean up the Chesapeake Bay. Over the next 10 years, the county must convert 15,000 acres of watertight surfaces—almost 5% of the county's total area—into surfaces that absorb or treat rainwater. 

That will require adding some 46,000 stormwater devices. The county is turning to a novel approach to get the rain gardens, cisterns, permeable pavements, and other devices for filtering and absorbing stormwater built.

These features are geared to slow the rapid runoff from roads and rooftops in order to reduce pollution that flows into sewers and which then makes its way into the bay.

Its partnership with Corvias Solutions, which is in charge of designing, building, and maintaining the improvements, has been hired to convert 2,000 acres by 2017. If the company performs well, that amount could double. 

The county will also have its own team of workers to work on another 2,000 acres. Officials will be able compare the performance of the two teams and then decide how to proceed.

Related Stories

Codes and Standards | Jun 12, 2018

Congestion pricing for cars is effective in reducing traffic, but a difficult sell

After three years, traffic congestion declined by 30% in London.

Codes and Standards | Jun 11, 2018

First RFP requiring modular construction on New York City housing project issued

Part of Housing 2.0 modular construction initiative.

Codes and Standards | Jun 6, 2018

Buffalo, N.Y., contractor exec pleads guilty to fraud for bid rigging on $750 million contract

LPCiminelli stops functioning as GC in fallout from the case.

Codes and Standards | Jun 6, 2018

LEED should be updated to combat climate change

Hasn’t kept pace with urgency of problem, says clean energy investor.

Codes and Standards | Jun 5, 2018

Sports stadiums and arenas showcase sustainability features

Green venues save owners money, gain positive publicity.

Codes and Standards | Jun 4, 2018

L.A. must transition to cleaner energy, boost transit to reach sustainability goals

City aims to reduce GHGs 60% by 2035 and 80% by 2050.

Codes and Standards | Jun 4, 2018

Washington D.C.’s flattened skyline can be a virtue

Zoning ordinance that ties building heights to width of streets dictates form.

Codes and Standards | May 30, 2018

Silicon Valley cities considering taxes aimed at large employers

The aim is to offset the impact on housing costs and homelessness by tech companies.

Codes and Standards | May 30, 2018

OSHA proposes new crane operator safety rule

Would provide long-term clarity on certification requirements.

Codes and Standards | May 29, 2018

Government support helping to drive demand for green building materials

Market projects to grow 12.5% annually between 2013 and 2019.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021