flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Maryland County to build six schools in P3 arrangement

Contractors

Maryland County to build six schools in P3 arrangement

Prince George’s County, Md., is the first jurisdiction in the nation to use public-private partnership for school construction.


By Peter Fabris, Contributing Editor  | September 1, 2020
Maryland County to build six schools in P3 arrangement

Photo: Radhika Kshirsagar via Wikimedia Commons

   

Prince George’s County, Md., plans to build six new schools costing nearly $1 billion in a P3 public-private partnership.

The county, which will select a private company to handle construction and maintenance, will be the first jurisdiction in the U.S. to build schools under a P3 plan, according to the Washington Informer. The cost would have an annual cap of $32 million for 30 years to build the schools for an estimated total of $960 million.

The RFP calls for at least 30% of the contract value to be procured through minority and county-based businesses. The first schools would be occupied by July 15, 2023, and all schools would be completed a year later.

After construction is completed, the school system would regain control of the buildings.

The county will receive some state funding toward the projects.

Related Stories

| Apr 12, 2013

Chicago rail conversion puts local twist on High Line strategy

Plans are moving forward to convert an unused, century-old Chicago rail artery to a 2.7 mile, 13 acre recreational facility and transit corridor.

| Apr 11, 2013

AIA selects recipients of its 2013 Small Project Awards

The American Institute of Architects (AIA) has selected the ten recipients of the 2013 Small Project Awards. The AIA Small Project Awards Program, now in its tenth year, was established to recognize small-project practitioners for the high quality of their work and to promote excellence in small-project design.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021